.s O PSEG
~
~
i Public Servico Electric and Gas Company P.O. Box 23C dancocks Bridge, New Jersey OR x 0236 Nuclear Business Unit JUL 2 41996 LR-N96212 i
U.
S.
Nuclear Regulatory Commission Document Control Desk l
Washington, DC 20555
Dear Sir:
)
HOPE CREEK GENERATING STATION DOCKET NO. 50-354 UNIT NO. 1 LICENSEE EVENT REPORT NO. 95-033-07 This Licensee Event Report entitled " Technical Specification Surveillance Requirement Implementation Deficiencies" is being submitted pursuant to the requirements of 10CFR50.73 (a) (2) (1) (B).
This supplement documents the discovery of a Technical Specification surveillance implementation deficiency identified by the Technical Specification Surveillance Improvement Program (TSSIP).
As stated in LER 95-033-01, additional Technical Specification surveillance implementation deficiencies discovered by TSSIP with minimal safety significance will be documented in I
supplements to this LER on a periodic basis until completion of the TSSIP project.
Sincerely,
/
^ ;f' Mark Bezilla General Manager -
Hope Creek Operations Attachment RAR/tcp SORC Mtg.96-074 j
C Distribution I
LER File 9607300120 960724 PDR ADOCK 05000354
\\
S PDR The pwerisinyourlunds.
nia n, su
l t
Attachment A 1
The following items represent commitments that Public Service Electric & Gas (PSE&G) made to the Nuclear Regulatory Commission (NRC) relative to this LER (354/95-033-07).
The commitments are as follows:
The LSFT (for the TIP probe withdrawal function upon receipt of an isolation signal while the probe is being inserted into the core) will be performed by August 8, 1996.
The surveillance procedure (for the TIP probe withdrawal function upon receipt of an isolation signal while the probe is being inserted into the core) will be revised by August 8,
1996.
l 9