Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20116B394 + (ML20116B394)
- ML20116B395 + (ML20116B395)
- ML20116B398 + (ML20116B398)
- ML20116B401 + (ML20116B401)
- ML20116B406 + (ML20116B406)
- ML20116B412 + (ML20116B412)
- B15776, Forwards Response to RAI Re 24-month Fuel cycle-electrical Power Systems Surveillance Extensions + (ML20116B416)
- ML20116B439 + (ML20116B439)
- ML20116B440 + (ML20116B440)
- ML20116B441 + (ML20116B441)
- ML20116B448 + (ML20116B448)
- AECM-85-0109, Responds to Notice of Violation & Proposed Civil Penalty Per Enforcement Action 84-75.Corrective Actions:Standardized Definitions for Instrumentation Initiation Logic in Use. Further Mitigation of Proposed Civil Penalty Requested + (ML20116B451)
- ML20116B458 + (ML20116B458)
- 3F0796-21, Requests Extension to Reply to NOV & Proposed Imposition of Civil Penalties.W/Concurrence,Util Will Provide Response by 960909.W/o Encl + (ML20116B470)
- ML20116B493 + (ML20116B493)
- ST-HL-AE-4236, Forwards 10CFR50.46 Annual Rept Re Revisions to ECCS Model Including Current Large Break & Small Break LOCA ECCS Evaluation Peak Cladding Temps.No Change to ECCS Model Since Last Rept on 910816 + (ML20116B499)
- ML20116B500 + (ML20116B500)
- ML20116B501 + (ML20116B501)
- ML20116B505 + (ML20116B505)
- ML20116B508 + (ML20116B508)
- B15783, Provides Response to Violations Noted in Insp Rept 50-336/96-04.Corrective actions:pre-job Briefings Ensure Workers Understand Job Scope Prior to Beginning Work Including Work Procedures Involved + (ML20116B520)
- 05000321/LER-1996-010, :on 960629,failure of Turbine Overspeed Control Valve Occurred.Caused by Failed Hydraulic Actuator Diaphragm.Replaced Failed Diaphragm & HPCI Control Valve Diaphragm + (ML20116B522)
- ML20116B524 + (ML20116B524)
- 05000366/LER-1996-002-03, :on 960626,HPCI Sys Turbine Stop Valve Failed to Open.Caused by Failed Oil Pump Discharge Filter.Flushed Mechanical Trip Piston,Drained,Cleaned and Added New Oil to Reservior & Changed Oil Pump Discharge Filters + (ML20116B543)
- ML20116B544 + (ML20116B544)
- ML20116B545 + (ML20116B545)
- ML20116B550 + (ML20116B550)
- ML20116B551 + (ML20116B551)
- ML20116B558 + (ML20116B558)
- ML20116B561 + (ML20116B561)
- ML20116B569 + (ML20116B569)
- ML20116B573 + (ML20116B573)
- ML20116B574 + (ML20116B574)
- ML20116B586 + (ML20116B586)
- ML20116B589 + (ML20116B589)
- ML20116B592 + (ML20116B592)
- ML20116B596 + (ML20116B596)
- ML20116B600 + (ML20116B600)
- ML20116B601 + (ML20116B601)
- ML20116B610 + (ML20116B610)
- ML20116B614 + (ML20116B614)
- ML20116B619 + (ML20116B619)
- ST-HL-AE-4213, Responds to NRC Re Violations Noted in Insp Repts 50-498/92-07 & 50-499/92-07.Corrective Actions:Nuclear Training Will Revise Procedure That Governs Lesson Plan Development Scheduled to Be Completed by 921231 + (ML20116B630)
- ML20116B634 + (ML20116B634)
- 3F0796-19, Provides Boron Precipitation Info Requested by NRC in Ltr + (ML20116B635)
- ML20116B645 + (ML20116B645)
- ML20116B648 + (ML20116B648)
- 05000424/LER-1996-005, :on 960515,unqualified Cabling Was Used in Containment Sump Level Transmitters.Caused by Improper Installation of Cabling by Removing Outside Jacketing in Unit 1.Replaced Cabling for Both Transmitters + (ML20116B654)
- ML20116B657 + (ML20116B657)
- ML20116B673 + (ML20116B673)
- HL-5208, Forwards SE Response to Third IST Interval Program Update + (ML20116B677)