Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 8 to EP-103 Re Alert Response,Rev 8 to EP-104 Re Site Emergency Response & Rev 8 to EP-105 Re General Emergency Response
ML20116B574
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 03/12/1985
From:
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Shared Package
ML20116B572 List:
References
PROC-850312-01, NUDOCS 8504250443
Download: ML20116B574 (69)


Text

- .- ..

~

Page 1 of 5 3 *

. 3852069600 Revision 31

, 03/12/85

)

LIMERICK GENERATING STATION f EMERGENCY PLAN PROCEDURE INDEX t

PROCEDURE REV. DATE SIGNED DATE OF LAST NUMBER NO. TITLE BY SUPER. PERIODIC REVIEW g EP-101 3 Classification of Emeroencies 12/12/84 EP-102 7 Unusual Event Response 02/25/85 EP-103 8 Alert Response 03/12/85 -

i EP-104 8 Site Emergency Response 03/12/85 EP-105 8 General Emergency Resoonse 03/12/85 EP-106 3 Written Summary Notification 01/28/85 EP-110 5 Personnel Assembly and Accountability .02/04/85 EP-120 2 Site Emeroency Coordinator 12/12/84 EP-201 3 Technical Support Center (TSC) Activation 01/28/85

', EP-202 3 Operations Support Center (OSC) Activation 12/12/84 EP-203 4 Emergency Operations Facility (EOF) Activation 01/28/85 EP-208 4 Security Team 12/12/84 EP-210 3 Dose Assessment Team 12/12/84 l EP-211 1 Field Survey Group 02/20/85 EP-220 CANCELLED g*S EP-221 CANCELLED _ A. k EP-222 CANCELLED hv i- M EP-230 4 Chemistry Sampling ands, ( yy4- ,,

Analysis Team ,fiA -L A W12/84 EP-231 6 Operatica of Po - y.gN* gg ig Accident Sampli stems s (PASS) 01/11/85\g .

EP-232 CANCELLED ,.

g,-

8504250443 850328 PDR ADOCK 05000352 F PDR

==== we - - - .

.T. -.

. Paga 2 of 5

! $ Revision 31 03/12/85

< LIMERICK GENERATING STATION EMERGENCY PLAN PROCEDURE INDEX 3

PROCEDURE REV. DATE SIGNED DATE OF LAST y NUMBER NO. TITLE BY SUPER. PERIODIC REVIEW EP-233 4 Retrieving and Changing Sample Filters and Cartridges from the

, Containment Leak Detector During Emergencies 12/12/84 .

EP-234 4 Obtaining Containment Gas Samples from the Containment Leak Detector During Emergencies 12/12/84

, EP-235 .4 Obtaining Reactor Water Samples from Sample Sinks Following g Accident Conditions 12/12/84

EP-236 4 Obtaining Cooling Tower i Blowdown Line Water l Samples Following j Radioactive Liquid Releasa after Accident

[ Conditions 12/12/84 i EP-237 5 Obtaining the Iodine /

Particulate and/or Gas

( Samples from the North 5

' Vent Wide Range Gas Monitor (WRGM) 01/11/85 EP-238 4 Obtaining Liquid Radwaste Samples from Radwaste Sample Sink Following Accident Conditions 12/12/84 EP-240 CANCELLED EP-241 7 Sample Preparation and Handling of Highly

, Radioactive Liquid

{ Samples 02/04/85 i EP-242 4 Sample Preparation and Handling of Highly .

Radioactive Part'iculate

  • Filters and Iodi'e n Cartridges 12/12/84 EP-243 5 Sample Preparation and Handling of Highly Radioactive Gas Samples 12/12/84 EP-244 3 Offsite Analysis of High Activity Samples 03/12/85

- . . . = . , . . . . . . . - . . . ., i = :L ~

~. .

. Page 3 of 5

[ 3 Revision 31

.,. 03/12/85 LIMERICK GENERATING STATION EMERGENCY PLAN PROCEDURE INDEX PROCEDURE REV. DATE SIGNED DATE OF LAST NUMBER NO. TITLE BY SUPER. PERIODIC REVIEW EP-250 2 Personnel Safety Team 12/12/84

-. EP-251 2 Plant Survey Group 12/12/84

~

EP-252 4 Search and Rescue /First .

Aid Group 02/11/85 EP-253 0 Personnel Dosimetry, Bioassay, and l Respiratory Protection J Group 12/12/84 EP-254 3 Vehicle and Evacuee

. Control Group 02/04/85 EP-255 2 Vehicle Decontamination 12/12/84 EP-260 2 , Fire and Damage Control Team 12/12/84

! ( EP-261 2 Damage Repair Group 12/12/84 EP-272. 4 Philadelphia Electric l' Company officials Phone List 02/04/85

, EP-273 4 Limerick Station Supervision Call List 02/11/85 EP-275 CANCELLED

! EP-276 5 Fire and Damage I, . Team Phone List 01/24/85 i EP-277 6 Personnel Safety Team Phone List 02/11/85

EP-278 4 Security Team Phone List 01/28/85 EP-279 4 . Emergency Operations Facility (EOF) Group

, Phone List 01/22/85 l EP-280 6 Technical Support

[ Center Phone List 03/12/85 l EP-282 4 Government and Emergency Management

Agencies Phone List 01/22/85 c EP-284 4 Company Consultants c and Contractors L, Phone List 01/22/85 EP-287 3 Nearby Public and Industrial Users of

, Downstream Water 02/11/85

7- -

. ^. " " f " ' ~^ " Il' I. .'___1._ .. '

, Paga 4 of 5

.-i -

Revision 31 i 03/12/85 l LIMERICK GENERATING STATION EMERGENCY PLAN PROCEDURE INDEX PROCEDURE REV. DATE SIGNED DATE OF LAST NUMBER NO. TITLE BY SUPER. PERIODIC REVIEW l

EP-291 Staffing Augmentation 5 02/25/85 EP-292 6 Chemistry Sampling and Analysis Team Phone ..

_ List 01/22/85 -- ~

EP-294 5 Dose Assessment Team Phone List 02/04/85 EP-301 1 Operating the Evacuation

. Alarm and River Warning -

System 12/12/84 l

.EP-303 3 Local Evacuation 12/12/84 EP-304 3 Partial Plant Evacuation 12/12/84 EP-305 4 Site Evacuation 02/11/85 EP-306 1 Evacuation of the.

Information Center 12/12/84 EP-307 2 Reception and Orientation of Support Personnel 12/12/84 EP-312 3 Radioactive Liquid Release 02/25/85 EP-313 2 Distribution of Thyroid Blocking Tablets 12/12/84 EP-314 0 Emergency Radiation Exposure Guidelines and Controls 12/06/84 EP-315 4 Calculation of Offsite Doses During a (Potential)

. Radiological Emergency

! Using RMMS in the

! Manual Mode 03/12/85 L EP-316 2 Cumulative Population

and Near Real-Time

! Emergency Dose l Calculations for L Airborne Releases Manual Method 12/13/84 EP-317 2 Determination of Protective Action

[ Recommendations 12/12/84 EP-318 1 Liquid Release Dose

^

Calculations Method for Drinking Water 12/12/84

. . . . _ . . - -  ;.,__,,,,.. .s._ __... _.._ ____..~ ~- . . . . . . . . .

_ _ , _ _____._,_..._._..,......_____.._..,.,_.___...,.,__...__,____1 _ _ _ _ . , _ ..,,_,__.._;._,.

, . . . . ... c..  ; ,m. - .2. m 4 W

~

, Page 5 of 5 L

.y Revision 31 03/12/85 i .

LIMERICK GENERATING STATION

'MERGENCY PLAN PROCEDURE INDEX f

PROCEDURE- REV. DATE SIGNED DATE OF LAST NUMBER NO. TITLE BY SUPER. PERIODIC REVIEW l EP-319 1 Fish Ingestion Pathway Dose Calculation 12/12/84


EP-325 3- Use et Containment Dose Rates to Estimate Release Source Term 02/27/85 EP-330 3 Emergency Response Facility Habitability 12/12/84

{ EP-401 2 Entry for Emergency Repair and Operations 12/12/84 EP-410 2 Recovery Phase Implementation 12/12/84 EP-500 2 Review and Revision of Emergency Plan 12/12/84 i

i e

l i

e 1

eme* * * *D'*e 4 *De-e ee *e e eg4P9'* *96 e'*S**** *  %.4*"*F ' * ' **8*' * *F * ' * * * * * * * * * * - *'

. - . .-. . .-. . . - - ,... . - ,-- .- -- .- - . = - - . , .,. . . . . , - , - _ _ _ . - _ - - - - . . - - . . . -

. . . - . . ;----....~, . : <. . . = ~ . ~

  • l- '

EP-103, Rev. 8 Page 1 of 13 3 .

3852069610 VAwnLP/rgs PHILADELPHIA ELECTRIC COMPANY LIMERICK GENERATING STATION ff EMERGENCY PLAN IMPLEMENTING PROCEDURE EP-103 ALERT RESPONSE 1.0 PARTICIPANTS j 1.1 Shift Superintendent or designated alternate shall assume the role of Emergency Director and implement I this procedure, until relieved. .

{.

1.2 Station Superintendent or designated alternate shall report to the Technical Support Center or Control f Room, relieve the Emergency Director, assume the role

{ of Emergency Director and continue implementing this procedure, if necessary.

}

2.0 ACTIONS-IMMEDIATE j 2.1 Emercency Director shall:

l I t 2.1.1 Verify the Emergency Classification as determined in EP-101, Classification of Emergencies, unless

determination has just been made.

2.1.2 Fill out Appendix EP-103-1 Alert Notification Message and give it to the communicator.

2.1.3 Direct the communicator to complete notification of

, the appropriate parties as specified in Appendix EP-t 44Q3-3, Alert Phone List (Initial Notification) or Y p'endix EP-103-4, Alert Phone List (Escalation or

.De-escalation) within 15 minutes.

THE COMMUNICATOR SHALL MAN THE NRC RED TELEPHONE ON A i

% .M.- CONTINUOUS BASIS UNTIL THE NRC DISCONNECTS. IF THE l

' ' 'p 6 ~

COMMUNICATOR IS REQUIRED FOR URGENT PLANT OPERATIONS RELATED(CO/,THE EMERGENCY, THE CICURRENCE FOR

[ b ,I ECU8 NGSTHE PHONE SHOULD BE OBTAINED FROM THE NRC 9 P%ORyTOSECURINGTHISTELEPHONE. gf W1.pho ' tact the Station Superintendent ana3erigSsh y echnical Advisor, inform them q. iis it i g

Q

\*,-  %. gy. '

  • ' t.

t <.

~f c '

, s W g

Y-

. h 9c ip t( 11

l 1

[ .' ,

EP-103, Rev. 8 l Page 2 of 13  !

VAN /JLP/rgs l i

I 2.1.5 Direct the Information Center Staff -

to implement EP-306, Evacuation of T Information Center. Inform the Staff of the wind direction if' there is an airborne release.

2.1.6 If there is a radiological release, implement EP-305, l Site Evacuation. i 2.1.7 If there has not been a radiological release, I

A. Evacuate all construction eso nel by contacting Bechtel Safet -Direct them to call for a " Total Proje t Ev cuation" in accordanr:o with Bechtel procedures. Inform . l them of nature of hazard.

B. Cont Construction Security Off-Hour and inform them that a Total Project Evacuation of Bechtel Construction l

personnel is being i nted, also inform Operations Security f the evacuation.

THIS WILL CALL FOR THE ASSEMBLY OF PERSONNEL AT l THE UPPER PARKING LOT. IF IT IS DESIRED THAT l THEY LEAVE THE SITE, INFORM BECHTEL COMMAND POSTS AT THE UPPER PARKING LOT.

l C. Select the type of accountability desired for personnel in the protected area and implement the required actions below:

Ett 1. Emergency Assembly Without Accountability gr .

, , -Make the following announcement ed' ' .

"THIS (IS)(IS NOT) A DRILL. DESIGNATED j EMERGENCY PERSONNEL REPORT TO ASSIGNED l LOCs' EMERGENCY RESPONSE FACILITIES OR ASSEMBLY 1 t

AREA. ALL OTHER PERSONNEL STAND BY FOR t

@3, * '

FURTHER ANNOUNCEMENT. THIS (IS) (IS NOT) i A DRILL."

e (7

J. , J ' 2. Emergency Assembly With Accountability e

" ""'. A. Contact the Security Team Leader.

