Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20112C301 + (ML20112C301)
- 05000315/LER-1984-032-01, :on 841206-17,hourly Insp of Inoperable Fire Doors Not Performed.Caused by Coordination Problems W/Implementation of Fire Watch Program.Insp Frequency Increased & Use of Log Book Implemented + (ML20112C308)
- ML20112C309 + (ML20112C309)
- 05000315/LER-1984-033, :on 841206,fire Doors 313,343 & 314 Not Declared Inoperable During post-maint Review of Tech Spec. Caused by Personnel Error in Interpreting Procedures. Inspector Reinstructed Re Door Operabilty Requirements + (ML20112C324)
- ML20112C328 + (ML20112C328)
- ML20112C332 + (ML20112C332)
- ML20112C340 + (ML20112C340)
- BECO-84-216, Responds to NRC Re Notice of Deviation.Corrective actions:in-depth ALARA Review of CRD Disassembly/Reassembly Activity Conducted & PNPS Procedure 3.M.4-1.1 Revised + (ML20112C342)
- ML20112C343 + (ML20112C343)
- ML20112C345 + (ML20112C345)
- 05000364/LER-1996-002, :on 960422,discovered Misapplication of TS 4.4.6 Requirements Re F*.Caused by Inadequate Surveillance Test Procedure.Surveillance Test Procedure Will Be Revised + (ML20112C351)
- ML20112C355 + (ML20112C355)
- ML20112C356 + (ML20112C356)
- ML20112C394 + (ML20112C394)
- ML20112C400 + (ML20112C400)
- ML20112C401 + (ML20112C401)
- ML20112C407 + (ML20112C407)
- ML20112C409 + (ML20112C409)
- ML20112C425 + (ML20112C425)
- ML20112C430 + (ML20112C430)
- 05000237/LER-1984-024-05, :on 841207,secondary Containment Momentarily Broken When Turbine Bldg Interlock Door Opened Before Reactor Bldg Interlock Door Fully Closed.Caused by Personnel Exiting Reactor Bldg.Door Functioning Properly + (ML20112C436)
- ML20112C439 + (ML20112C439)
- 05000237/LER-1984-019-06, :on 841206,w/unit in Refuel & Inservice Insp in Progress,Welds Located in Reactor Water Cleanup Sys Identified as Having Rejectable Indications.Repairs Will Be Made by Weld Overlay &/Or Pipe Replacement + (ML20112C446)
- 05000413/LER-1984-029-02, :on 841206,Westinghouse Notified Util of Insp Results Re CRD Mechanism Design.During 841215 Insp of All Unit 1 Drive rods,14 Unacceptable Drive Rods Found.Rods Replaced & Returned to Westinghouse + (ML20112C452)
- ML20112C473 + (ML20112C473)
- ML20112C482 + (ML20112C482)
- 05000321/LER-1984-012, :on 841114,20 & 1206,reactor Protection Sys Logic Actuation Occurred for No Apparent Reason.Caused by Blown Fuse & Lifted Wire.Fuse in Panel 1H11-P610 & Wire Replaced + (ML20112C484)
- ML20112C489 + (ML20112C489)
- PLA-2403, Revises Expected Completion Date for Resolution of NUREG-0737,Item II.F.1 Until 851231 Due to Complexity of Problem + (ML20112C506)
- ML20112C517 + (ML20112C517)
- ML20112C529 + (ML20112C529)
- ML20112C531 + (ML20112C531)
- ML20112C534 + (ML20112C534)
- ML20112C537 + (ML20112C537)
- ML20112C547 + (ML20112C547)
- ML20112C548 + (ML20112C548)
- ML20112C549 + (ML20112C549)
- ML20112C552 + (ML20112C552)
- ML20112C554 + (ML20112C554)
- ML20112C560 + (ML20112C560)
- ML20112C563 + (ML20112C563)
- ML20112C575 + (ML20112C575)
- ML20112C584 + (ML20112C584)
- ML20112C587 + (ML20112C587)
- ML20112C594 + (ML20112C594)
- ML20112C603 + (ML20112C603)
- ML20112C612 + (ML20112C612)
- ML20112C613 + (ML20112C613)
- ML20112C622 + (ML20112C622)
- ML20112C632 + (ML20112C632)
- 2CAN018501, Forwards Arkansas Nuclear One-Unit 2 Gap Insp Plan for Fourth Refueling Outage, Per .Preliminary Results of Exam Will Be Verbally Relayed Prior to Replacing Reactor Vessel Head + (ML20112C640)