Second Interim Deficiency Rept Re Conduit Support Stiffener Plates Not Installed Per Design Drawing.Initially Reported on 840604.Util Still Investigating Assignable Cause & Extent of Deficiencies.Next Rept by 850130
ML20108C614
Person / Time
Site: Bellefonte Tennessee Valley Authority icon.png
Issue date: 09/24/1984
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 8411190005
Download: ML20108C614 (2)


Text

,

7-3:

+

~

--; e

...?.~.+

('~

1 y-w.

TENNESSEE VALLEYdUTHORIT CHATTANOOGA. TENNESSEE 374ot 4

^

.400 Chestnut Street Tower II

,34 SEP 20 Dit }*r 2411984 9

S BLRD-50 -438/84-34 u

- U.S. Nuclear Regulatory Commission

. Region II Attn:-

Mr.' James P.'0'Reilly,; Regional Administrator-

~101.Marietta Street, NW,' Suite-2900;

' Atlanta, Georgia :30323-o s

~

Dear Mr. O'Reilly:

\\

.z.

BELLEFONTE NUCLEAR PLANT UNIT,1 - CONDUIT SUPPORT STIFFENER PLATES NOT-INSTALLED PER DRAWING BLRD-50-438/84-34;'J-SECOND INTERIM REPORT

^

~

The -subject deficiency was initially. reported 'to.NRC-0IE Inspector.

P. E. Fredricks'on on May.10,1984 'in accordance with 110l CFR 50.55(e) as NCR:

-3069.>Thisiwas 'followed by. our interim report dated June 4,1984..Since

~

' that. time', NCR 3457,, which documents: a similar condition, ;has also been :-

initiated.l:TVA intends to report _on both NCRs simultaneously. Enclosed is

our second interim report. ?We expect to. submit' our next report by January 30,;1985..

~

If you have'any questions, please get in touch with R. H. Shell at

FTS 858-2688.-

i Very truly yours,

-TENNESSEE VALLEY AUTHORITY D S be hL.M. Mills, Manager i

Nuclear Licensing Enclosure cc:

Mr. Richard C. DeYoung, Director (Enclosure)

Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission

- Washington,.D.C. 20555

- Records Center (Enclosure)

Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 8411190005 840924

['

i L..

PDR ADOCK 05000438 OFFICTAL COPY S

~

PDR n

' An EquM Opportunity Employer 6 k il

a.

ENCLOSURE 3 ;,.

BELLEFONTE NUCLEAR PLANT UNIT 1 CONDUIT. SUPPORT STIFFENER PLATES NOT INSTALLED PER DRAWING

.BLRD-50-438/84-34 NCRs 3069 AND 3457-10 CFR 50.55(e)-

SECOND INTERIM REPORT Description of Deficiency During a quality control audit, it was identified Lthat two stiffener plates.

for support FF-768-6, Mark No. 31, were installed approximately 2 inches from the proper location as shown on TVA design drawing 4RA0560-X2-32 R3 The support is a seismic category I support for electrical _ conduit carrying safety-related cables. It'is located inside the unit 1 Reactor Building.

TVA has subsequently identified another unit 1 Reactor Building conduit support (768-36/31/5, also shown on drawing series 4RA0560-X2-31-Rh) which is missing the required stiffener plates. This additional deficiency has been documented on NCR 3457.

Interim Progress TVA's Office of Engineering (OE) has evaluated the configuration of support FF-768-6, Mark No. 31, and has determined that the support'is acceptable for use-as-is. Support 768-36/31/5 will also be referred to OE for evaluation and disposition. TVA is still investigating the assignable cause and extent of the subject deficiencies.