,, e .:n Inform him of the selected exist i.v .. point (s), that emergency assembly

~

with accountability is going to be

.. implemented, and to activate the L 'E C Security Team (EP-208) and to perform personnel accountability in accordance with EP-110, Personnel j

Assembly and Accountability.

l

o  ! .' EP-l'3, 0 Rsv. 8 Page 3 of 13 VAX/JLP/rgs B. ontact Yoh Construction Security

'and inform them that personn aving Unit I will be reassembling at the Personnel Processing Center (PPC).

"THIS (IS)(IS NOT) A DRILL, THIS (IS)(IS NOT) A DRILL. DESIGNATED EMERGENCY PERSONNEL REPORT TO ASSIGNED EMERGENCY RESPONSE FACILITIES OR ASSEMBLY AREA. ALL OTHER UNIT ONE PERSONNEL LEAVE THE PROTECTED AREA IMMEDIATELY AND REASSEMBLE AT THE PERSONNEL PROCESSING CENTER. THIS (IS) (IS NOT) A DRILL. THIS (IS) (IS NOT) A DRILL."

2.1.8 For off-hours, direct the Shift Clerk tc activiate the call list using EP-291, Staffing Augmentation.

. If Shift Clerk is not available, this function shall be assigned to any available individual. l 2.1.9 Direct the activation of the Technical Support Center in accordance with EP-201, Technical Support Center

, (TSC) Activation.

i 2.1.10 If necessary, activate the Emergency Operations Facility in accordance with EP-203, Emergency Operations Facility (EOF) Activation.

2.1.11 Assign an Operations Support Center Coordinator (PO) to direct available personnel to report to the Operations Support Center on 269' Elev. Turbine Bldg.

and to activate it in accordance with EP-202, Operations Support Center (OSC) Activation.

2.1.12 For samoles, direct the Shift Chemistry Technician or Chemistry Sampling and Analysis Team Leader to implement EP-230, Chemistry Sampling and Analysis Team.

2.1.13 For in-plant surveys, direct a Shift HP Technician or Personnel Safety Team Leader to implement EP-250, Personnel Safety Team.

2.1.14 For field survevs, when a release of gaseous radioactive material has occurred or is suspected, direct the Dose Assessment Team Leader to implement EP-210, Dose Assessment Team.

.: kh

!f 9 4 } : ~- )y -

a. rA -

i 't >

s Bas s i

mm

.. :_. :. - .. .. a=a: .=. w - . : ~

.'- h%&. ::. n . . : r .

l"

~ EP-103, Rev. 8 Paga 4 of 13 VAW/JLP/rgs

. 2.1.15 For a release at or greater than the Alert level in

>-s EP-101, Classification of Emergencies, direct the

[ Dose Assesment Team Leader to implement EP-210, Dose Assessment Team.

2.1.16 On an interim bases, direct the Shift Technical Advisor to perform dose projections using EP-316, Cumulative Population Dose Calculations For Airborne Releases - Manual Method or EP-315 Calculations of Offsite Doses during a radiological Emergency using RMMS in the manual mode and to suggest Protective Action Recommendations per EP-317.

-} 2.1.17 For fire / damage repair direct the Maintenance Shift -

Assistant Foreman or Fire and Damage Team Leader to implement EP-260, Fire and Damage Team and/or EP-261, Damage Repair Group.

2.1.18 For a liquid release, implement EP-312 Radioactive l Liquid Release, if required.

2.1.19 For Security matters, contact Security Shift l Supervision and direct implementation of EP-208, l

Security Team unless previously done, f

b' 3.0 ACTIONS-FOLLOW-UP i

( 3.1 Emergency Director shall:

i

(

r 3.1.1 Verify that the Technical Support Center, the Emergency Operations Facility (if necessary) and the Operations Support Center have been activated.

3.1.2 Periodically evaluate the event classification in accordance with EP-101, Classification of Emergencies and maintain, escalate or de-escalate the l classification, as necessaey.

l 3.1.3 If classification is de-escalated, fill out Appendix-I EP-103-2, Alert De-Escalation Notification Message j and give it to the communicator and direct the

communicator to perform not,ification of the i appropriate parties listed in Appendix EP-103-4, l

I Alert Phone List (Escalation or De-escalation).

3 .1 ~. 4 Obtain the following information as necessary to

[ formulate further actions:

5 m - .w

. . . . .. . ... . c.....x w.c. . :.; .. . . w .a.w.w.m Lu,w =.a..

\" EP-103, RGv. 8 r Page 5 of 13 VAW/JLP/rgs t..

[ A. Security status from Security Team Leader

[

4 B. Sample analysis from Shift Chemistry Technician or Chemistry Sampling and Analysis Team Leader C. In plant surveys from Shift HP Technician or Personnel Safety Team Leader

!p

[ D. Field surveys from Dose Assessment Team Leader E. Dose projections and protective action l recommendations from Shift Technical Advisor or I

Dose Assessment Team Leader I F. Fire / damage repair status from the Maintenance Shift Assistant Foreman or Fire and Damage Team Leader G. Notification results from Communicator 3.1.5 Determine which additional support personnel are necessary for emergency functions and direct the Shift Clerk or other assigned communicator in TSC to contact those personnel.

3.1.6 Provide site personnel with public address (PA) announcements for any major changes in plant emergency status, such as changing emergency action levels and evacuations.

3.1.7 Evaluate the need and order evacuation of effected i areas as necessary. Refer to the following procedures: ' EP-303 Local Evacuation, EP-304 Part'ial l Plant Evacuation, EP-305 Site Evacuation.

l-3.2 The Communicator shall:

i 3.2.1 Inform Emergency Director when appropriate Notifications have been made and submit completed copy of Appendix EP-103-3 Alert Phone List (Initial i Notification) or Appendix EP-103-4 Alert Phone List t

(Escalation or De-Escalation) for Emergency

Director's Signature.

8 i

! 4.0 APPENDICES 4

) 4.1 EP-101-1 Alert Notification Message ,

4.2 EP-103-2 Alert De-Escalation Notification Message 4.3 EP-103-3 Alert Phone List (Initial Notification)

. _ . . ~ . . . _ . - . . . . . . ... ... .. .. .. . .

~ -

. . . . . - . ....a . . e.:.-a -. . . , . :.a. ;u= :.;uagr..;& n:;. ... ,'

' l" EP-103, Rav. 8 Page 6 of 13 VAW/JLP/rgs 4.4 EP-103-4 Alert Phone List (Escalation or De-escalation) 5.0 SUPPORTING INFORMATION 5.1 Purpose l The purpose of this procedure is to provide I

guidelines for site response to an Alert.

5.2 Criteria For Use 5.2.1 This procedure shall be implemented when an, event has been classified as an Alert per EP-101, Classification of Emergencies, and EP-101 has been completed.

5.3 Special Equipment None I

j 5.4 References 5.4.1 Limerick Generating Station Emergency Plan 5.4.2 NUREG 0654, Criteria for Preparation and

{L Rev. 1 Evaluation of Radiological' i

Emergency Response Plans and Prepardness in Support of

[ ] Nuclear Power Plants.

l 5.4.3 EP-303 Local Evacuation 5.4.4 EP-101 Classification of Emergencies

, 5.4.5 EP-304 Partial Plant Evacuation 5.4.6 EP-305 Site Evacuation ,

5.4.7 EP-306 Evacuation of the Information Center 5.4.8 EP-291 Staffing Augmentation 5.4.9 EP-201 Technical Support Center (TSC) Activiation 5.4.10 EP-202 Operations Support Center (OSC) Activation 5.4.11 EP-203 Emergency Operations Facility (EOF)

Activation

- . pm -t r m. -a e -

sa y,

, .,,, . . . 2_, ,, ..,;, , ,,

EP-103, Rev. 8

Page 7 of 13

[

VAW/JLP/rgs t

5.4.12- EP-317 Determination of Protective Action Recommendations 5.4.13 EP-316 Cumulative Population Dose Calculations l for Airborne Releases- Manual Method 5.4.14 EP-110 Personnel Assembly and Accountability q 5.4.15 EP-208 Security Team 4

5.4.16 EP-210 Dose Assessment Team 5.4.17 EP-230 Chemistry Sampling and Analysis Team

. 5.4.18 EP-250 Personnel Safety Team

t. 5.4.19 EP-260 Fire and Damage Team t

i j 5.4.20 EP-261 Damage Repair Group 5.4.21 EP-312 Radioactive Liquid Release 5.4.22 EP-315 Calculations of offsite doses during a Radiological Emergency using RMMS in the manual mode i

5 1

l I

l h

r t

t-6:

?

I 1

l I

I l

l

. . . . . ~ . . . . . . . . .

.s -

{~~

"1;Tii . ' C . ..? 5.

. ._ r_. . ..._..- . _ . . _ . - . _ .

[

fl p

EP-103, Rev. 8 Page 8 of 13 VAW/JLP/rgs l

1 APPENDIX EP-103-1 ALERT NOTIFICATION MESSAGE i

g MESSAGE: This *(is) (is not)* a drill. This *(is) (is not)* a 3

drill. This is Limerick Generating Station calling to report an Alert.

My name is , telephone . Limerick Generating -

4 l:

l Station is reporting an Alert declared at Unit No. . Time and date I

) of Alert classification are . , . The basic

! (24 hr. clock time) (date)

}

j problem is .

There *(has been) (has not been)*

l J

k an *(airborne) (liquid)* radioactive release from the plant. The plant

k. '

t status is *(stable)(improving)(degrading)(not known)*. There is no l

1 3 protective action recommended. This *(is) (is not)* a drill. This *(is) f:f I

(is not)* a drill.

I, i

i 1

I L , ,-, , . , . _ _ , . . . _ . .

[  ;

- APPENDIX EP-103-2

] ,

, ALERT DE-ESCALATION NOTIFICATION MESSAGE 4*

l 9-MESSAGE: *This (is) (is not)* a drill. This *(is) (is not)* a drill.

/e This is Limerick Generating Station calling to report a change in t cmergency classification. The Alert has been *(de-escalated to an 1

Unusual Event) (Terminated)*.

l.

Time and date are , .

1 -

i

[

(24 Er Clock Time) (Date) b L r.

L The plant status is *(stable) (improving)*. My name is .

e This *(is) (is not)* a drill. This *(is) (is not)* a drill.

H 1e i

esau.m

, L.. . . . ,

. s l EP-103, Rev. 8 Page 10 of 13 VAW/JLP/rgs ,

lI APPEtIDIX EP-103-3 .

ALERT PIIOtIC LIST l!

Time Initiated (IIIITI AL !!OTIFICATIOt!) ,

CIRCLE Pilot!E

?!Ut1 DER USED .

Personnel / Agency To Be tiotified Phone !! umber Time Person Res ndin

a. Station Superintendent Ilome ,

G. M. Leitch Office J. F. Franz Ilome '

Office -- '

x" P. J. Duca llome '

Office .

b. Load Dispatcher Office W ,- t i ,' - - ,
c. Montgomery County Office of , <f.

Emer n P aredness 9 l d. Pennsylvania Umcrgency -

Man ment ene

e. Pennsylvania Bureau of (8am  :

Radiation Protection g, l Ila r r i sburg , PA W l 1

f.  !!anager - Public Information Ilome  :

Ronald Ilarper Office g

. .9 I

EP-103, nov. 8

[ Page 11 of 13 vat!/JLP/rgs , ,

APPEtIDIX EP-103-3 .

ALERT PilOrlE I.IST '

Time Initiated (IlllTIAL !!OTIFICATIO!!)

. l CIRCI.E PILO!!E p

Personne nc To Be tiotified flUf1BER USED Phono i nr

._] I.

i

g. Director - Emergency llome g Preparedness Office  !

~

Roberta Kankus '

Jerry Phillabaum Ilome ' . > ~-.

Office  ;

l Victoria liarren Ilome Office g f ,

h. NRC Operations Center: .

! Bethesda, !!D vf '

11ake this call last and remain on g 4 telephone until NRC disconnects ,

~'

i (Person contacting flRC must be '

Licensed rator - }' l Rgencies to be contacted after i

the above personnel / agencies have "

been notifed _ {

t y

i. Derks County Emergency i Plan nt A ene I

'j. Chester County Emergency -

. j Services Completed Dy: ime e

- r Verified Dy:

N E!!ERGEllCY DIRECTOR

_ . . . , . - . ...~.,,s , . . . . . . , .. - .->-....,,m .. ....s .. . . . - . . . , . , , . _ . . . . .

