ML20116B398
| ML20116B398 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 10/26/1992 |
| From: | Woodard J SOUTHERN NUCLEAR OPERATING CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9211020182 | |
| Download: ML20116B398 (1) | |
Text
.. _ _. _ _ _ _
- e couthern Nucleat Oparating Company Post Ooce Dov I?95 Demengham, Atabama 35201 Triepwe 205 868 508G n
Southern Nudear Operating Company
- 3. o..,,,
v.ce Prescent v,e sout.v m eAxterc s, stem raw prwi IC CFR 50.90 October 26, 1992 Docket Nos. 50-348 50-364 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Joseph M. Farley Nuclear Plant Withdrawal of Proposed Changes To Quadrant Powar Tilt Ratio (0PTR) Technical Specification Gentlemen:
By letter dated February 28, 1992, Southern Nuclear Operating Company (SNC) requested a change to the Joseph M. Farley Nuclear Plant Units 1 and 2 Technical Specification 3/4.2.4, " Quadrant Power Tilt Ratio." This proposed change would have permitted the substitution of a pair of l
symmetric incore thimbles for one of the eight unique thimbles listed in the technical specification basis for purposes of incore monitoring should i
an excore power range channel fail.
As a result of a telephone conference l
held on September 24, 1992 with the NRC, SNC has decided not to pursue this l
technical specification change.
Therefore, SNC withdraws the proposed l
technical specification change request submitted on February 28, 1992.
In addition, during a telephone conversation with the NRC held on October ?2, 1992, SNC received clarificaticn that when a full core flux map is performed compliance with the peaking factor limits is assured directly without a QPTR calculation.
If there are any questions, please advise.
Respectfully submitted,
,g d., D e M \\
l M Jb Woodard BHW:cht-92.2073 l
cc:
Mr. S. D. Ebneter Mr. S. T. Hoffman Mr. G. F. Maxwell
$[U$00h
[
Ib l
3
"