Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20108C404 + (ML20108C404)
- 05000370/LER-1985-001-02, :on 850123,nuclear Svc Water Sys Valve 2RN-158 Found W/O Lock & Chain Installed.Caused by Personnel Error. Procedures Will Be Reviewed & Revised,If Necessary,To Reflect Proper Locked Valve Requirements + (ML20108C408)
- ML20108C410 + (ML20108C410)
- 05000483/LER-1996-001, :on 960402,licensed Operators Initiated Manual Reactor Trip After Failed Fuse Caused Closure of B Feedwater Isolation Valve.Caused by Mechanical Failure of Thermal Link Inside Fuse.Fuses Replaced + (ML20108C423)
- ML20108C434 + (ML20108C434)
- ML20108C450 + (ML20108C450)
- PLA-4455, Forwards Change Jj to Physical Security Plan.Encl Withheld + (ML20108C460)
- ML20108C470 + (ML20108C470)
- 05000293/LER-1996-003, :on 960403,RCICS Made Inoperable Due to Anomalies Noted During Testing.Caused by Malfunctioning Speed Control Sys Hydraulic Actuator (EG-R).EG-R Replaced & Rcics Declared Operable on 960405 + (ML20108C472)
- RBG-20228, Interim Deficiency Rept DR-217 Re Failure of Bolting Matl Supplied by Cardinal Industrial Products,Inc.Initially Reported on 850123.Bolting Not Installed Returned to Vendor. Investigation Continuing.Next Rept Expected by 850328 + (ML20108C489)
- ML20108C507 + (ML20108C507)
- ML20108C528 + (ML20108C528)
- 3F0496-33, Informs of Errors in Info Provided to NRC in App B to Facility Four Yr Simulator Certification Rept Submitted by Util + (ML20108C534)
- ML20108C537 + (ML20108C537)
- 05000361/LER-1984-060, :on 841002,inflatable Seals Between Spent Fuel Storage Pool & Spent Fuel Shipping Container Pit Partially Deflated.Caused by Low Svc Air Pressure.Design Change Will Be Installed & Procedures Will Be Revised + (ML20108C539)
- TXX-4349, Interim Deficiency Rept SDAR-157 Re Defective Architectural Wall Located Above Control Room.Wall Being Removed.Seismic Design Const & Insp Activities for New Separation Wall Scheduled for Completion by 841215 + (ML20108C541)
- ML20108C545 + (ML20108C545)
- 3F0596-01, Forwards Rev 0 of F96-0001, FPC Crystal River Unit 3 Cycle 11 Colr,Referencing Revised Sts. Facility in Final Stages of Refuel 10 & Operating Limits in COLR Will Govern Core Operations at Restart + (ML20108C550)
- TXX-4351, Final Deficiency Rept SDAR-146 Re Design of Primary Coolant & Component Cooling Water Sys.Initially Reported on 840824. Item Not Reportable Under 10CFR50.55(e) + (ML20108C563)
- ML20108C565 + (ML20108C565)
- TXX-4350, Interim Deficiency Rept SDAR-154 Re Safe Shutdown Analysis Evaluations Which Did Not Consider Effects of Potential Fire on Control Room Hvac.All Essential Cables & Components Afforded Protection,Per 10CFR50,App R,Section III.G.2.c + (ML20108C566)
- AECM-84-0456, Final Deficiency & Part 21 Rept PRD-84/08 Re Failure of Wj Woolley Co to Seismically Qualify Personnel Air Locks Pneumatic Supply Sys.Nrc Should Consider Reevaluation of Failure of Potential Generic Effects of Other Plants + (ML20108C567)
- ML20108C570 + (ML20108C570)
- 3F0496-39, Forwards Radioactive Effluent Release Rept 1995 FPC Crystal River - Unit 3. Rept Includes Summary of Quantities of Radioactive Liquid & Gaseous Effluents & Solid Waste Released from Facility.No Revs Made to ODCM or PCP + (ML20108C577)
- ML20108C582 + (ML20108C582)
- ML20108C585 + (ML20108C585)
- ML20108C591 + (ML20108C591)
- NSD-NRC-96-4698, Forwards Nonproprietary & Proprietary Westinghouse Responses to NRC RAI on AP600 Design Certification Program.Proprietary Response Withheld Per 10CFR9.17(a)(4) + (ML20108C592)
- ML20108C605 + (ML20108C605)
- ML20108C613 + (ML20108C613)
- ML20108C614 + (ML20108C614)
- ML20108C616 + (ML20108C616)
- ML20108C619 + (ML20108C619)
- ML20108C625 + (ML20108C625)
- ML20108C630 + (ML20108C630)
- ML20108C634 + (ML20108C634)
- 05000331/LER-1985-002, :on 850128,HPCI Declared Inoperable Due to Failure of Turbine Stop Valve to Open During Monthly Surveillance Test.Caused by Pilot Oil Trip Solenoid Valve Being Stuck in Open Position.Valve Replaced + (ML20108C645)
- NRC-96-0032, 1995 Annual Financial Rept for Detroit Edison Co + (ML20108C656)
- W3P85-0544, Supplemental Final Significant Const Deficiency 93 Re Failure of Containment Isolation Valve CVC-103 to Close After Plant Cooldown.Details Will Be Provided on Valve Failure When Info Obtained + (ML20108C658)
- ML20108C669 + (ML20108C669)
- ML20108C671 + (ML20108C671)
- 3F0496-13, Forwards Annual Financial Rept for 1995 & Annual Financial Repts for Ten Participating Owners of Crystal River 3 + (ML20108C681)
- ML20108C685 + (ML20108C685)
- ML20108C689 + (ML20108C689)
- RBG-20199, Interim Deficiency Rept DR-157 Re ASME Stock Fittings W/Painted Exteriors & Interiors.Interim or Final Status Rept Will Be Submitted by 850329 + (ML20108C695)
- ML20108C699 + (ML20108C699)
- ML20108C703 + (ML20108C703)
- LD-96-009, Part 21 Rept Re Potential Instrumentation Decalibr at Low Power.Affected Utils Should Ensure That Log Power Channels Properly Calibr & cross-correlated to Linear Power Channels at 100% Reactor Power + (ML20108C709)
- ML20108C712 + (ML20108C712)
- TXX-4421, Interim Deficiency Rept SDAR-165 Re Containment Spray Header Isolation Valves Opening in Less than 20 S.Initially Reported on 850123.Completion of Evaluation Anticipated by 850313 + (ML20108C714)
- ML20108C717 + (ML20108C717)