. . . . . , ___ . . . ...m 9

l EP-10.s, nov. 8 Page 12'of 13 VAN /JLP/rgs. ,

APPCilDIX CP-103-4 ALERT PIIOt1C LIST Time Initiated (ESCALATIOtl OR DC-ESCALATIOrl) d CIRCLE PitOflE '

. -. tJUt111ER USED

/ Pe r sonne l/ Agency To Be flot i f i ed Phone !!umbe r Time Person Responding I

t a. Station Superintendent liome G. H. Leitch Office l

J. F. Franz llome Office l P. J. Doca llome

  • l Offic
b. Load Dispatcher Office .

l c. Pennsylvania Dureau of Radiation Protection ^~

llarrisburg, PA I

d. IIRC Operations Center Bethesda, !!D Make this call last and remain on telephone until NRC disconnects (Person contacting 11RC must he

.icensed Operator)

~ u 2' **

, , - ,'.f'

" ' 8 C i '7

{ , ,._ ,

. v ,- ,

~ -

e f l EP-103, nev. 8 Page 13 of 13 VAU/JLP/rgn ,,

I APPE!! DIX EP-103-4  ;

'A T.E R T Pil O f3 E LIST Time Initiated (ESCALATIOtl OR DE-ESCALATIO!1)

CIRCLE PilOrlE

_ _ _ _ , nut 1BER USED Personnel / Agency To Be !!otified Phone !!umbe r Time Person Responding Agencies to be contacted after

  • the above personnel /agencien have been notifed -
e. Montgomery County Office ,

of Emer enc Pre aredness  ;

f. Berks County Emergency l.

Mana ment A enc _ ,

g. Chester County Emergency j Services ,

h Completed By: Time /Date Verified By: ';

i EMERGEllCY DIRECTOR i

s-4 l

. es . !a ,;, 6- N -

."3

-> - , h ;^

3 .,

y^,i' *p <.ii p--. P u;i y .,

, ' L- ~ t , '{ . 'i i 's 1*'.

s  ;

b k 9

O

i-do . . EP-104, Rev. 8

'852069620 Page 1 of VAW/JLP/rgs is

[ '

-f PHILADELPHIA ELECTRIC COMPANY LIMERICK GENERATING STATION y [J[

, EMERGENCY PLAN IMPLEMENTING PROCEDURE

)

EP-104 SITE EMERGENCY RESPONSE r

3 2.0 PARTICIPANTS 4

l 1.1 Shift Superintendent or designated alternate shall ,

assume the role of Emergency Director and implement this procedure, until relieved.

1.2 Station Superintendent or designated alternate shall j report to the Technical Support Center or Control

, Room, relieve the Emergency Director, assume the role i

of Emergency Director, and continue implementing the procedure, if necessary.

b 1.3 Site Emercency Coordinator shall report to the Emergency Operation Facility and implement the

, appropriate section of this procedure, if necessary, t

t 2.0 ACTIONS-IMMEDIATE

! 2.1 Emercency Director shall:

2.1.1 Verify the emergency classification as determined in l EP-101, Classification of Emergencies unless determination has just ceen made.

I 2.1.2 Fill out Appendix EP-104-1, Site Emergency Notification Message, and give it to the Communicator.

i

.h Direct the communicator to complete notification of the appropriate parties as specified in Appendix EP-p\ #. 104-3 ite Emergency Phone List (Initial

/

  • i k Not tion) or Appendix EP-104-4, Alert Phone List F

( Ytion or De-escalation) within 15 minutes.

%N t HF COMMUNICATOR SHALL MAN THE NRC RED TELEPHQ g $N[k

\  %, b

%[ CONTINUOUS BASIS d #> I

  • UNTIL

[.3' WTHE NR

%y U

,. Fh A:- -

' a T . A
...s , b y

~

q., .a

. r. a..

f . _ Y

.u e.:

  • p esul> M i

P EP-104, Rev. 8 Page 2 of 15 VAW/JLP'rgs 2.1.4 Contact the Station Superintendent and the Shift Technical Advisor, inform them of the situation, if not-already done.

/

2.1.5 Direct the Informaticn Center Staff o implement EP-306, Evacuacion Of :..e _a ormation Center, if not already done. Inform the staff cf the wind direction, if there is an airborne release.

2.1.6 If there is a radialegical release, implement EP-305, Site Evacuation.

2.1.7 If there has not been a radiclogical release, A. Evacuate all ce s* uction personnel oy contacting Secntel Safety ~ Direct them : call for a

" Total Project Evacuaticn" in accordance with Bechtel pr:cedures. Infor.7 them Of .ature Of ha:ard.

3. Contac~ Construction Securi:V ^

off-hours 'and inform them tha: a Total Project Evacuatica of Becntel Constructica personnel is being imclemented. Also inform Ocerations security g cf the evacuation'.

THIS WILL CALL FOR THE ASSEMBLY OF PERSONNEL AT THE UPPER PARKING LOT . IF IT IS DESIRED THAr THEY LEAVE THE SITE, INFORM SECHTEL COMMAND POSTS AT THE UPPER PARKING LOT.

C. Select the type of accountabili:y desired for personnel in the protected area and implemen: the required acticas celow:

. Imergency Assemoly Withou: Accountacili:7

- Make :he following anncuncemen:

"THIS (IS) (IS NOT) A DRILL. DESIGNATED EMERGENCY PERSONNEL REPORT TO ASSIGNED EMERGENCY RESPONSE FACILITIES OR ASSEMBLY AREA. ALL OTHER PERSONNEL STAND BY FOR FURTHER ANNOUNCEMENT. TNIS (IS) (IS NOT) A DRILL."

2. Emergency Assembly With Accountability
a. Contact the Security Team Leader.

Inform him of the selected point (J),

l w i , ,. , .31 O

account

< . .. 4 g),l Mthat emergency go s ,.

A ',

asspg' N*o ,1 <  % 9 -} Q  ; , , ,

l

'g 9' ', ,

1

.f.

  • y

.. )

L. . ', 's ee - ~, J

, yu ,,.

  • r , . $nd '

s

r2 4 Pago 3 Of 15 VAW,'JLP/rgs implemen:ed, and :o activate the Security Team (EP-208) and to perform personnel accountability in accordance with EP-110, Personnel Assembly and.

Accountability

b. neac: Yeh Construction Security and inf:r.5 : hem

. at personnel leavi.., Uni . will be reassemoling a: :ne Personnel Processing Center (PPC)

"THIS (:S) (IS NOT) A DRIL~, TH:S (IS)

(IS NOT) A DRILL. DESIGNATED EMERGENCY PERSONNEL REPORT TO ASSIGNED EMERGENCY RESPONSE FACILIEIES OR ASSEMBLY AREA. -

ALL OTHER UNIT ONE PERSONNEL LEAVE THE

??.OTECTED AREA MMED:ATELY AND REASSEMBLE AT THE PERSONNEL PROCESSING CENTER. THIS (:S) (:S NCT) A ; RILL.

THIS (IS) ( S NOT) A DRILL.

2.1.8 For off hours, if not already accomplished at the Alert stage, direct :he Shirt Clerk to activate the call list per EP-291, Staffing Augmentation. If Shif: Clerk is not available, this func: ion .ay be assigned to any available individual.

2.1.9 Direct tne activation of the Tecnnical Support Center in accordance with EP-201, Technical Suppor: Center (TSC) Activation, if not already activated.

2.1.10 Direct the activation of :he Emergency Opera ions Facility in accordance with EP-203, Emercency Operations Tacility (EOF) Activatien, if not already ac ivated. 4p

.tts.7%

2.1.11 If the EOF nas not been activated earl-i,y, M r$ g the Alert Rescense crocedure, direct a communi 2:or to call EOF personnel (directing them to Ee'ho(rtyg' o tne -

EOF) using EP-279, EOF Group Phone LED v4.; ( g.'3;D -

2.1.12 Assign an Operations Support Cent & coo"$dfN2:or (PO) if not already done, to direct av EDaq report to the Cperations Suppor-jCenth,le'$m:sonnel esand to to activate it in'accordance with EPh192, Cherations Support Center (OSC) Act iva tion,.g,,, 4 2.1.13 For samoles, direct theShi5.hCPie ry Technician or Chemistry Sampling And Analg(EsjfWAp Leader to ~

implement EP-230, Chemistg.i "

gm -

g And Analysis Team. 43 (/

(? m J

)

y. g*

, . N4v

_ 1 t .

a

., >. .. ..- . ...a.. . -

. . .. ~~+w.u.- D.u aw :

y Jl . , EP-104, Rev. 8 Page 4 of 15 g

VAW/JLP/rgs e s i 2.1.14 For in-plant survevs, direct a Shift HP Technician or a

Personnei Safety Team Leader to implement EP-250, Personnel Safety Team . -

+

2.1.15 For field surveys, when a release of gaseous radicactive material has occurred or is suspected, direct a Shift EP Technician or Dose Assessment Team Leader to implement EP-210, Dose Assessment Team .

3 2.1.16 For a' release, at or greater than.the Alert level in~

e EP-101, Classification of Emergencies, er at the l discretion of the Emergency Director, direct the D0se 1

Assessment Team Leader to implement EP-210, Dose Assessment Team.

l 2.1.17 On an interim basis, direct the Shift Technical i Advisor to perform dose projections using EP-316, i.l Cumulative Population Dese Calculations for Airborne Releases-Manual Method or EP-315 Calculations of Offsite Doses during a Radiological. Emergency using RMMS in the Manual Mode and to suggest Protection Action Recommendations per EP-317.

2.1.18 For fire / damage repair direct the Maintenance Shift Assistant Foreman or Fire and Damage Team Leader to

, implement EP-260, Fire and Damage Team and/or EP-251, Damage Repair Group.

2.1.19 For a liquid release, implement EP-312,.Radicactive Liquid Release, if required.

2.1.20 For Security matters, contact Security Shift Supervision and direct implementation of EP - 208 ,

Security Team, unless previcusly done.

i 3.0 ACTIONS-FOLLOW-UP 3.1 Emercency Director shall:

t

! 3.1.1 Verify that the Technical Support Center, Emergency Operations Facility and the Operations Support Center have been activated.

Y 3.1.2 Periodically evaluate the event classification in L

i accordance with EP-101, Classification of Emergencies and escalate or de-escalate the classification, as necessary. .

e M

6'

_n6_-m'- gh y w -wnv 'w' yw v"= W 4 .e *'-**9 e--wb7-'- *t' 1 b rPT *-sr y*-

. =. . <.w..... > . . .a.a. u uar:au w u.

, EP-104, Rav. 8

. Paga 5 of 15 VAW/JLP/rgs 2.1.3 If classification is de-escalated, fill out Appendix EP-104-2, Site Emergency De-Escalation Notification Message and give it to the communicator and direcf

' the communicator to cerform notification of the appropriate parties listed in Appendix EP-104-4, Site

, Emergency Phone List (Escalation or De-escalation).

3.1.4 Obtain the following information as necessary to formulate further actions:

A.- Security Status from Security Team Leader'

3. Sample analysis from Shift Chemistry Technician
or Chemistry Sampling And Analysis Team Leader .

l C. In plant surveys from Shift HP Technician or i

Personnel Safety Team Leader D. Field surveys from Shift EP Technician or Dose Assessment Team Leader E. Dose projections and protective action recommendations from Shift Technical Advisor or Dose Assessment Team Leader i

F. Fire / Damage repair status from the Maintenance

! g Shift Assistant Foreman or Fire and Damage Team l

b Leader.

G. Notif'ication Results from Communicator.

3.1.5 Discuss protective action reccmmendations with the Site Emerg,ency Coordinator.

! 3.1.6 Determine which additional succort personnel are necessary for emergency functions and direct the shift clerk or other assigned communicator to contact, i those personnel.

3.1.7 Provide site personnel with public addres (PA) announcements for any major changes in plant

, emergency status, such as changing emergency action levels and evacuations.

i 3.1.8 Evaluate the need and order evacuation of affected

areas as necessary.
Refer to the following procedures

3 EP-303 Local Evacuation EP-304 Partial Plant Evacuation t-e

  • m>M

~' ' " -' '

, , _ . , - 1;'{ ' f

.. . w. ~:. s . . : .a ....- a. ww afdWs m Ms= . . -

i j -* , 'e EP-104, Rev. S 3 , , Page 6 of 15

- l VAW/JLP/rgs l L .

l t

. P-305 Site Evacuation l 1

3.1.9 Perform the following until relieved by the Site h Emergency Coordinator:

] A. Discuss protective action reccmmendations with j'

the Dose Assessment Team Leader.

l B. Provide protective action reccmmendations, if necessary, to the Pennsylvania Bureau of ,

i Radiation Protecticn.

! C. Inform the varicus emergency response groups id j the recovery phase organization is to be 4

implemented. .

