Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20116E102 + (ML20116E102)
- ML20116E116 + (ML20116E116)
- ML20116E140 + (ML20116E140)
- 05000259/LER-1985-009-01, :on 850322,analysis of Primary Containment Isolation Sys Circuitry Revealed That Combination of Switches Could Lead to Failure of Listed Sys to Function. Caused by Design Oversight + (ML20116E149)
- ML20116E151 + (ML20116E151)
- ML20116E154 + (ML20116E154)
- 05000352/LER-1985-032, :on 850314,fire Damper in Reactor Encl Found Held Open W/Wire During Cold Shutdown.Caused by Personnel Error.Damper Closed,Fusible Link Replaced,Damper Returned to Svc & Memo Issued + (ML20116E158)
- 05000395/LER-1985-004, :on 850322,noncompliance W/Reg Guide 1.108 Requirements Re Diesel Generator Testing Identified.Caused by Test Frequency Based on Per Diesel Generator Unit Basis. Procedure Revs Initiated + (ML20116E172)
- ML20116E187 + (ML20116E187)
- ML20116E188 + (ML20116E188)
- ML20116E192 + (ML20116E192)
- 05000373/LER-1985-029-01, :on 850321,scram Occurred When Instrument 1B21-N038A Level 3 Automatic Depressurization Sys Confirmatory Level Switch Incorrectly Valved Into Svc. Caused by Personnel Error.Training Initiated + (ML20116E193)
- ML20116E202 + (ML20116E202)
- NSD-NRC-96-4781, Forwards Westinghouse Summary T/H Uncertainty Resolution Process for AP600 Passive Sys Reliability + (ML20116E212)
- ML20116E217 + (ML20116E217)
- ML20116E220 + (ML20116E220)
- ML20116E227 + (ML20116E227)
- ML20116E250 + (ML20116E250)
- NRC-85-3030, Forwards Proprietary & Nonproprietary Amend 2 to Westinghouse Advanced PWR RESAR-SP/90 Module 5, Reactor Sys, Section 4.5, Reactor Matls. Ltr Requesting Withholding Encl.Proprietary Rept Withheld (Ref 10CFR2.790) + (ML20116E252)
- ML20116E262 + (ML20116E262)
- ML20116E269 + (ML20116E269)
- PY-CEI-NRR-2080, Forwards Rev 5 to EPI-B11, Emergency Dosimetry Issue. Changes Constitute Revs,Temporary Changes or Reissued Pages + (ML20116E270)
- ML20116E278 + (ML20116E278)
- TXX-9251, Responds to NRC Re Violations Noted in Insp Rept 50-446/92-34 on 920802-0912.Corrective Actions:Training Has Been Provided to Appropriate Construction,Startup & Maintenance Personnel on Need for Thorough Work Documents + (ML20116E283)
- ML20116E287 + (ML20116E287)
- ML20116E290 + (ML20116E290)
- ML20116E295 + (ML20116E295)
- ML20116E296 + (ML20116E296)
- ML20116E299 + (ML20116E299)
- U-602063, Forwards Response to Generic Ltr 92-06,providing Update for Proposed Operator Licensing Exam Schedule & Proposed Requalification Exam Schedule + (ML20116E302)
- 1CAN119201, Informs That Jh Mueller,License Number SOP-43610 No Longer Needs to Maintain Operating License & Requests License Be Withdrawn + (ML20116E307)
- ML20116E311 + (ML20116E311)
- ML20116E324 + (ML20116E324)
- 2CAN048505, Advises That Adequate Shoulder Gap Fuel Assembly Closure Measurements Will Be Available for Cycle 5 Operation.Rept Summarizing Insp Results Will Be Submitted 45 Days After End of Outage + (ML20116E325)
- ML20116E344 + (ML20116E344)
- ML20116E346 + (ML20116E346)
- BSEP-96-0287, Forwards Response to RAI Re Request for License Amends on Power Uprate + (ML20116E348)
- ML20116E356 + (ML20116E356)
- ML20116E357 + (ML20116E357)
- B11522, Forwards Revised Response to NRC Re Lifting Devices Not Specifically Designed Per 850416 Meeting & NUREG-0612.Open Item Fully Resolved + (ML20116E358)
- ML20116E362 + (ML20116E362)
- ML20116E372 + (ML20116E372)
- ML20116E377 + (ML20116E377)
- ML20116E379 + (ML20116E379)
- ML20116E385 + (ML20116E385)
- ML20116E388 + (ML20116E388)
- ML20116E392 + (ML20116E392)
- ML20116E394 + (ML20116E394)
- ML20116E396 + (ML20116E396)
- ML20116E403 + (ML20116E403)
- ML20116E406 + (ML20116E406)