Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20113A149 + (ML20113A149)
- ML20113A152 + (ML20113A152)
- ML20113A157 + (ML20113A157)
- RBG-43019, Forwards Response to Exercise Weaknesses Noted Insp Rept 50-458/96-07 on 960415-19.Corrective Actions:Results of Exercise Reviewed W/Emergency Response Organization Members & Being Reviewed W/Operations Crews + (ML20113A159)
- ML20113A160 + (ML20113A160)
- ML20113A161 + (ML20113A161)
- ML20113A164 + (ML20113A164)
- ML20113A167 + (ML20113A167)
- 05000282/LER-1996-010, :on 960520,determined That AFW Pumps Not Protected Against Runout for All Accident Conditions.Caused by Original Design of Afws Not Including Runout Protection for AFW Pumps.Procedures Revised + (ML20113A172)
- ML20113A173 + (ML20113A173)
- ML20113A177 + (ML20113A177)
- ML20113A180 + (ML20113A180)
- 05000458/LER-1996-011, :on 960516,personnel Error Resulted in Missed Surveillance & Dry Floor Drain Sump Leakage Detection Monitoring Instrumentation Exceeded TS Allowed Outage Times. Appropriate Disciplinary Actions Taken + (ML20113A191)
- ML20113A209 + (ML20113A209)
- RBG-20621, Forwards Suppl to Rev 4 to Physical Security Plan.Suppl Withheld (Ref 10CFR2.790).Affidavit Encl + (ML20113A214)
- ML20113A233 + (ML20113A233)
- ML20113A234 + (ML20113A234)
- ML20113A237 + (ML20113A237)
- NLS8500058, Forwards Endorsement 66 to Nelia Policy NF-200 + (ML20113A252)
- ML20113A262 + (ML20113A262)
- ML20113A272 + (ML20113A272)
- ML20113A285 + (ML20113A285)
- PY-CEI-NRR-0222, Discusses Review of Reg Guides in FSAR Table 1.8-1 Re Preoperational Testing,Operations,Operational QA, Surveillance & Maint,Per Util .Clarifications to Be Added to FSAR Table 1.8-1 in Future Amend Encl + (ML20113A298)
- LD-85-016, Informs of Transportation Error in 830811 Rev to CESSAR App 5A Re Nozzle Elevation of Pressurizer Safety Valve. Corrected Elevation Will Be Included in Future Amend to CESSAR + (ML20113A302)
- ML20113A305 + (ML20113A305)
- ML20113A306 + (ML20113A306)
- ML20113A311 + (ML20113A311)
- ML20113A312 + (ML20113A312)
- 3F0385-22, Application for Amend to License DPR-72,consisting of Change Request 134,revising Tech Specs Re Operability & Surveillance Requirements for Reactor Trip Breaker Shunt Trip Attachments,Per Generic Ltr 83-28.Fee Paid + (ML20113A313)
- ML20113A319 + (ML20113A319)
- ML20113A320 + (ML20113A320)
- ML20113A321 + (ML20113A321)
- 3F0385-23, Application for Amend to License DPR-72,consisting of Rev 0 to Tech Spec Change Request 133,proposing Requirement for post-accident Sampling Sys & Automated Isotopic Monitoring Sys,Per NUREG-0737,Items II.B.3 & II.F.1.2.Fee Paid + (ML20113A323)
- ML20113A329 + (ML20113A329)
- ML20113A334 + (ML20113A334)
- W3P85-0624, Informs of Intent to Apply Previously Approved QA Program to Transport & Packaging of Radwaste Matls Per 10CFR71.101. Program Accepted Via Sser 6 (NUREG-0787),Chapter 17 + (ML20113A339)
- AECM-85-0106, Forwards Summary of Certificates of Insurance for Nuclear Mutual Ltd Policy C85-026,NELIA Policy NX8420,MAELU Policy NXTA1561 & Nuclear Electric Insurance Ltd Policy X84-047 + (ML20113A340)
- ML20113A341 + (ML20113A341)
- 3F0385-24, Application for Amend to License DPR-72,consisting of Tech Spec Change Request 132,adding Requirement to Include Challenges to Pressurizer PORVs & Safety Valves in Annual Rept.Fee Paid + (ML20113A344)
- AECM-84-004, Forwards Supplementary Response to Generic Ltr 83-28,Item 3.1.3 Re post-maint Testing of Reactor Trip Sys Components. Should Operation Reveal Test Requirement in Tech Specs Which Degrades Safety,Change Will Be Submitted for Approval + (ML20113A347)
- ML20113A349 + (ML20113A349)
- ML20113A364 + (ML20113A364)
- 05000321/LER-1996-009, :on 960526,reactor Feed Pumps Automatically Tripped.Caused by Component Failure.Failed Circuit Board Replaced + (ML20113A372)
- ML20113A376 + (ML20113A376)
- ML20113A379 + (ML20113A379)
- W3P85-0823, Forwards Rev 8 to Emergency Plan,Per 10CFR50.54(q).Summary of Changes in Rev 8 Also Encl + (ML20113A387)
- ML20113A393 + (ML20113A393)
- ML20113A405 + (ML20113A405)
- ML20113A406 + (ML20113A406)
- ML20113A410 + (ML20113A410)
- ML20113A418 + (ML20113A418)