ML20108C605
| ML20108C605 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 04/30/1996 |
| From: | Bonker L TOLEDO EDISON CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20108C609 | List: |
| References | |
| GD-96-0059, GD-96-59, NUDOCS 9605070049 | |
| Download: ML20108C605 (1) | |
Text
.
d TOLEDO EDISON A Centerior Energy Company EDISON PLAZA E
I 1
i l
April 30,1996 GD 96-0059 RP 1.7.13 Docket Number 50-346 License Number NPF-3 Serial Number 2291 l
United States Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 i
Subject:
Combined AREOR and RERR Gentlemen:
Enclosed are replacement pages 128 through 137 of the Davis-Besse Nuclear Power Station 1995 Annual Radiological Environmental Operating Report including the Radiological Effluent Release Report. These replacement pages correct an inadvertent error in which Figure 35, Wind Rose Monthly Average for 100M and 10M were interchanged.
I Should you have any questions or require additional information, please contact me at (419) 321-7310.
l Very truly yours, g
JU L
l Lawrence A.Bonker Supervisor-ALARA Services KCC:kmb Enclosures 9605070049 960430 PDR ADOCK 05000346 i
R PDR 060 W 0