3.2 The Communicator shall:

3.2.1 Inform the Emergency Director when appropriate notifications have been made and submit ccmpleted copy of Appendix EP-104-3 Site Emergency Phone List (Initial Notification) or Appendix EP-104-4, Site Emergency Phone List (Escalation or De-escalation) l for Emergency Directors Signature.

r

'4.0 APPENDICES l

4.1 EP-104-1 Site Emergency Notification Message 4.2 EP-104-2 Site Emergency De-Escalation Notification Message

{

, 4.3 EP-104-3 Site Emergency Phene *ist

. (Initial j Nctification) 4.4 EP-104-4 Site Emergency Phene List (Escalatien er De-escalation) l -

5.0 SUPPORTING ~INFORMATh0N 5.1 Purpose The purpose of this procedure is to provide guidelines for the site response to a Site Emergency.

lt' s

I m

6

- , . ~ . . ...,.,..,-,,-y -- - -

.. , . , m t.

- .I.' EP-104, Rsv. 8 Page 7 of 15

+~

VAW/JLP/rgs 5.2 Criteria For Use s

J 5.2.1 This procedure shall be implemented when'an event'has been classified as a Site Emergency per EP-101, Classification of Emergency and EP-101 has been I completed.

)

. 5.3 Special Ecuipment

) None

)

5.4 References 5.4.1 Limerick Generating Station Emergency Plan ,

5.4.2 NUREG 0654, Criteria For Preparation and Rev. 1 Evaluation of Radiological Emergency r

Response Plans and Preparedness in Support of Nuclear Power Plants.

v 5.4.3 EP-101 Classification of Emergencies i

5.4.4 EP-291 Staffing Augmentation 5.4.5 EP-201 Technical Support Center (TSC) Activation i 5.4.6 EP-202 Operations Support Center (OSC) Activation 5.4.7 EP-203 Emergency Operations Facility (EOF) Activation 5.4.8 EP-317 Determination of Protective Action i

Recommendations l 5.4.9 EP-316 Cumulative Population Dose Calculations For Airborne Releases-Manual Method 5.4.10 EP-303 Local Evacuation 1 5.4.11 EP-304 Partial Plant Evacuation 5.4.12 EP-305 Site Evacuation 5.4.13 EP-306 Evacuation of the Information Center 5.4.14 EP-110 Personnel Assembly and Acccuntability 5.4.15 EP-208 Security Team 5.4.16 EP-210 Dose Assessment Team .

5.4.17 EP-230 Chemistry Sampling and Analysis Team P

w ..

4

_ . . . . . , ~ , -- -

e' ~ - -- , , - , - - -

, . . n .t. .u... n EP-104, hav. B Pcge 8 of 15 VAW/ JI P/rgs 5.4.18 EP-250 Personnel Safety Team 5.4.19 EP-260 Fire and Damage Team

[ 5.4.20 EP-261 Damage Repair Group i

5.4.21 EP-312 Radioactive Liquid Release 5.4.22 EP-279 Emergency Operations Facility (EOF) Group Phone List 5.4.23 EP-315 Calculations of Offsite Ocses During a Radiological Emergency using RMMS in the Manual Mode e

b i

6 P

i t

i I

?

i i

E I.

4 I

t r r 7:- ':^~-

  • t,s , ,. p.

,7,~, ..; ~ *.__

", m , 7 . , _. -

. - . - + _ _ _ _ , _ _ , _ , , . . _ . . . _,

p .. ~ _

EP-104, Rsv. 8 Paga 9-of 15 VAW/JLP/rgs

( APPENDIX EP-104-1 SITE EMERGENCY NOTIFICATION MESSAGE Messace: This *(is)(is not) a drill. This (is)(is not)* a drill.

This is Limerick Generating Statica calling to report a Site

, Emergency. My name is , telephone .

Limerick Generating Station is reporting a Site Emergency declared at Unit No. .

f Time and date of Site Emergency classification are ,

(24 hr. clock time)

'n t.

c (Date) c The basic problem is .

h There *(has been) (has not been)* an *(airborne) (liquid)* radioactive 4

t t

elease frem the clant. The plant status is *(stable) (improving) 0 (degrading) (not known).* There is no prctective action reccmmended.

{ This *(is) (is not)* a drill. This *(is) (is not)* a drill.

[

i l

i L

4 e

l .

t

.....-7,,- .

EP-104, Rav. 8 Page 10 cf 15 j

VAW/JLP/rgs a-APPENDIX EP-104-2 SITE EMERGENCY DE-ESCALATION NOTIFICATION MESSAGE MESSAGE: This *(is) (is not)* a drill. This *(is) (is not)* a drill. This is Limerick Generating Station calling to report a change in emergency action level. The site emergency has been *(de-escalated to an) (Unusual Event) (Alert) (Terminated).* Time and date are

, . The plant status is *(stable)

(24 Hr. Clock Time) (Date)

(improving).* My name is .

This *(is) (is not)* a drill.

This *(is) (is not)* a drill.

4 i

l G

e

..k. - =& w

l l 1:P-101, P[ v .. 'I Page 11 nf l 'i VA!!/.1l.P/r<j n " '

APPCr!DTX UP-101-3 S TTl; P!!P.HCPflrY Pi!O!!!' I.IS':'

( IilTTI AT. !!O"'ll'I r'A'"IO!!)

i ne InitiateO 17 Circle Phone ilumber Ured "' n Pernonnel/ Agency to be noti fic<' Phone r:nnhe r Time Person Renpon 'ing

a. Station Superintendent '

G. !!. T,oitch j

'W L- 1 N '

J. F. Franz P. .l . Duca 1

5. I.oa;' Di npa tche r W .:. roc4
c.  !!nntgomery county Of fice or nrergency Preparcenens "N

/3 ,

. l

d. Penn ny lva n i a Emergency

~

l bI

'a nageme n t Agency _

7 1 C W rH dvania Dureati of -

s.

Ra 'j a t ion Prctec tion,

!!a r r i nh o rg , PA ,,

.. j I,

~

f. rianager - I'u h l i c Information d '

con a l el liarp<tr F 45-f I

k -

(

_ ~  ;

! . , i

. _ _ _ _ . . _ . _ _ . . . _ _ . _ . _ . ~ _ _._ _ . _ _ .._ ___. _ _ _ _ _ _ _ _ _ _ _ . _ . _ . _ . _ _ _ _ . _ _ _ _ . . _ . _ _ _ _ __

m- - - . _ . _ . _ _ _

o l I:P-101, Pov, ft ,

Page l < > r l '*

VA1.'/.II.I'/ r g r APPI:t:III X 1:P-101-1 ( rottr ' i >)

S I'"C Ef!Ei!GI:tirY Pl!Olin f.!!;T (CO!!T ' t))

( It!IT I AT. f!OT T !'I PATIOt:)

,~

-l - Circle Phone l'u mli.' r lined Pernonnel/ Agency to be noti fied Phone flumber Time Percon no n pon.' i n g

g. Di rec tor - Umcrgency Preparednern Ro'ic t ta I:an!:us

\j t

~

Jerry Phillabaum

f.  %, ..

E y '?

Victor ia 1.'a r ren 2, -

. k .,

h. I:CC Operationn renter r J ' ..

Dethenda, fiD ',.,e '

l f:a!:e thin call last anil f 's W

.2 remain on telephone until finr dinconnect.n , _ s ..y (Pernon contacting tinc reunt be licenned operator) b

= 13,

\\\ L Agencien to be contacted af'ter t l'c above pernnnnel/agencien f have been notifiert

i. Der':n roun ty Emergency

!!a nagemen t Agency f

. e

b 6L ' .* p

. ** T C

  • . u .

>bN '_*

'. C L C

% a C t' "; C.

--N

  • G

- 4 C C C< C

- Ci >

1 C C C. O C

'4 L:

u O

C.

C C

C N

C C C G E- F-

[ w.

P' l

    • I i.

^~

~C \

Cn c.- - Z -

C C C C ,I. .:. a e ..

'G u en - G 1 - - _.

v C w. C C C E- e O

"I .7M -

C. Cu f; 3 4 CC L< C .' s M T. * .:': G

  • a~ fC .: '

CC- C 3 M

C%*4 o Cf m LCw

-c CC /'* .

0C 6 C

< ** .~ a LC -

  • =
  • L' y t: .

% .;*m e.

c . . ,

O M

== C ll w  ;, o -c ,

- O 6

  • u C ~

D*

C o C , , .

C C'

>, -Q u

l';Sh p C C U ~,,f

.:. E C -% ,

C C -

C D a 3, u ,g u o

2. C & ,,

C G C C L A*I' X,.

o U ** 'h

  • O C lN a

. ,,g.y

< uC C 0, .

N C O C m u. q --

0 0 > C '". 7'. .

C C 6 M C C

c A O t t-C k

c C. -~ s u E 6 0

  • C O c r, L  :>

l

k -

1 j . -

l 1:P- 10 4 , Pov..H i

Paqo 11 o'v l 'i' ,

vat ?/.11.P/r ';r * * '

APPI
linIX CP-101-4 i

SITC P.f!CUCT'llCY Piloill: I.IST T i rt.e in i t ia t eel 1 ,

l Pircle Phone fiumher IInetl Perronne]/ Agency to be notified Phone llumber "' iron Percon Penpon<!i ?!  ;

l

, n. Stat ion Stinerintendent  ;

} C. *!. I.citch J. P. Fr an::

I

! P. J. Duca I M icpatcher I

I c. Pennnyl v. n ia Dureau of F '

l Radiation Protection ,

I!arrinburg, PA 'k c

I  :' . !100 Operationn Center  ;

ne the r la , !!D -

r *al:e tl'in call lant and -

remain on telephone until -[,

!TP <l i n con ne c t.. .

(Perron con tacting ?!RC ' *' "

munt he ]icenned operator) '

l CP-104, i:. v . *1 Page 1 ". o f l'/

'!A!!/.11.P/r <j r APPCT! DIX I:P-101- 1 ( rO:!T ' I .)

S TTI' I:f1R!!CI:t!PY Pilotin I IS'i' ( CO!!T ' I))

(!: SCAT.ATIOrl 01: DI -1:SPAI.A':*10ll) l Circle Phone !!nmher IJne:1 I, Pernonnel/ Agency to be noti fierl Phone ?! umber Tirte Pornon Renponding Agencien to be contacted after the above pernonnel/agencien g I: ave been no t- i f 1 ed ]

y t N. ,1 J e. t'ontgomery rounty Of fice of j l Omergency Prepace Iness i Berl:n County Emergency

] f.

i

!!anagemen t Agency k

\ a 9 Cl: enter County Cmcrgency '

Services ,, -

V i -

p _- - j

, )

' .c Q..

Completed P.y:  ;:.'

Time / t Verifie? !!? : e -J -r ?-

_ Emergency Director 4 l ,p h

' ,,e 4 -.

j i

i

,1 g

i

. ._- -. , ..  :.....o.:. _ . . 1 e . ..

EP-105, Rev. 8 3852069640 Page 1 of 14

  • VAW/JLP/kml i

l PHILADELPHIA ELECTRIC COMPANY LIMERICK GENERATING STATION

/ JI/~/ / dI EMERGENCY PLAN IMPLEMENTING PROCEDURE )

, 1 l

, i EP-105 GENERAL EMERGENCY RESPONSE i i

r 1.0 PARTICIPANTS

, 1.1 Shift Sumerintendent or designated alternate t-shall assume the rofe of Emergency Director and implement this procedure until relieved.

1.2 Station Suoerintendent or designated alternate shall report to the Technical Support Center or Control Room, relieve the Emergency Director, assume the role of Emergency Director, and continue implementing the procedure, if necessary.

1.3 Site Emergency Coordinator shall report to the t Emergency Operations Facility and perform the l ( appropriate section of this procedure, if necessary.

l i 2.0 ACTIONS - IMMEDIATE 2.1 Emergency Director shall: 4D~

l

.g g 2.1.1 Verify the emergency classification /ds ,

determined in EP-101, Classification"o  %%p Emergencies unless determination hih ' been made. e,

2. .'& .Y.

Fill out Appendix EP-105-1, G,aner QQ.

Em gency 4 Notification Message, and give.,ip tb he

- communicator. e. ..

l

, 4

.g Dire $ communicator to completd

[hi Ytification of

' s, 2

the(appropriate parties as':.N ed in Appendix

/'

+

EP-lM-3, General Emergenc List (Initial jsotification) or Appendtx'y Eh -4, General

./ -

4 Y' Emergency Phone Listgj s' a tion or De-

. g escalation)withinqQ l .

