Clarifies Corrective Action Completion Date Committed to in Re Installation of nonsafety-related Station Battery,In Response to Insp Repts 50-266/90-201 & 50-301/90-201.Installation Will Be Completed by End of 1992
ML20114A018
Person / Time
Site: Point Beach  
Issue date: 07/31/1992
From: Link B
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CON-NRC-92-090, CON-NRC-92-90 VPNPD-92-277, NUDOCS 9208070179
Download: ML20114A018 (2)


Text

__

_~

e Wisconsin Electnc POWER COMPANY 231 W MicNgon, Po tkx 2046 wwcuee # 53201 (414)2202345 d

I VPNPD-92-277 NRC-92-090 4

y July 31, 1992' a

Document Control Desk U.

S.

NUCLEAR REGUL" TORY C0MMISSION Mail Station P1-137 Washington, DC 205E5 i

Gentlemen:

}

l DOCKETS 50-266 AND 50-301 CLARIFICATION OF CORRECTIVE ACTION COJiPLETION DATE i

RESPONSE TO INSPECTION REPORTS 50-266/90-201; 50-301/90-201 l

ELECTRICAL DISTRIBUTION SYSTEM FUNCTIONAL INSPECTION POINT BEACH NUCLEAR PLANT. UNITS 1 AND 2 j

[

Your letter dated June 1, 1990, transmitted Inapection Report j

50-266/90-201; 50-301/90-201 which reported the results of an electrical distribution system functional inspection (EDSFI) at Point Beach Nuclear Plant.

In our letter dated August 3,

1990, we responded to that inspection report and described our planned corrective actions.

The purpose of this letter is to reconcile a discrepancy regarding a corrective action completion date that we committed to in our August 3, 1990, response.

In our August 3, 1990, letter, we committed to install a non-safety-related station battery to allow for the removal of several i

large non-safety-related loads-from the existing station batteries.

On page 3 uf Attachment 1 te our letter, we stated that the installation of the non-safety-related loads would be completed by the end of 1992.

However,-on page 15=of Attachment 2, we stated l

that the installation would'be completed by mid-1992.

We had always intended that this work would be completed by the end of 1992.

Our_present schedule.for completion of the installation of the non-safety-related battery in based on the end of 1992 date.

The completion date listed on page 15 of Attachment 2 to-our letter should have been "by the end of 1992" instead of "by mid-1992."

?288 Tofc{Mk bli s

f 0

A subsWandHinasin Exw Cmwatim

a f

gr' e

r

'Docement Control Desk July 31, 1992 Page 2 We apologize for this discrepancy and expect that this letter has clarified our corrective action commitment date.

If you have questions regarding this matter, please contact us.

Sincerely,

/

t~

Beb Link Vice President Nuclear Power copies to:

NRC Regional Administrator, Region III NRC Resident Inspector