Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20106B229 + (ML20106B229)
- ML20106B244 + (ML20106B244)
- ML20106B263 + (ML20106B263)
- ML20106B273 + (ML20106B273)
- BVY-92-116, Responds to NRC Re Potential Areas of Improvement Noted in Insp Rept 50-271/92-14 on 920629-0702.Corrective Actions:Emergency Plan Classification & Action Level Scheme (Procedure AP-3125) Will Be Revised by Jan 1993 + (ML20106B285)
- ML20106B289 + (ML20106B289)
- 05000369/LER-1985-001, :on 841229,daily Health Physics Surveillance of Waste Gas Decay Tank Not Completed within 24 H Interval. Caused by Personnel Error.Use of Duties Checklist Required & Documentation of Duties Will Be Reviewed + (ML20106B296)
- ML20106B297 + (ML20106B297)
- ML20106B299 + (ML20106B299)
- ML20106B310 + (ML20106B310)
- ML20106B316 + (ML20106B316)
- ML20106B329 + (ML20106B329)
- ML20106B347 + (ML20106B347)
- 05000413/LER-1985-001, :on 850104,during Testing of Turbine Impulse Chamber Pressure,Motor Driven Auxiliary Feedwater Pumps 1A & 1B auto-started,initiating Reactor Trip Signal.Caused by Personnel Error.Procedure Reviewed + (ML20106B351)
- 05000454/LER-1985-006, :on 850106 & 10,while Venting Containment to Reduce Internal Pressure,Both Containment Mini Purge Supply & Exhaust Lines Opened in Violation of Tech Specs.Caused by Use of Wrong Procedure + (ML20106B375)
- ML20106B376 + (ML20106B376)
- 05000296/LER-1985-001, :on 850104,during Normal Operation,Employee Accidentally Caused RCIC Sys to Be Inoperable for Approx 2 Minutes.All Other Required Core Standby Cooling Sys Fully Operable + (ML20106B394)
- RBG-19159, Interim Deficiency Rept DR-193 Re ECCS Section Line in Auxiliary Bldg.Next Rept Expected by 841204 + (ML20106B406)
- ML20106B410 + (ML20106B410)
- 05000364/LER-1984-010-01, :on 840915,steam Generator 2A Steam Flow Channel F1-475 Not Tripped Until 4 H After Channel Declared Inoperable.Caused by Personnel Error.Transmitter Equalizing Valve Closed + (ML20106B412)
- RBG-19158, Interim Deficiency Rept DR-205 Re Lugs on Motor Leads of Motor Operated Valves Supplied by Limitorque.Next Rept Expected by 841120 + (ML20106B414)
- ML20106B420 + (ML20106B420)
- ML20106B421 + (ML20106B421)
- 05000275/LER-1985-004, :on 850104,30-day Special Rept Submittal Period Exceeded.On 841128,public Address Sys Cable Installation Led to Inoperability of Two Fire Barriers.On 850108,unsealed Penetrations Discovered + (ML20106B426)
- RBG-19157, Interim Deficiency Rept DR-190 Re Four Fill Pumps for LPCS, Hpcs,Rhr & RCIC Sys Supplied by Gould Pumps,Inc.Next Rept Expected by 841127 + (ML20106B427)
- ML20106B433 + (ML20106B433)
- ML20106B444 + (ML20106B444)
- 05000454/LER-1985-008, :on 850104,reactor Trip & Auxiliary Feedwater Actuation Occurred Due to Steam Generator lo-lo Alarm. Operators Inadvertently Allowed Level to Drop in Steam Generator While Engaged in Shift Turnover + (ML20106B460)
- ML20106B466 + (ML20106B466)
- ML20106B479 + (ML20106B479)
- ML20106B482 + (ML20106B482)
- RBG-19156, Interim Deficiency Rept DR-175 Re HPCS Diesel Batteries Supplied by Ge.Next Rept Expected by 841220 + (ML20106B488)
- RBG-19155, Interim Deficiency Rept DR-174 Re Skewed Joint Fillet Welds Supplied by Reactor Controls,Inc.Next Rept Expected by 841219 + (ML20106B494)
- ML20106B499 + (ML20106B499)
- AECM-84-0478, Updated Special Rept 84-012/2:on 840201,during Special Fire Door Insp,Discovered Door mods,door-to-frame Gaps in Excess of Specified Tolerances & Ul Labels Missing from Doors. Design Change Issued + (ML20106B501)
- ML20106B502 + (ML20106B502)
- 05000261/LER-1985-001-02, :on 850104,weekly Surveillance Test Conducted on Diesel Fire Pump Batteries Not Completed within Allowed Interval.Caused by Personnel Error.Technicians Notified of New Surveillance Schedule + (ML20106B527)
- ML20106B531 + (ML20106B531)
- 05000281/LER-1985-001-02, :on 850106,auxiliary Feed Pump Operated During Monthly Reactor Protection Logic Test,Contrary to Planned Evolution.Caused by Failure to Perform Test in Proper Sequence + (ML20106B532)
- ML20106B533 + (ML20106B533)
- RBG-19148, Interim Deficiency Rept DR-137 Re Lubricant in Two Fuel Pool Cooling Pumps & Motors.Next Rept Expected by 841212 + (ML20106B535)
- ML20106B540 + (ML20106B540)
- 05000382/LER-1992-009-01, :on 920827,broad-range Gas Detection Sys Channel Calibrs Not Performed within TS 4.3.3.7.3 Required Periodicity.Caused by Inadequate Administrative Control. Channel Calibrs Successfully Performed + (ML20106B543)
- ML20106B569 + (ML20106B569)
- ML20106B571 + (ML20106B571)
- RBG-20001, Final Deficiency Rept DR-206 Re Improper Lubricant in Two Final Pool Cooling Pumps & Motors.Initially Reported on 841228.Motors Disassembled,Cleaned & Repacked + (ML20106B573)
- ML20106B574 + (ML20106B574)
- ML20106B575 + (ML20106B575)
- 05000352/LER-1985-002, :on 850104,spurious Isolation of Reactor Water Cleanup Sys Occurred.Caused by High Differential Flow Between Sys Inlet & Outlet While Valving Filter/ Demineralizer B Into Svc.Isolation Reset + (ML20106B576)
- ML20106B579 + (ML20106B579)
- ML20106B593 + (ML20106B593)