Y,',

f) 9e .

l

EP-105, Rev. 8 Page 2 of 14

,, VAW/JLP/kml THE COMMUNICATOR SHALL MAN THE NRC RED TELEPHONE ON A CONTINUOUS BASIS UNTIL THE NRC DISCONNECTS.-

2.1.4 Contact the Station Superintendent and the Shift Technical Advisor, inform them of the situation,

, if not already done.

2.1.5 Direct the Info Center Staff -

implement EP-306, Evacuation M the Intormation Center, if not already done. Inform the staff of the wind direction, if there is an airborne release.

2.1.6 If there is a radiological release, implement '

EP-305, Site Evacuation.

2.1.7 If there has not been a radiological release, A. Evacuate all construction ersonnel by contacting Bechtel Safety Direct them to call for a " Total roject Evacuation" in accordance with Sechtel procedures. Inform them of nature and preferred evacuation direction.

B. Contact Yoh Construction Securit Off-Hours and inform them that a Total

. Project Evacuawion of Bechtel Construction personnel is being implemented. so contact Operations Security nd tell s , them of the construction eva uat' n.

. s, THIS WILL CALL FOR THE ASSEMBLY OF PERSONNEL t.[, <fm AT THE UPPER PARKING LOT. IF IT IS DESIRED THAT THEY LEAVE THE SITE, INFORM BECHTEL COMMAND POSTS AT THE UPPER PARKING LOT.

r J.

D C. Select the type of accountability desired 1

,n *,. for personnel in the protected area and W"" ,, implement the required actions below:

.f J 1. Emergency Assembly Without (e g'~ Accountability t3' f.# ,

- Make the following announcement "THIS (IS) (IS NOT) A DRILL. DESIGNATED (I'<'r u * ... EMERGENCY PERSONNEL REPORT TO ASSIGNED

"., EMERGENCY RESPONSE FACILITIES OR p v' ASSEMBLY AREA. ALL OTHER PERSONNEL 4 U7 , " ' STAND BY FOR FURTHER ANNOUNCEMENT. THIS 3 (IS) (IS NOT) A DRILL."

e 9

. - . . . . -- 4 s 's i EP-105, Rev. 8 Page 3 of 14 l VAW/JLP/kml J

2. Emergency Assembly With Accountability 1
a. Contact the Security Team Leader. l Inform him of the selected exit point (s), that emergency assembly '

with accountability is going to be implemented, and to activare the Security Team (EP-208) and to perform personnel accountability in accordance with EP-110, Personnel '

Assembly and Accountability,

b. Cont struc 'on Security

'and inform them tnat personnel eaving Unit 1 will be reassembling at the Personnel Processing Center (PPC).

"THIS (IS) (IS NOT) A DRILL, THIS (IS) (IS NOT) A DRILL. DESIGNATED '

EMERGENCY PERSONNEL REPORT TO ASSIGNED EMERGENCY RESPONSE FACILITIES OR ASSEMBLY AREA. ALL OTHER UNIT ONE PERSONNEL LEAVE THE PROTECTED AREA IMMEDIATELY AND REASSEMBLE AT THE PERSONNEL PROCESSING CENTER. THIS (IS) (IS L

, NOT) A DRILL. THIS (IS) (IS NOT) A

.- DRILL."

, 'For OFF-hours, if not already accomplished during an Alert or Site Emergency Response

, ~

procedure, direct the Shift Clerk to activate

(- F' the recall list using EP-291, Staffing Augmentation. If Shift Clerk is not available, J. this function may be assigned to any available '

individual.

g) , Direct the activation of the Technical Support r Center in accordance with EP-201, Technical b'2.. Support Center (TSC) Activation, if not already 5 activated.

!, 7A Direct activation of the Emergency Operations

/ Facility in accordance with EP-203, Emergency d7!- ' Operations Facility (EOF) Activation, if not x ,,,d already activated.

C. .

2tT' If the EOF has not been activated earlier, during an Alert or Site Emergency Response procedure, direct a communicator to call EOF personnel (directing them to report to the EOF) using EP-279, EOF Group Phone List.

i

~ . ,...... ._ . - . . . - . .: n.w . u. ..

, EP-105, Rev. 8 r .

Page 4 of 14 l -

VAW/JLP/kml j s 2.1.12 Assign an Operations Support Center Coordinator

{ (PO), if not already done, to direct available

personnel to report to the Operations Support j Center and to activate it in accordance with EP-
202, Operations Support Center (OSC) Activation.

j 2.1.13 For samples, direct the Shift Chemistry 1 Technician or Chemistry Sampling And Analysis i

Team Leader to implement EP-230 Chemistry Sampling And Analysis Team.

2.1.14 For in-plant surveys, direct a Shift EP -

. Technician or Personnel Safety Team Leader to implement EP-250, Personnel Safety Team .

)

j 2.1.15 For field surveys when a release of gaseous s

] radioactive material has occurred or is suspected, direct Dose Assessment Team Leader to implement EP-210, Dose Assessment Team .

2.1.16 For a release at or greater than the Alert level in EP-101, Classification of Emergencies, or at

, the discretion of the Emergency Director, direct 4

the Dose Assessment Team Leader to implement

, EP-210, Dose Assessment Team.

g' 2.1.17 On an interim bases, direct the Shift Technical Advisor to perform dose projections using EP-316, Cumulative Population Dose Calculations for l Airborne Releases-Manual Method or EP-315 i Calculation of Offsite Doses during a

{ Radiological Emergency using RMMS in the Manual Mode and to suggest Protective Action Recommendations per EP-317.

2.1.18 For fire /damaae repair direct the Maintenance Shift Assistant Foreman or Fire and Damage Team 3 Leader to implement EP-260, Fire and Damage Team j and/or EP-261 Damage Repair Group.

a

! 2.1.19 For a liquid release, implement EP-312, Radioactive Liquid Release, if required.

L 2.1.20 For Security matters, contact Security Shift f Supervision and direct implementation of EP-208, l Security Team, unless previously done.

i

g.a..;  := . . = - .:a.:: . . c.z. z...-..... . . _ . . . . - . .

]

EP-105, Rev. 8 Paga 5 of 14 VAW/JLP/kml j 3.0 ACTIONS - FOLLOW-UP 3.1 Emeroency Director shall:

  • l1 3.1.1 Verify that the Technical Support Center, l Emergency Operations Facility and the Operations i Support Center have been activated.

l? -

3.1.2 Periodically evaluate the event classification in accordance with EP-101, Classification of p Emergencies. If the conditions change, j deescalate to an appropriate classification.

k l 3.1.3 If classification is de-escalated, fill out

[ Appendix EP-105-2, General Emergency De-l escalation Notification Message, and give it to the communicator and direct the communicator to perform notification of the appropriate parties u listed in Appendix EP-105-4, General Emergency

] Phone List (Escalation or De-escalation).

l r 3.1.4 Obtain the following information as necessary to

j. formulate further actions:

} A. Security Status from Security Team Leader

\ r B. Sample analysis from Shift Chemistry Technician or Chemistry Sampling and Analysis Team Leader C. In-plant su'rveys from Shift EP Technician or j Personnel Safety Team Leader l

I D. Field surveys from Shift HP Technician or l Dose Assessment Team Leader i

E.- Dose projections and protective action recommendations from Shift Technical Advisor or Dose Assessment Team Leader F. Fire / Damage Repair status from the Maintenance Shift Assistant Foreman or Fire

! and Damage Team Leader G. Notification results from Communicator 3.1.5 Discuss protective action recommendations with the Site Emergency Coordinator.

3.1.6 If not already performed, determine which additional support personnel are necessary for emergency functions and direct the Shift Clerk l

'.. ,. . _ . ~ , _ . .

7 7. . . . - :. . ,

~

= . ;: a a.::.n . . . . . -

k-. .

7 . . ..

!! EP-105, Rev. 8 j .

Page 6 of 14

j. VAW/JLP/kml A

i i ,

or other assigned person to contact those

personnel.

j 3.1.7 Provide site personnel with public address (PA)

speaker announcements for any major changes in

{ plant emergency status, such as changing emergency action levels.

L 3.1.8 Evaluate the need and order evacuation of

} effected areas as necessary.

} Refer to the following procedures: -

1

? EP-303 Local Evacuation EP-305 Site Evacuation i EP 306 Evacuation of the Information

! Center I 3.1.9 Perform the following until relieved by the Site

.i Emergency Coordinator:

A. Discuss protective action recommendations with the Dose Assessment Team Leader.

B. Provide protective action recommendations to i' the Pennsylvania Bureau of Radiation Protection.

C. Inform the various emergency response groups if the recovery phase organization is to be implemented.

3.2 Communicator shall:

3.2.1 Inform the Emergency Director when appropriate notifications have been made and submit completed copy of Appendix EP-105-4 General Emergency Phone List (Initial Notification) or Appendix EP-105-5 (Escalation or De-escalation) for Emergency Director's signature.

s

4.0 APPENDICES 4.1 EP-105-1 General Emergency Notification Message 4.2 EP-105-2 General Emergency De-escalation Notification Message e "a */<'f,*s' ,
  • g sw & a =.e , e

a .

V -

3 EP-105, Rev. 8 Page 7 of 14 ,

VAW/JLP/kml '

) 4.3 EP-105-3 General Emergency Phone List (Initial Notification) 4.4 EP-105-4 General Emergency Phone List (Escalation or De-escalation)

[- 5.0 SUPPORTING INFORMATION T

(- '

. 5.1 The purpose of this procedure is to provide guidelines for the site response to a General S Emergency.

I '

5.2 Criteria for Use f

5.2.1 This procedure shall be implemented when an event has been classified as a General Emergency l per EP-101, Classification of Emergencies, and

[ EP-101 has been completed.

. 5.3 Special Ecuipment None I{ 5.4 References 5.4.1 Limerick Generating Station Emergency Plan j 5.4.2 NUREG 0654, Criteria for Preparation and 4

Evaluation of Radiological Emergency Response

! Plans in Support of Nuclear Power Plants l

., 5.4.3 EP-101 Classification of Emergencies

5.4.4 EP-201 Technical Support Center (TSC) Activation 5'.4.5 EP-202 Operations Support Center (OSC)

Activation

$ 5.4.6 EP-203 Emergency Operations Facility (EOF)

  • 3 Activation i
j 5.4.7 EP-291 Staffing Augmentation 3

j 5.4.8 EP-303 Local Evacuation

! 5.4.9 EP-304 Partial Plant Evacuation 5.4.10 EP-305 Site Evacuation

, 5.4.11 EP-306 Evacuation of the Information Center

?

't b

-7 - me *= wen, *um ee g e e ew - e , gee ,ep

_ .e>= _e

  • esp . , e=== e a < > = = =

$ '""*'? *f 4 W

- * ' ~

, . EP-105, Rev. 8 Page 8 of 14 VAW/JLP/kml r'

5.4.12 EP-317 Determination of Protective Action +

Recommendations 5.4.13 EP-316 Cumulative Population Dose Calculations

'l For Airborne Releases - Manual Method j 5.4.14 EP-110 Personnel Assembly and Accountability 5.4.15 EP-208 Security Team 5

l- 5.4.16 EP-210 Dose Assessment Team

5.4.17 EP-230 Chemistry Sampling and Analysis Team '

5.4.18 EP-250 Personnel Safety Team 5.4.19 EP-260 Fire and Damage Team 5.4.20 EP-261 Damage Repair Group 5.4.21 EP-312 Radioactive Liquid Release h{ '

5.4.22 EP-279 Emergency Operations Facility (EOF) Group Phone List 5.4.23 EP-315 Calculations of Offsite Doses during a Radiological Emergency using RMMS in the Manual Mode.

? .

i .

I i

I l

l

_q .

_p . p *W hoser eNN M4* ""

m_ _I

4 l EP-105 Rev. 8 Pags 9 of 14 l

4, VAW/JLP/mla 4

APPENDIX EP-105-1 GENERAL EMERGENCY NOTIFICATION MESSAGE j MESSAGE: This (IS) (IS NOT) a drill. This (IS) (IS NOT) a drill.

V 4

} This is the Limerick Generating Station calling to report a General 5

1 i Emergency. My name is , telephone 3

. Limerick Generating Station is reporting a General _ .

a k

g Emergency declared at Unit No. . Time and date of General k

[ Emergency classification are f , .

