Forwards Proprietary Rept of Archaeological Resource Testing on Cultural Property 9 Hk 33 (GP-HK-08) & Vogtle- Effingham-Thalmann Transmission Line,Tentative Resource Treatment Plan. Repts Withheld
ML20112C439
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 01/04/1985
From: Foster D
GEORGIA POWER CO.
To: Adensam E
Office of Nuclear Reactor Regulation
Shared Package
ML19269A864 List:
References
GN-505, NUDOCS 8501110193
Download: ML20112C439 (2)


Text

y oute 2, Bo 29 v!

Waynesboro. Georgia 30830 Telectone 404 554-9961, Ext. 2360 E

/

404 724 8114. Ext. 3360 N'

b zh Georgia Power g

D. O. Foster Vc s de t and Project tre soutr(rn e-ectre system Vogtle Project

4 January 4,1985 3

-2 i

R Director of Nuclear Reactor Regulation Attention: Ms. Elinor G. Adensam, Chief Licensing Branch f4 File: X7T02.6

=

Division of Licensing Log: GN-505 i

U. S. Nuclear Regulatory Commission 7

Washington, D.C. 20555

=

NRC DOCKET NUMBERS 50-424 AND 50-425 J-CONSTRUCTION PERMIT NUMBERS CPPR-108 AND CPPR-109 V0GTLE ELECTRIC GENERATING PLANT - UNITS 1 AND 2 INFORMATION CONCERNING ARCHAEOLOGICAL AND HISTORICAL RESOURCES EXEMPT FROM PUBLIC DISCLOSURE a

Dear Mr. Denton:

=

By g letter of August 3,1984 (File X7T02.6, Log: GN-400), Georgia Power Company provided consultant's reports and Cultural Resource Management Plans (CRM) delineating historical and archaeological properties along certain

-;il transmission line rights-of-way associated with the Yogtle project. As noted in that letter, additional reports and CRM plans were being developed and 5

would be submitted as they became available.

}

Attachnent I are the Consultant's report and submittal letter to the U

Georgia State Historic Preservation Officer for the Wadley-Wallace Dam Section of the Vogtle to Scherer property GP-HK-08 submitted in accordance with the CRM Plan for this transmission line. Attachment II is the CRM Plan and submittal letter to the Georgia State Historic Preservation Officer for the Vogtle to Thalmann transmission line. Attachment III is a revision to Attachment A of the Wadley-Wallace Dam Section of the Vogtle to Scherer i

transmission line CRM Plan. Attachment IV is a letter from the Georgia State i

Historic Preservation Officer providing comments on the CRM Plan for the Wadley-Wallace Dam Section of the Vogtle to Scherer transmission line This l

information is being provided with the understanding that it will not be 4;

subject to public disclosure. Withholding this information from public disclosure is necessary to protect these resources and insure their preservathn. The basis for witholding from public disclosure were stated in j

y letter df August 3,1984.

1 5

\\

a 9%

5 10 i

i---

am'

Director of Nuclear Reactor Regulation January 4,1985 Page 2 Additional reports and CRM plans are being developed for submittal to the State Historic Preservation Officer for the transmission lines associated with the Yogtle Electric Generating Plant Such reports will be submitted to you under the same conditions noted herein as they become available.

If you have any questions concerning the enclosed information please contact us.

Yours very truly, D. O. Foster DOF/WLB/sro Attachments cc:

M. A. Miller R. A. Thomas J. A. Bailey L. T. Gucwa G.. F. Trowbridge, Esquire G. Bockhold, Jr.

J. E. Joiner L. Fcwler l

C. A. Stangler l

~

.