Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20115A949 + (ML20115A949)
- ML20115A951 + (ML20115A951)
- ML20115A952 + (ML20115A952)
- ML20115A960 + (ML20115A960)
- ML20115A967 + (ML20115A967)
- 1CAN079601, Requests Relief from Requirements of ASME B&PV Code,Sections III & XI Due to Flaws in SW Piping,Iaw 10CFR50.55a & Guidance Provided in GL 90-05 & GL 91-18 + (ML20115A969)
- ML20115A971 + (ML20115A971)
- 1CAN079603, Requests Relief from Section IWA-5213 of ASME Section XI IST Requirements Because 10 Minute Hold Time Could Not Be Reasonably Obtained on Certain Sections of Train a EFW W/O Undue Hardship & Expense + (ML20115A976)
- ML20115A978 + (ML20115A978)
- ML20115A986 + (ML20115A986)
- ML20115A988 + (ML20115A988)
- ML20115A996 + (ML20115A996)
- ML20115B000 + (ML20115B000)
- ML20115B001 + (ML20115B001)
- ML20115B002 + (ML20115B002)
- ML20115B005 + (ML20115B005)
- ML20115B007 + (ML20115B007)
- ST-HL-AE-4228, Responds to Violations Noted in Insp Repts 50-498/92-24 & 50-499/92-24.Corrective Actions:Design Change to Install Isolation/Equalization Valves to Facilitate Calibr & Restoration of Chiller Switches Will Be Completed by 921231 + (ML20115B008)
- ML20115B009 + (ML20115B009)
- ML20115B010 + (ML20115B010)
- ST-HL-AE-5408, Forwards Results for Hot,Full Flow Rod Drop Testing in Unit 1 for Cycle 6,performed on 960518 & Hot Full Flow Rod Drop Testing of New Cycle 7 Core,Performed on 960608,per NRC Bulletin 96-001 + (ML20115B016)
- ML20115B017 + (ML20115B017)
- ML20115B018 + (ML20115B018)
- ML20115B024 + (ML20115B024)
- ML20115B025 + (ML20115B025)
- ML20115B031 + (ML20115B031)
- ML20115B032 + (ML20115B032)
- L-92-286, Monthly Operating Repts for Sept 1992 for St Lucie Units 1 & 2 + (ML20115B037)
- ML20115B039 + (ML20115B039)
- ML20115B042 + (ML20115B042)
- ML20115B057 + (ML20115B057)
- U-602596, Provides Addl Info for Amend to Incorporate Proposed Change to CPS Ts, ,be Reviewed on Schedule Sufficient to Support Sixth Refueling Outage Currently Scheduled to Begin 961013 + (ML20115B069)
- ML20115B073 + (ML20115B073)
- ML20115B088 + (ML20115B088)
- ML20115B094 + (ML20115B094)
- ML20115B096 + (ML20115B096)
- ML20115B098 + (ML20115B098)
- ML20115B102 + (ML20115B102)
- ML20115B105 + (ML20115B105)
- ML20115B106 + (ML20115B106)
- ML20115B110 + (ML20115B110)
- ML20115B113 + (ML20115B113)
- ML20115B118 + (ML20115B118)
- ML20115B124 + (ML20115B124)
- ML20115B128 + (ML20115B128)
- ML20115B142 + (ML20115B142)
- ML20115B144 + (ML20115B144)
- ML20115B153 + (ML20115B153)
- ML20115B158 + (ML20115B158)
- ML20115B166 + (ML20115B166)
- ML20115B177 + (ML20115B177)