(24 Hr Clock Time) (Date)

{

i The, basic problem is l ,

There (HAS BEEN) (HAS NOT BEEN) an (AIRBORNE) (LIQUID) radioactive f

i

. release from the plant. The plant status is (STABLE) (IMPROVING) ,

(DEGRADING) (NOT KNOWN). The protective action recommended is l* . The affected area is . This l (IS) (IS NOT) a drill. This (IS) (IS NOT) a drill.

l *IF A GENERAL EMERGENCY HAS BEEN DECLARED WITHOUT PRIOR EMERGENCY CLASSIFICATION, PROVIDE THE RECOMMENDATION TO SHELTER WITHIN THE 2 MILE RADIUS AND 5 MILES DOWNWIND OF THE PLANT. IF PEMA & BRP ARE NOT AVAILABLE, MAKE THE RECOMMENDATION DIRECTLY TO THE COUNTIES.

r g e e _ --- e m e *'

  • r e . Mem ega . _ _ e esees -*NMt* * * * * * * * * * ' * * *
  • g -. . y. .

i e

l EP-105 Rev. 8 Page 10 of 14 -

l VAW/JLP/mla APPENDIX EP-105-2 GENERAL EMERGENCY DE-ESCALATION NOTIFICATION MESSAGE Message: This (IS) (IS NOT) a drill. This (IS) (IS NOT) a t

drill. This is Limerick Generating Station calling to report a Q

change in emergency action level. The General Emergency has t

) been (DE-ESCALATED TO) (AN UNUSUAL EVENT) (AN ALERT) (AN SITE i

EMERGENCY) (TERMINATED). Time and date are

, . The plant status is (stable)

(24 Hr Clock Time) (Date) t (IMPROVING). My name is .

~

s_.

This (IS) (IS NOT) a drill. This (IS) (IS NOT) a drill.

i 4

e

T.f .

l EP-105i nev. 8' Page 11 o f' 14 l

VAW/JLP/rgs.

APPEllDIX EP-105-3 GEllERAL F.t1CitCE!!CY PilOrlE LIST 1

(Wime Initiated (INITIAL tiOTIFICATIOtl)

CIRCLE PIIONP.

!Hir1 DER USED 1 Per sonnel/ Agency To De Notified Phone Plumber ITime s f.Respondinq k

j a. Station Superintendent ilome Office

,, y .

g G. ?! . Leitch .

4 :. ,

j J. F. Franz Ilome k ,, , m Office  ; .

k ,_  ?

P. J. Duca llome 4' Offi n %v u .r:

b. Load Dispatcher office ..

~

c. Montgomery County Office of b Emo n P redness
d. Pennsylvania Emergency fianagement Agency -

j l Pennsylvania Bureau of ( 8 Af t-4 Pit)

c. Radiation , Protection - ( 8A?1-4 Pit)

Ilarrisburg, PA gh] 3

( 8 Af t-4 P?t) pet 1A aft Ilome

!!anager - Public Information

f. Ronald liarper Office .

Pager

"% s ys '

MW

1 l

EP-105, Re v '. 8 Page 12 of 14 l VAW/J T.P/rg s .

APPEt! DIX EP-105-3 GIRII RAI.1:tiEltGEt1CY PilOME LIST Time Initiated (IIIITI AT. ?!OTIFICATIOt0

~

CIRCI,E PITOT 1E

(-Personnel I / Agency To Be tiotifled t1Ut1BER USED Phone !! umber Time Person Responding

g. Director - Emergency llome l

Preparedness Office Roberta Kanhus 1 Jerry Phillabaum Ilome s Office l '

l Victoria Warren 1 tome -

Offic ,

h. NRC Operations Center ,

Bethesda, t1D Make this call last and remain on

' telephone until tRC disconnects (Person contacting NRC must be

[, ice nsed rator g 49encies to be contacted after *

^

l Lhe above personnel / agencies have nB l

j been notifed

,,h

i. Derks County Emergency

%{

Mana ement A nc .- _ . . ...

1. Chester County Emergency .
  • Services e >' 'f Completed By: Time /Date _ ..gj Verified By:

, Et1ERGE!!CY DIRECTOR

1 l ~

EP-105, Rev. 8, Page 13 of 14 l

VMT/JLP/rgs ,

APPEt! DIX I:P- 10 5 - 4 GE!!ERAL Et1ERGErlCY PIIOr1E LIST Time Initiated (ESCALATIOt! OR DC-ESCAI.ATIOll)

/~

CIRCI.E Pilot!E h ilUf1RI:n llS ED Pe r sonnel enc To Be Notified Time

a. Person Responding Station Superintendent ilome

! G. M. Leitch Office

~,

J. P. Franz Ilome e-,

Office ,

l P. J. Duca llome

! Offi l - ';

b. Load Dispatcher Office
c. Pennsylvania Dureau of f &

Radiation Protection .',

iia r r i sburg , PA (8am-4pm)g, (8am-4pm) -

(8am-4pm) . g (pet 1A a f tre u s)

. NRC Operations Center Bethesda, t1D '

sJ 1ake this call last and remain on A- ?UI telephone until t!RC disconnects N (Person contacting NRC must be Licensed Operator)

~

'A

. e EP-105, Rev. 8 l Page 14 of 14

  • g VMT/JLP/rgs ..

l APPEtIDIX EP-105-4 CEt!ERAL E!1ERGE!!CY Pi!O!!! LIST ll l

Time Initiated (ESCALATIOri OR DE-ESCM.ATIO!!)

)

~'

7- CIRCLE PllOTIE lg I flUt1 DER USED Personnel / Agency To Be tiotified Phone flumber Time Person Responding

' Agencies to be contacted af ter .

,1 the above personnel / agencies have .

been notified

c. Montgomery County Of fice j of Emo Pr redness __

0

f. Berks County Emergency Mana ment n

'I

g. Chester County Emergency

! Services

, i

Completed Dy: Time /Date I I

!' Verified By: o 0 EMERGEtICY DIRECTOR l

fl[ ,ff .-

~ s,

-. . m_m. __.:m .. , mm t

i . ..

i' .

3852069770 EP-244 Rev. 3 l ' Page 1 of 4 l .. VAW/JMU/jmv i ,

i PHILADELPHIA ELECTRIC COMPANY 1

LIMERICK GENERATING STATION pp yf l EMERGENCY PLAN IMPLEMENTING PROCEDURE I

i i

EP-244 OFFSITE ANALYSIS OF HIGH ACTIVITY SAMPLES I-1.0 PARTICIPANTS i

j 1.1 Chemistrv Sampling and Analysis Team Leader shall

( contact the Emergency Director and request off-site j sample analysis as required.

1.2 Emergency Director shall determine the need to ship a

, sample off-site for analysis and request the Site r Emergency Coordinator arrange transportation for the

sample.

1.3 Site Emergency Coordinator shall contact the Coordinator for Health Physics and Chemistry to request the PASS sample cask.

?

j 1.4 Health Physics and Chemistry Coordinator shall contact 5

1 the vendor supplying the shipping cask for this PASS j sample.

i 1.5 Personnel Safety Team Leader shall arrange for cask 4

loading at the site.

2.0 ACTIONS-IMMEDIATE i*

' 2.1 Chemistrv Sampling and Analysis Team Leader shall: -

2.1. /C 4 , qntact the Emergency ample analysis as required. Director and request off-site 4 , mergency Director shall:

L

' g'Determineg hat the need to ship a sample off-site for analysist is) valid based on the limitations of the on-k., ?

i .

Ite peaIyt'ical capabilities for hot samples og a p g ,7 determin core M* nee $fti n5tticE Ys j "

f 3- jj.-];,, f 'f Is'i lF p 3 '6m{#Eff4fte

[

$yt -

4  ; .

g a -

h W

o.w- ~- *- 4

. . . , . . . . .- i. , ,

EP-244 Rev. 3

, Page 2 of 4

. VAW/JMU/jmv 2.2.2 Contact the Site Emergency Coordinator and request transportation of the sample for off-site analysis and an estimated cask arrival time when available.

2.3 Site Emergency Coordinator shall:

2.3.1 Request that the Health Physics and Chemistry Coordinator contact the vendor responsible for supplying the PASS sample cask.

2.4 When the sample from the Post Accident Sampling Station is to be shipped off-site for analysis, the Personnel Safety Team Leader shall coordinate the .

following:

2.4.1 Contact the vendor that will be performing the leak test on the cask, Scientific Application, Inc., (EP-  :

l 284, Company Consultant and Contractors Phone List). l l 2.4.2 Notify the recipient of the sample, Babcock and l Wilcox (EP-284) Company Consultant and Contractors l Phone List.

2.4.3 Contact Fire and Damage Team Leader for obtaining vacuum. pump if required.

2.4.4 Arrange for the appropriate shipping papers to be completed.

2.5 When the Wide Range Gas Monitor sample is to be shipped off-site for analysis, the Personnel Safety Team Leader shall'ecordinate the follow' -

2.5.1 Not '

the recipient, Peach Bottom at ex. uring normal buriness hours and ex after normal hours or Babcock and Wilcox (EP-284, Company Consultar and Contractors Phone List). ogs(,

p 2.5.2 Arrange for' the sample to be placed gyn (b' ) iggnated shipping container. n q,

,, u1 , ,

2.5.3 Arrange for the appropriate sh , O o be completed. Q., lh, '

/ 'g '

Tf' h b

<.9 c. ' . b'. .$

4 e f4.;,.)<.; +

k [ i, 'l

. f

!'efk>

.. m. _
m. .m . . .n . _ 2 u.- _ . . . .. ., _ &. _xw .mn. . s ,.c r.=

. EP-244 Rev. 3

t .g. - -

Pago 3 of 4 l ., VAW/JMU/jmv 3.0 ACTIONS-FOLLOW-UP d

j 3.1 Personnel Safety Team Leader shall:

3.1.1 Assign an individual to load the cask in accordance i with all applicable Limerick radwaste shipping s procedures specifically HP-713.

. UNLESS OTHERWISE DIRECTED, THE CASK WILL BE SHIPPED TO j _._. 'THE BABCOCK AND WILCOX RESEARCH CENTER IN LYNCHBURG, VIRGINIA OR PBAPS.

J

~

j 4.0 APPENDICES 4.1 NONE' l

5.0 SUPPORTING INFORMATION

! 5.1 Purpose i

The purpose of this procedure is to coordinate the shipment of high activity samples to off-site

laboratories for analysis.

5.2 Criteria For Use 5.2.1 Samples must be sent to specially equipped off-site l laboratories when 1) the activity is judged to be too i great for the on-site facilities; and 2) when there is l a need to determine the condition of the core by off-site analysis; or 3) on site facilities are not available.

j ..

5.3 Soecial Equipment

! 5.3.1 30 Gallo.n Shipping Container for WRGM sample 5.3.2 PAS-1. Cask for PASS Sample (Supplied by PIL) 5.3.3 Leak Test Equipment for PAS-1 cask I 5.4 References 5.4.1 HP-713 - General Packaging, Marking and Labeling

( Requirements for Radioactive Materials for Shipments 5.4.2 EP-272 - Philadelphia Electric Company Officials Phone List e

e

= - - ,  ;. , - . , ~ - - -

i.,

0 70 n Tc fy p _-

, f

.  : .. . . .  :.. . - . .,w.= : c.a.-a ~ :e ; .a ..

, , EP-244 Rav. 3

, Page 4 of 4

. VAW/JMU/jmv E .. ,

5.4.3 EP-284 - Company Consultant and Contractors Phone List 5.4.4 EP-120 - Site Emergency Coordinator 5.4.5 Babcock and Wilcox - Project Technical Plan for Post Accident Sample Analysis Program f'

J 5.4.6 HP-914 - Loading and Closing of Radwaste Cask

{

h.

c l .

o I

l e,

k'.

I i

_ . . . e..--wwm ~---e**-

e s

,~ s ~ r

- cv-? ",73

  • s ~~. gf * *' '7 ' *
  • l
  • EP-280 Rev. 6 3852069650 Page of s VA"' P/rgs PHILADELPHIA ELECTRIC COMPANY LIMERICK GENERATING STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE 1

EP-280 TECHNICAL SUPPORT CENTER PHONE LIST 1.0 PARTICIPANTS 1.1 The Emergency Director shall be responsible to have group members notified.

