Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20113J153 + (ML20113J153)
- ML20113J172 + (ML20113J172)
- ML20113J177 + (ML20113J177)
- ML20113J179 + (ML20113J179)
- ML20113J183 + (ML20113J183)
- NG-92-3302, Advises That CT Kissman (Operator License OP-30826) No Longer Employed by Util & No Longer Needs Operator License + (ML20113J184)
- ELV-03939, Submits Clarification to Re Rev to Biennial Review of Plant Procedures,Per NRC 920721 Request.Revised, Proposed FSAR Markups,Including Description of How EOPs & Abnormal Procedures Will Be Maintained,Encl + (ML20113J189)
- ELV-03931, Forwards Vogtle Unit 2,Cycle 3 Startup Test Rept. Rept Includes Core Loading Map & Summaries of CRD Time Measurement,Initial Criticality,Control & Shutdown Bank Worth Measurement & RCS Flow Measurement + (ML20113J190)
- ML20113J193 + (ML20113J193)
- ML20113J205 + (ML20113J205)
- ML20113J208 + (ML20113J208)
- ML20114A011 + (ML20114A011)
- JAFP-92-0570, Special Rept:On 920703,CO-2 Fire Door Required to Close on CO-2 Sys Activation Did Not Fully Close When Released.Fire Door Repaired & Tested Satisfactorily + (ML20114A016)
- ML20114A018 + (ML20114A018)
- TXX-4225, Forwards Response to Section III of BNL Interim Rept on Protective Coatings,Per NRC .Commitment Made to Perform Destructive Testing on Coatings as Necessary. Response to Section IV Expected by 840720 + (ML20114A019)
- TXX-4232, Forwards Response to Findings in Section IV of BNL Interim Rept on Protective Coatings,Per NRC .No Safety Concerns W/Protective Coatings at Facility.Backfit Program Properly Conceived & Implemented + (ML20114A025)
- ML20114A026 + (ML20114A026)
- SNRC-1986, Requests Approval of Decommissioning Plan Changes W/Regard to in-core Guide Tubes & Dryer/Separator Guide Rods + (ML20114A027)
- ML20114A033 + (ML20114A033)
- ML20114A045 + (ML20114A045)
- 05000364/LER-1984-016-01, :on 841220,reactor Trip Occurred Due to Manual Tripping of Main Turbine.Caused by Failure of Heater Drain Tank 2A Level Control Sys.Unit Returned to Power Operation + (ML20114A048)
- ML20114A056 + (ML20114A056)
- ML20114A060 + (ML20114A060)
- 05000275/LER-1984-035, :on 841215,turbine Trip & Feedwater Isolation Occurred.Caused by hi-hi Steam Generator Water Level Signal. Steam Generator 1-2 Feedwater Restored & Turbine Relatched + (ML20114A062)
- ML20114A063 + (ML20114A063)
- ML20114A071 + (ML20114A071)
- L-92-182, Forwards Plant Attribute & Data Point Libraries for Turkey Point Units 3 & 4 to Support Implementation by NRC of Erds,Submitted by Ltr + (ML20114A075)
- ML20114A076 + (ML20114A076)
- 05000373/LER-1984-091, :on 841220,train B ammonia-chlorine Alarm Tripped.Caused by Broken Chemcassette Tape.Chemcassette Replaced W/New Tape & Detector Reset + (ML20114A077)
- ML20114A080 + (ML20114A080)
- 05000483/LER-1984-064, :on 841217,reactor Trip Received on Rapidly Decreasing Pressurizer Pressure.Caused by Lifting of PORVs & Fully Opened Pressurizer Spray Valves.Test Procedure Revised & Test Repeated Successfully + (ML20114A091)
- ML20114A094 + (ML20114A094)
- ML20114A096 + (ML20114A096)
- ML20114A102 + (ML20114A102)
- 05000237/LER-1984-025-05, :on 841220,4-kV Main Feed Breaker 152-2430 on Bus 24-1 Failed to Trip Open.Caused by Dirty Auxiliary Breaker Contacts in Trip Control Logic.Contacts Cleaned & Breaker Returned to Svc After Testing + (ML20114A108)
- 05000374/LER-1984-093, :on 841220,reactor Water Cleanup Sys Isolated on High Differential Flow.Caused by Sys Flow Perturbations Combined W/Water Temp,Pressure & Density Differences.Sys Restarted + (ML20114A118)
- 1CAN018501, Confirms 850104 Telcon Re Potentially Fraudulent Records of Inservice Insp During Refueling Outage 1R6.Util Knows of No Discrepancies in First 10-yr Interval of Inservice Insp Program.List of Insps Performed by Contractor Encl + (ML20114A121)
- 05000374/LER-1984-088-01, :on 841228,vacuum Breaker Valve Opened to Equalize Pressure Difference Between Suppression Pool & Drywell.Caused by Operating Hydrogen Recombiner.No Further Action Required + (ML20114A124)
- IR 05000313/1984037 + (ML20114A150)
- ML20114A160 + (ML20114A160)
- ML20114A172 + (ML20114A172)
- RBG-19879, Final Deficiency Rept DR-203 Re Arc Strikes & Weld Spatter on Interior of Four Diesel Starting Airtanks Supplied by Tdi.Air Start Sys Adequate to Perform Safety Function. Condition Not Reportable Under 10CFR50.55(e) + (ML20114A183)
- ML20114A188 + (ML20114A188)
- 05000321/LER-1984-020-01, :on 841216,Group 2 Isolation Occurred for No Apparent Reason.Two Other Group 2 Isolations Occurred on 841219 & 28.Caused by Normal Grid Voltage Swings + (ML20114A190)
- ML20114A192 + (ML20114A192)
- RBG-19888, Final Deficiency Rept DR-168 Re Stainless Steel Welds Repaired W/Filler Metal in Excess of 1/16-inch Diameter.Item Not Reportable Per 10CFR50.55(e) + (ML20114A198)
- RBG-19880, Final Deficiency Rept DR-75 Re Error in GHOSH-WILSON Computer Program.Initially Reported on 841211.Program Corrected.Hardware Mods Resulting from Reanalysis Listed + (ML20114A199)
- ST-HL-AE-1168, Second Interim Deficiency Rept Re Containment Spray Ph Levels That Exceed Equipment Qualification Limits.Initially Reported on 840821.Spray Additive Tanks Will Be Isolated. Next Rept by 850422 + (ML20114A202)
- ML20114A214 + (ML20114A214)
- ML20114A256 + (ML20114A256)
- 05000395/LER-1984-048, :on 841217,w/plant in Mode 3,unmonitored Liquid Release Occurred.Caused by Improper Valve Lineup.Operations Procedure for Liquid Radwaste Discharge Being Revised to Clarify Valve & Switch Alignment + (ML20114A261)