ML20112C309

From kanterella
Jump to navigation Jump to search
Forwards Revised Responses to Questions 430.9,430.11 & 430.35,in Response to 850305 Request for Supplemental Info. Info Will Be Included in Next FSAR Amend Scheduled for 850410
ML20112C309
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 03/15/1985
From: Bailey J
GEORGIA POWER CO.
To: Adensam E
Office of Nuclear Reactor Regulation
References
GN-558, NUDOCS 8503210379
Download: ML20112C309 (4)


Text

._ _ _ _ _ _ _ _ _ _ _ __ _ _ . _ _ _ __. . _ _ _ . . _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ . . _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _

Georgia Power Company Project Manegement Rout;2 Box 299A Waynesboro. Georgia 30830 Telephone 404 724-8114 404 554-9961 Vogtle Project March 15, 1985 Director of Nuclear Reactor Regulation File: X7BC35 Attention: Ms. Elinor G. Adensam, Chief Log: GN-558 Licensing Branch $4 Division of Licensing U. S. Nuclear Regulatory Commiasion Washington, D.C. 20555 NRC DOCKET NUMBERS 50-424 AND 50-425 CONSTRUCTION PERMIT NUMBERS CPPR-108 AND CPPR-109 VOGTLE ELECTRIC GENERATING PLANT - UNITS 1 AND 2 REQUEST FOR SUPPLEMENTAL INFORMATION REVISED RESPCNSES TO PSB QUESTIONS

Dear Mr. Denton:

Attached for your staff's review are revised responses to question 430.9, 430.11, and'430.35. These revisions are a result of a teleconference with your staff on March 5, 1985 and will be reflected in the next FSAR amendment submittal scheduled for April 10, 1985.

If your staff requires any additional information, please do not hesitate to contact me.

Sincerely, h.

J. A. Bailey Project Licensing Manager JAB /sm Enclosure xc: D. O. Poster L. Fowler l R. A. Thomas M. A. Miller i G. F. Trowbridge, Esquire L. T. Gucwa J. E. Joiner, Esquire G. Bockhold, Jr. ,

C. A. Stangler l i

0066m 8503210379 850315 PDR ADOCK 05000424 A PDR

6

'l VEGP-ESAR-Q O

Question 430.9 In ESAR section 1.9, you state that the design of the fuel oil storage and transfer system conforms to the requirements of Regulatory Guide 1.137, which endorses ANSI N-195.

-< However, there is no reference to testing of fuel oil as discussed in

, Appendix B of ANSI N-195 and position C2 of Regulatory Guide 1.137. Revise your ESAR to include a discussion of your conformance to these requirements.

O Response VEGP conformance to Regulatory Guide 1.137 is addressed in subsection 1.9.137. VEGP does not conform to the requirements of ANST N195-1976. Annandiv R fg :The t : ting requircm:nt; cf ANC!-

u1o5_1979 engereer 3373 9337q 3;;;u : er p : : rr;;;tien

-betueen thir teet 2nd fuel suitability in eterage, VECF har 13

-cubetituted the requirements of ACTM O2275 for thcoc of ACTM

'02271. The testing requirements for the diesel generator fuel oil will be specified in the Technical Specifications, which are scheduled to be submitted to the Nuclear Regulatory Commission

.by June 1985.

The VEGP' fuel oil. surveillance program will, however, follow g

- a program.such as the one- that was approved for the McGuire -

Nuclear Station.

- ~ . . . . - _ _ _ - _ . . - -_. .- _. _ - ___-__._.

O .

O r

=/ Amend. 7 5/84 Amend. 8 7/84 Amend. 9 8/84 Q430.9-1 Amend. 13 1/85

VEGP-ESAR-Q Question 430.11 Describe your design provisions made to protect the fuel oil s torage tank fill line from damage by tornado missiles.

Response

The 4-in. fill line for the fuel oil storage tank extends approximately 5 in. from the outside wall surface of the valve O house and is approximately 48 in. above grade.

tornado missile protection for the fill line.

There is no In the unlikely event that the fill line outside the valve house is damaged, the storage tank can be filled by opening the manway cover on the storage tank which is located in the missile-protected pump house. Since damage of the storage tank fill line does not preclude the addition of fuel oil into the storage tank via alternate means, there is no tornado missile protection for the fill lines.

The manway or manhole is shown in figure 9.5.4-1 of the FSAR. 13 The 24-in. diameter manway has a gasketed steel plate cover bolted to the manway flanged opening. A davit is furnished with

() the fuel oil storage tank and is attached to the manway cover for ease of opening and closing of the cover. The manway can be removed by two people. The manway is located on top of the storage tank inside the diesel fuel oil transfer pump room which is easily accessible through the valve room located between the train A and train B pump rooms. Entrance to the-valve room is through a doorway located at grade elevation. Figure 430.11-1

-is a.. plan. and_. sectional _ views ~of the .dieseLfueL oil _ storage.___ _

tank pump house.

The manway is readily accessible and can be removed by two

. people. The diesel generator system operating procedure will outline the steps necessary to fill,the storage tank using the ,

manway.

C:/

In the case of prolonged diesel generator operation, VEGP will make provisions by the 5th. day of diesel operation for delivery

, of fuel oil to the plant site. With a required seven day fuel (br oil supply maintained on site and by making-delivery provisions Ci. by day 5, an adequate supply of fuel oil for the emergency diesel generator is assured.

- g Amend. 7 5/84 Q430.11-1 Amend. 13 1/85

VEGP-FSAR-Q E. e an. adequate amount of lube oi vailable on s eorgia Power will maintain an onsite supply complete lube oil change for one emergenc .g is lube oil will. 13 ~

be stored onsite warehouse. e will . .

be around the clock and the-operations pervisor on shift will have- a key.

~

E.. To ensure an adequate amount of lube oil is available on. short notice, Georgia Power Company will maintain an onsite supply-to, accommodate a complete lube oil ,

change for one emergency diesel generators (approximately i I

1500 gallons) . This lube oil will be stored in the ,

onsite warehouse. {

In addition. to the above, an amount of 288 gallons of 14 i'

lube-oil will also.be stored onsite. This amount is based on'the assumption that lube oil consumptions is -

144 gallons for 7 days per diesel generator. ~1he warehouse will be manned around the clock and the.