1.2 The Communicator shall call in TSC perscnnel.

I 2.0 ACTIONS - IPS.IDIATE 2.1 The Cermunicator shall call people from the following list until appropriate positions are filled. d l 2.1.1: EMERGENCY DIRECTOR (ONE)

Home Work Station Superintendent G. M. Leitch j Assistant Station Superintendent J. F. Franz j Technical Engineer '

l P.J. Duca \

l l l 2.1.2 TECHNICAL SUPPORT GROUP PERSONNEL (FOUR one must be l l licensed) i Home World l 4 rformance Engineer

' L. A. Hopkins

' x9 l

l p 793, V. Cwi . wicz* I j

';N I % CJ Rhi ineer )

f %'4,G.N-.ney k'v r ~

Y/ -

3 , e .w . - - - ~ * * ~~~

f,___,,.-.______________.___________ - - - - ~ - ' -

'l EP-280 Rev. 6 i

Page 2 of 5 VAW/JLP/rgs i

Home Work l Reactor Engineer K. Hunt l - K. Kemper*

- E. Callan i

l - J. Armstrong f l - M. Gallagher*

- R. Alejnikov

} I I I - J . Mu n t :: * .

gagy l j - R. Cyhan f I - M. McCabe l . - 3. Mandik* i l

i l f

  • Licensed i 2.1.3 PERSONNEL SAFETY TEAM LEADER (ONE) i

{ Home Work l

. Sr. Health .

I l Physicist i . R. W. Dubiel 1

Applied Health >

Physicist

\'

R. J . Titolo 2.1.4 FIRE and DAMAGE TEAM LEADER (ONE) j

) Home Work i

' r

[

l Engineer - Maintenance J. Cotton  !

i i

C. Wyler i Or  ;

l R. Braun .

P

r [.'. . -" ' d/ l 54,-f
L L ~,.. ' cD u 4 . .

i

}

-._._..;_----.-_.. - - - - - - - - - - - ~ ~ "

_ _ r: 2 2' :r r __ _ _ _ _'_"~ ~ ~ ~~*'~~ ~ ~ ~ -* ~ ---~ ~ ~ f r -'

, . VAW/JLP/rgs 2.1.5 SECURITY TEAM LEADER (1)

! Home Work f '

Security Administrative Assistant P. Supplee Home Work Site Captain -

Operations Security .

(Protected Area)

Mark Berner 1 i Access LT. m:=sramwammm Richard Parker 2.1L6 DOSE ACCESSMENT TEAM LEACER (ONE)

I Home Work l l Health Physicist l G. Murphy i

I j D. Rombold I

2.PD 3rMISTRY SAMPLING AND ANALYSIS TEAM LEADER (ONE) y.

e Work .

p "

Chemist

__. J -

S. Wiley l' ~

.,i ervisory Chemist 9,, Sabados 31-

2. .8 COMMUNICATORS AND STATUS BOARD KEEPERS (FIVE MINIMUM)

Q- / z Lead Communicators

&JC ;1113 33 Home Work i . Feaster l '.D' E Boscola

.[;y.} Brown

... Hv3 Davis \

w , ., - i l . Dickenson V'i

_ ... , 7 _ .

I EP-280 Rev. 6

. Page 4 of 5 VAW/JLP/rgs [

6 i

Home Work i

J. Dolan f i

M. Eyre i G. Hutchison l l J. Kanute D. Kelsey ,

l J. Krais

,. Marabella crema .2 l l K. Mastrangelo I

l T. Moore (Tim)

... D. Shaner j

  • I T. Shea

= J. Tyler -

I

,.- K. Walsh l i

f R. Weidner  !

' ;u x21.=

S. Weik I

.. DATA DISPLAY OPERATOR (TWO) j r -- e  ;

"r p

. g, Home Work l ,5 E. Kabak }

.; ~

M. McCormick i

(? 9:' D. Boston B

l l j

{g,,,g.10 RECORD'SROOMPERSONNEL i E. H11atech l

  • D. Christman  ;

R. J. Birney

^

l

(

g4 i

! I j

i 1.__. _ _ _ _ _ _ . _ _ _ _ _ _ _ . _ _ _ . - -

_ _ . . .. a , e.;, , . -

t l* EP-280 Rev. 6

. , Pago 5 of 5 9

,, VAW/JLP/rgs 9- .

- 3.0 ACTIONS - FOLLOW UP None 7.

t 4.0 APPENDICES I

None

^

P P

5.0 SUPPORTING INFORMATION ~

i 5.1 Purpose j

The purpose of this procedure is to provide guidelines and information to call in Technical Support Center (TSC) personnel.

5.2 Criteria for Use 5.2.1 The Technical Support Center is to be activated.

5.2.2 Additional Technical Support Group people must be called in.

f-5.3 Special Equipment None 5.4 References None l

l l

l i

__ _w w p, * =m e se ee e == * = -

4 y -- , , - - , y--. , ,,- -w -

, -,-.-w- ,,-,+.e-ww w v + ..w -

r

s , -

EP-315 Rev. 4 c

' 3852069660 Page 1 of la MAC/nlp l i '

, PHILADELPHIA ELECTRIC COMPANY J /,2 FI i

LIMERICK GENERATING STATION

)

{ EMERGENCY PLAN IMPLEMENTING PROCEDURE I ,

i l EP-315 CALCULATION OF OFFSITE DOSES DURING A (POTENTIAL) j RADIOLOGICAL EMERGENCY USING RMMS IN THE MANUAL MODE i

I I

i 1.0 PARTICIPANTS i

1.1 The Shift Technical Advisor (STA) shall initiate dose calculations upon indication that an effluent monitor j setpoint has been exceeded.

! l 1.2 The Shift Superintendent shall evaluate the dose results, declare the appropriate EAL based on l releases, and assist the Emergency Director in making PAG recommendations if warranted.

3 The Dose Assessment Team Leader (upon activation of the TSC, and/or the EOF) shall direct dose calculations, evaluate the results, and assist the Emergency Director with EAL declarations and PAG recommendations.

i , The RM-ll Operator shall provide radiation release g' data to the Dose Assessment Team Leader and the RM-21A 0 Operator.

$(,9'b. '

.5 The,1tM-21A operator shall use this data and mececirological information to generate of fsite dose

$. timates using the RMMS computer.

R- ,

"?7 .6 '

e calculator shall assist the RM-21A Operator with i s g data entry problems and periodically update the Dose L /,6v Assessment Status Board Keeper and the Meteorological Status Board Keeper.

%* ACTIONS IMMEDIATE

p. if4 c. ;

g ], ryg3 y FU b,

g$y ,y

?.'

  • N
  • ~' "
2. R O'3e' t 7 h I Y

, ".10 6 E '.,. , 'f 6

.k s t J ric' Mg n in ication that an h

g <I, b'I;Dfifient release in excess of instantaneous l Technical Specifications may have occurred, an offsite dose calculation shall be

.. _. . - - - . - ~

, 2. a. a.s. ~~

an. . a ,  : . w.

3 EP-315 Rav. 4 Page 2 of 13 "l ,

MAC/ nip initiated by the STA to evaluate the release. He shall also request the Chemistry Department to take a chemistry sample.

INDICATORS OF EXCEEDED SETPOINTS - RM-ll ALARMS, AN RM-ll i CHANNEL BLINKS, CHEMISTRY ANALYSES. FOR INDICATIONS BASED ON

[ CHEMISTRY ANALYSES, GO DIRECTLY TO STEP 2.1.8.

2.1.2 The following channels on the RM-ll console f provide an indication of a potential l l Technical Specification release if in a blinking red state and audibly alarming:~ ~

North Vent South Vent

[ CHNL I DESCRIPTION CHNL i DESCRIPTION 4TE076 N STACK TOTAL EFFLUENT

! _2IE075 N STACK VENT EFL IOD 2IE185 S STACK VENT EFL IOD j SIE075 N STACK VENT EFL IOD 5IE185 S STACK VENT EFL IOD i

3GE075 N STACK VENT EFL GAS 3GE185 S STACK VENT EFL GAS 6GE075 N STACK VENT EFL GAS 6GE185 S STACK VENT EFL GAS

        • 4TE076 WILL BLINK IN YELLOW f **** FOR AN IODINE ALARM, DO NOT DECLARE AN UNUSUAL EVENT UNTIL THE CHEMISTRY SAMPLE BECOMES AVAILABLE FOR EVALUATION.

2.1.3 When the RM-ll alarms or a specified channel blinks in red, enter GRID I.

2.1.4 Access the channel (displayed by an alphanumeric code in an alarming / blinking state) by entering the following:

! (Numeric portion of the code, SEL, 10 MIN TREND) l l' If a North Vent (NV) channel has alarmed, enter (4076) l as the numeric code.

l 2.1.5 Note the value units (in the upper right hand corner of the RMMS console) in the RMMS Log. This represents the concentration (uCi/cc) or release rate (uci/sec) at this channel.

2.1.6 Note process flow N. (in the upper middle of the RM-ll console) in the RMMS Log.

Process flow A is used only when offsite power has been lost or the fans to the major enclosures have been turned off.

h -

- e

- ... u .e: . . . . .  :-.. ~ .

j * .*

j

) ,' EP-315 Rav. 4 Page 3 of 13 l h MAC/ nip I

l i

UCI/SEC, OBTAINED FROM A NV CHANNEL, IN STEP 2.1.5, MUSI BE J. CONVERTED TO UCI/CC

uCi/cc = uCi/sec

, (process flow) x (472)

2.1.7 The STA (RM-21A Operator) will logon to the RMMS-RM-i 21A system using the appropriate user name and
j. _ __ password.

?

2.1.8 The RM-21A Operator will select the following options:

2.1.8.1 #6 - Emergency Dose Calculations, enter 1

2.1.8.2 43 - Class A Dose Model, enter j 2.1.8.3 43 - All Manual Mode, enter 1

J THE OPERATOR SHALL GENERATE A HARD COPY OF ALL 1 INFORMATION.

I 2.1.9 Review the run control table.

Edit the table to reflect the Appropriate release point (s). (COPY)

Release point 1 =' North vent Release point 2 = South vent Enter. return to get back to "date of rx trip".

2.1.10 Enter the following information:

  • 2.1.10.1 date of rx trip - If the rx has not tripped
or scrammed, enter the start time of the release.

2.1.10.2 j time of release -Enter start time of release or the beginning of the period to be evaluated. This time must be equal to or g later than the time of rx trip.

t .

EASTERN STANDARD TIME (EST) IS USED BY RMMS. EST IS L

EQUAL TO DAYLIGHT SAVINGS TIME MINUS 1 HOUR.

2.1.10.3 remaining duration of release - The operator must request that the Shift Supervisor provide him with an estimated duration of release. If the duration cannot be estimated with confidence, enter 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

(COPY)

THE REMAINING DURATION OF RELEASE IS USED IN THE EAL TABLE WHICH PROVIDES THE OPERATOR WITH INFORMATION REGARDING CLASSIFICATION OF AN EMERGENCY BASED ON RADIOLOGICAL I

....__...1_. . _ . - - - . _ _ . . - . _ . _ . _ . _ . . . . . . . ..

s 'a

\

EP-315 Rev. 4 a Page 4 of 13 MAC/ nip RELEASES. IT IS ALSO USED IN THE PAG

SUMMARY

DISPLAY TO PROVIDE GUIDANCE ON WHEN PAGS MAY BE EXCEEDED.

2.1.10.4 isotopic release data

1. #2 - isotopic percent fraction (sum = 1. 0)
2. Select the desired isotopes based on the following criteria.
3. COPY -

ALARMING MONITOR

  • If the rx has not scrammed, enter the isotopic abundance for the month. This information is provided by the chemistry department and located in the EP-315 guide next to the RMMS console.
  • If the rx has scrammed, enter the isotopic abundance per Appendix EP-315-1, which is also located in the EP-315 guide next to the

,/' RMMS console.

wrq $ ,

s'- j CHEMISTRY ANALYSIS

.f I

  • Utilize the isotopic mix used by chemistry I* ,# to determine that the setpoint has been exceeded.

- 2.1.10.5 vent flow rate - see step 2.1.6, (COPY) t s" g '

2.1.10.6 gross concentration of the release c ,, - - ALARM - see step 2.1.5 i s;- . CHEMISTRY - taken from the analysis report

,3 6' Remember to convert (uCi/sec) to (uCi/cc) i e

if necessary.

t' :,'

C 2.1.10.7 meteorological data - Obtain the data from the Meteorological Data-Logger and enter the h,w sensor which corresponds to the prompt.

. (COPY) Refer to Appendix EP-315-2 4+ ,.

If Data-Logger is unavailable, the Operator shall obtain the data from the following t .

sources (listed in order of preference):

1. Control Room Strip Chart Recorders l 2. Control Operator (Ext
Request Tower , 75' wind speed

{

i

j- ,

. EP-315 Rev. 4

  • . Page 5 of 13 MAC/nlp and direction, 300' - 30' delta T for stability determination.
3. National Weather Service 2.1.11 Review the Site Boundary Emergency Action Level Display for the current action level, generate a hard copy and inform the Shift Superintendent of the action level.
        • Repeat steps 2.1.8 through 2.1.11 for each release point If the EP is initiated due to an RM-ll alarm, repeat all calculations using the isotopic mix provided by Chemistry as soon as the mix becomes available.

