Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20114B963 + (ML20114B963)
- NG-92-3983, Forwards Semiannual Effluent Release Rept,Jan-June 1992 for Duane Arnold Energy Ctr,Unit 1 & Rev 2 to Radwaste Handling Procedure 3410-1, Process Control Program for Wet Radwaste + (ML20114B973)
- ML20114B978 + (ML20114B978)
- ML20114B982 + (ML20114B982)
- 05000348/LER-1992-003-01, :on 920728,inadvertent Actuation of motor-driven Afp & RHR Pump 1A Occurred During Augmented Testing.Caused by Incorrect Placement of Jumper,Which Defeated Design Feature.Operator Coached + (ML20114B985)
- 05000413/LER-1992-009-02, :on 920722,turbine Bldg Sump Sys Pipe Rupture Occurred.Caused by Inoperable Turbine Bldg Sump Radiation Monitor.Grab Sample Obtained from Sump & Analyzed & Flow from Temporary Pumps Terminated + (ML20114B986)
- 05000425/LER-1992-012-02, :on 920729,determined That Interval from Previous Quarterly ASME Valve Stroke Time Testing to 920719 Testing Exceeded Allowable Interval.Caused by Procedure Inadequacy.Procedure 00404-C Revised + (ML20114B987)
- ML20114B990 + (ML20114B990)
- ML20114C002 + (ML20114C002)
- ML20114C006 + (ML20114C006)
- ML20114C017 + (ML20114C017)
- ML20114C027 + (ML20114C027)
- SNRC-1987, Forwards Semiannual Radioactive Effluent Release Rept, First & Second Quarters 1992. No Solid Waste Shipped Offsite to Burial Site During Reporting Period.Solid Waste Shipped to Vol Reduction Facilities + (ML20114C031)
- ML20114C035 + (ML20114C035)
- ML20114C045 + (ML20114C045)
- 05000249/LER-1984-023-06, :on 841224,during HPCI Sys Pump Test,Main Pump Bearing Velocity Greater than Procedural Limit.Procedural Limit Found to Be Too Conservative.Inservice Testing Frequency Increased to Monthly + (ML20114C046)
- ML20114C051 + (ML20114C051)
- ML20114C052 + (ML20114C052)
- ML20114C053 + (ML20114C053)
- ML20114C056 + (ML20114C056)
- 05000413/LER-1984-032-01, :on 841219,spot Insp Revealed Seven Inoperable Fire Barrier Penetrations.Probably Caused by Personnel Error in Failing to Reseal Penetrations After Cable Pulling. Penetrations Resealed & Personnel Retrained + (ML20114C060)
- ML20114C061 + (ML20114C061)
- ML20114C080 + (ML20114C080)
- ML20114C081 + (ML20114C081)
- ML20114C082 + (ML20114C082)
- ML20114C088 + (ML20114C088)
- ML20114C090 + (ML20114C090)
- ML20114C091 + (ML20114C091)
- ML20114C092 + (ML20114C092)
- ML20114C095 + (ML20114C095)
- ML20114C098 + (ML20114C098)
- ST-HL-AE-1171, Forwards Responses to Matls Engineering Branch Questions Q251.13N & Q251.14N Re Fracture Toughness Requirements & Fracture Mechanics Analyses,Respectively.Responses Will Be Provided in Later FSAR Amend + (ML20114C101)
- ML20114C102 + (ML20114C102)
- ML20114C108 + (ML20114C108)
- ELV-03979, Semiannual Radioactive Effluent Release Rept for Vogtle Electric Generating Plant,920131 Through 920630 + (ML20114C109)
- ML20114C114 + (ML20114C114)
- ST-HL-AE-4182, Semiannual Radioactive Effluent Release Rept for 920101 Through 920630 + (ML20114C122)
- 05000454/LER-1992-036, :on 920701,DG 1A Load Dropped to Approx 3,000 Kw & Load Starting Fluctuating,Resulting in Generator Reverse Power Trip.Caused by Mispositioning of Contacts 5 & 6.Relay & Potentiometer Replaced + (ML20114C125)
- TXX-9241, Semiannual Radioactive Effluent Release Rept,Jan-June 1992 + (ML20114C127)
- ML20114C130 + (ML20114C130)
- ELV-03956, Requests Extension of Submittal Date for Results of IPE, Per Generic Ltr 88-20 from Sept 1992 Until 921231.Actual Effort to Provided Analyses Consistent W/Gl & NUREG-1335 Resulted in Delays in Completion of Intermediate Milestones + (ML20114C131)
- HL-2380, Special Rept 1-92-001:on 920804,during Monthly Operability Test on Lighting Unit 1R42-E130,light Failed to Illuminate. Caused by Failure of battery-powered Emergency Lighting Unit to Pass Scheduled Surveillance.Subj Unit Replaced + (ML20114C132)
- ML20114C134 + (ML20114C134)
- ML20114C136 + (ML20114C136)
- ML20114C142 + (ML20114C142)
- ML20114C143 + (ML20114C143)
- ELV-03895, Requests That Submittal Date for IPEEE Be Extended Until 950331,per NRC 920622 Request for Util to Reassess Proposed Schedule for Completion of IPEEE Evaluations + (ML20114C144)
- ELV-03986, Special Rept:On 920819,discovered That Voltage Meter Did Not Respond Until 28 After Being Tapped Several Times. Caused by Erratic Meter Indications.Operators Advised of Proper Timing Method & Voltage Meter Replaced + (ML20114C145)
- 2CAN089209, Submits Results of Visual Insp of Pressurizer Surge Lines, Per NRC Bulletin 88-011.Restraint MK-39 Showed Signs of Contact Due to Horizontal Thermal Growth.Damage Assessment Evaluation of Surge Line Performed + (ML20114C158)
- 05000498/LER-1992-008, :on 920731,CVI Actuation Occurred But Radiation Monitors Did Not Indicate Any High Radiation Conditions. Caused by Momentary Variance in Current to Remote Control Unit.Module Cabinets Will Be Repaired + (ML20114C159)
- ML20114C163 + (ML20114C163)