2.1.12 For a current action level of unusual event or greater, generate a hardcopy of the following reports, unless otherwise directed by the Dose Assessment Team Leader.

2.1.12.1 (X/Q) Display 2.1.12.2 Projected dose summary 2.1.12.3 Summary report 2.1.13 Repeat steps 2.1.8 through 2.1.11 where any following condition is observed:

2.1.13.1 A new high alarm (blinking, audible) from any channel per step 2.1.2 is indicated on the RM-ll console.

2.1.13.2 An upward trend is observed in any channel per step (2.1.2) while it is in the high alarm state.

2.1.13.3 An EAL value described on either the RM-ll or RM-21A Operator Aid card is met or exceeded.

AT THIS TIME, IT IS THE DISCRETION OF SSVN TO TERMINATE THE PROCEDURE OR INSTRUCT THE STA TO PERFORM PERIODIC DOSE ASSESSMENT CALCULATIONS (AND/OR) IMPLEMENT THE NEXT STEP OF THIS PROCEDURE.

To terminate the RMMS program, enter ( /E, return) 2.2 Dose Assessment Turnover to th, S n..

Qf L5f .

ec,, .

e .

, . . , u I.

' I' *

.. 1 y

s a)

. . . , . _ . ., , . - . - m.-,  :. +.a. . . . .a ixa %w.aa i

- A6

, EP-315 Rav. 4 -

Page 6 of 13 MAC/ nip tr

.2.2.1 Upon activation of the TSC, the RM-21A Operator in Control Room will provide the following information to l_ the Dose Assessment Team Leader in the TSC.

2.2.1.1 time of rx trip or scram l 2.2.1.2 location of release l 2.2.1.3 time of release l 2.2.1.4 estimated duration of release

, 2.2.1.5 Containment Radiation Moni' tor information to -

l include: primary containment leakage, 1

drywell purging, number of fans operating,

, hours purged l 2.2.1.6 wind direction, ground and elevated I'. 2.2.1.7 location and value of peak (X/Q), depleted j and undepleted l 2.2.1.8 time to reach peak (X/Q) l 2.2.1.9 location and value of peak whole body gamma dose rate l 2.2.1.10 location and value of peak thyroid dose rate l 2.2.1.11 whole body gamma dose rate at (2, 5, 10) miles l l 2.2.1.12 phone number where the RM-21A Operator in j the Control Room can be contacted.

l 2.2.1.13 Protective Action Recommendation (s) if any were made I

2.2.2 Upon turnover of dose assessment from the Control Room to the TSC, the Dose Assessment Team Leader shall:

! 2.2.2.1 Brief team members on plant and release status.

l 2.2.2.2 Assign personnel as RM-21A Operator, RM-ll i

Operator, Calculator, Field Survey Group Leader.

2.2.2.3 Contact Chemistry for the status of the plant to include SGTS filter efficiency and isotopic breakdown of drywell air and reactor water.

__ _ _ _n -__ ._ _ . . . - . - . . . - . . . . . - . . .

g A

_ . . , . . , . , , . e q _ . . . . .. .; . ,.

_ y .r gmow. w e b;.1, f e .

M1 l .

+ *.

EP-315 Rev. 4 Page 7 of 13 ja MAC/nlp y

Ll

] 2.2.2.4 Initiate and direct dose calculations.

j l 2.2.2.5 Review dose calculation parameters.

l 2.2.2.6 Evaluate results (Summary Report and 9

Projected Dose Summary) against whole body

$ gamma and thyroid inhalation PAGs.

.c

$ \ 2.2.2.7 Periodically brief the Emergency Director on l}

offsite dose results and assist him with PAG

] recommendations if conditions are warranted.

i ~

i

] 2.2.2.8 Periodically update the BRP on plant conditions, meteorology, and actual or potential releases.

2.2.3 The RM-ll Operator shall M

, 2.2.3.1 Continuously assess radiological trends from the drywell high-range radiation monitors

, and plant effluent monitors and inform the Calculator as conditions change.

L 2.2.3.2 Update the Calculator and Dose Assessment p

Team Leader, on an approximately 15 minute p' basis, with information from the affected radiation effluent monitors unless otherwise directed by the Dose Assessment Team Leader.

2.2.3.3 Inform the Dose Assessment Team Leader

i. immediately in the event that any EAL has

( been reached or exceeded.

. 2.2.4 The Calculator shell:

9 4 2.2.4.1 Obtain, approximately every 15 minutes, the effluent release date from the RM-ll Operator.

4 i

2.2.4.2 Perform, as requested by the Dose Assessment

f. Team Leader, EP-325 for input to the RMMS b

1 dose model.

j 2.2.4.3 Select and calculate, as directed by the

Dose Assessment Team Leader, isotopic j

breakdowns of the source term for input to the RMMS dose model.

2.2.4.4 Note on the dose model output cover sheet, the time of the calculations and assumptions used.

2.2.4.5 Update dose trending sheets as required.

0 - . . - -

s

,- - -- . ~ . . , - - : ..- ....:.=  :..w. w a..zxc s .. c. .

EP-315 Rav. 4 Page 8 of 13

, MAC/ nip

! 2.2.4.6 Review Dose Model Results for key

! information. Immediately, inform the Dose

}

Assessment Team Leader if dose model results j indicate PAG l'evels may be met or exceeded.

2.2.4.7 Update the status board keepers with the requested information.

2.2.5 The RM-21A Operator shall:

2.2.5.1 Log onto the RM-21A system using the

, appropriate user name and password. .

2.2.5.2 Obtain meteorological data for the period of l interest by selecting the following options:

f 1. 94 - Meteorological Data Collection and l, Processing

2. #3 - Meteorological Data Processing t
3. #3 - Review Current Averages -or- $4 Meteorological Data Averages, if the

, evaluation is to be done with historical data.

RESPOND TO ALL PROMPTS AND GENERATE A HARDCOPY.

2.2.5.3 Return to the primary menu and repeat steps 2.1.8 through 2.1.10.7.

l GENERATE HARDCOPIES OF ALL SCREENS T

2.2.5.4 Review the Site Boundary Emergency Action Level Display for the current action level, generate a hardcopy and inform the Dose Assessment Team Leader of the action level.

2.2.5.5 For a current action level of unusual event or greater, generate a hardcopy of the following, unless otherwise directed by the l Dose Assessment Team Leader.

i

1. (X/Q) Display
2. skin isopleth
3. gamma isopleth 1
4. inhalation thyroid isopleth j
5. projected dose summary 1

l

$. is . _ . -.--- . .

w .

w -

l EP-315 Rev. 4

  • l Page 9 of 13 r

MAC/ nip

6. summary report 2.2.5.6 Repeat steps 2.2.5.3 through 2.2.5.5 where any following condition is observed, unless otherwise directed by the Dose Assessment Team Leader.
1. meteorology changes significantly
2. new isotopic data is made availabis
3. An upward trend is observed on any .

effluent channel

4. An EAL value is met or exceeded
5. As directed by the Dese Assessment Team Leader 2.3 Dose Assessment Turnover From the TSC to the EOF 2.3.1 Upon activation of the EOF, the Dose k Assessment Team Leader in the EOF shall contac Assessment Team Leader in the TSC nd request:
1. the information in steps 2.2.1.1 through 2.2.1.11 l _ . . , ,
2. ground and elevated sigma-theta

.y; '

l 3. ground and elevated delta temperature l i-I '

4. stability class

, ajf,, 5. basis for Noble gas and Iodine Source' term f

6. Field Survey Team information: # teams available, # teams dispatched, time j

,d _ m.

teams dispatched, location and results l C'%3 .3.2 The RM-21A Operator shall activate the RM-21

, ,, , e computer as follows:

i  ?

f.,

l. Lift phone receiver from cradle and pull the left switch hook into a full (TP0"_. , '

upward position.

i "1

.,,- 2. When a d 1 tone is present

" One ring followed y a tone shou heard.

9 g ag g,,. 4

  • B *
  • s ee. w pese . Oe pp .
    • W e e e e O em ee e N

.. .w.=- n. . ..

( "

r'

{ .

~

t EP-315 Rev. 4

[) * '

Page 10 of 13

{e , MAC/nlp i

[s

3. Press the switch hook down to the first notch. This engages the RM-21A r

terminal (Textronics 4014) to the VAX l Computer.

("

4. Log onto the RM-21A system using the I

appropriate user name and password.

r, 0 l 2.3.3 All functions and responsibilities described in step 2.2 are applicable.

b 1

j 3.0 ACTIONS FOLLOW-UP I

None i

l

! 4.0 APPENDICES

! 4.1 EP-315-2 Data-Logger /RMMS Cross Reference 4

4.2 EP-315-1 Isotopic Abundance (LGS FSAR Table 15.6-14) l 5.0 SUPPORTING INFORMATION 5.1 Purpose

! The purpose of this procedure is to provide guidelines to calculate offsite doses during a potential or actual radiological emergency.

j 5.2 Criteria for Use 5.2.1 This procedure is used to evaluate offsite i

I doses when the effluent stream (potentially) exceeds the limits set forth in.the technical specification. This can be 1

determined by a chemical analysis or an alarm of an effluent monitor on the RM-ll.

l 5.2.2 Implement this procedure for either I simultaneous, VALID alarms on two common l- (2EIO75 & SIE075) , operating channels or a VALID alarm on a single operating channel l whose mate is inop. (3GE075 VALID alarm and i

6GE075 is inop).

- ,, ;7 _

3 up. . . . . .- .

E e

~

i

' EP-315 Rev. 4 er Page 11 of 13

MAC/ nip l

1 5.2.3 The manual mode of RMMS will allow the operator to bypass the use of real time radiation and meteorological data, enabling him to enter date of his own choosing.

I- 5.2.4 Operation of RMMS in the manual mode is i useful for investigating offsite doses l during Emergency Plan exercises and in the y event that radiation or meteorological data c i are unavailable in the real time mode, k

5.3 Special Equipment '

h 5.3.1 RM-21A consoles and User Guide RM-ll consoles and User Guide 9

5.3.2 5.3.3 EP-315 Guide next to RMMS Console

! 5.4 Re:erences S

5.4.1 LGS FSAR Table 15.6-14 s

l s

1 r

y J

i 1

h e

i

. _ _ , . . . . . . . . . . . . . . . . . . . . . . . . - - - - - . . - - - , - . ~ . - - - - -

. . - - - ~ . . - - - - - - - - ~ - - -

4 + -9 1 ,t e e  %' *

-i EP-315 Rsv. 4 Page 12 of 13

, MAC/nlp 4

APPENDIX EP-315-1 l ISOTOPIC ABUNDANCE (LGS FSAR TABLE 15.6-14)

Abundance at t=2 Hours

-2 Kr-83m 1,41 x 10

-2 Kr-85m 6.64 x 10

-4 Kr-85 4.68 x 10

-2 Kr-87 5.66 x 10

-2 Kr-88 13.6 x 10

-3 Xe-131m 1.82 x 10

-3 Xe-133m 9.49 x 10 '

-2 Xe-133 39.1 x 10

-- 2 Xe-135 32.4 x 10 Sum = 1.0 I-131 . 33 I-133 . 67 Sum = 1.0

    • USE ONLY IF THE REACTOR HAS NOT SCRAMMED.

O _ _ -

NW-'N"*

M n+

Q w - --

-e- - - - - - -n e,- ,,-g -.,--- - - - - - - - --e.,,-. , - - - - , + , ,,-,.._-.-r -

p:_ , y::4 .x5 w : , a +~ . ;- . 4 - m. . -~" - .; w-- r- + - =; ~ - ~.:----  ::;r-

}' D .

c

t. . , .

EP-315 Rev. 4 1 **

Page 13 of 13 "o '

MAC/ nip 1

11 APPENDIX EP-315-2 DATA-LOGGER /RMMS CROSS REFERENCE RMMS Manual Data-Logger Data-Logger Description Channel No. Abbreviation Ground direction 0 WDI

f Ground sigma-theta 0 WDI/DEV

! Ground speed 1 WSI T

Ground delta-temperature 6 DTI Elevated Direction 2 WD2

[ Elevated sigma-theta 2 WD2/DEV

, Elevated speed 3 WS2

Elevated delta temperature 7 DT2 Elevated Ambient temperature 10 TR1

,\

l' i

i i

i i

. . ~ . . . . . . . . .. . - - . . . ~ . .

,.