RO 370/84-26:due to Extended Lead Times for Procurement Valves in Auxiliary Feedwater Sys Will Not Be Replaced Until 1986 Refueling Outage
ML20106B571
Person / Time
Site: Mcguire
Issue date: 02/01/1985
From: Tucker H
DUKE POWER CO.
To:
NRC OFFICE OF ADMINISTRATION (ADM)
References
RO-370-84-26, NUDOCS 8502110678
Download: ML20106B571 (1)


Text

,

DUKE POWER GOMPAhT P.O. HOX 33180 CHARIMFTE, N.C. 28242 HALH. TUCKER TELEPHONE W303 PeastDENT (704) 37MS38 February 1, 1985 Document Control Desk U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Subject:

McGuire Nuclear Station, Unit 2 Docket No. 50-370 i

LER 370/84-26 Gentlemen:

The subject Licensee Event Report, dated October 26, 1984 stated that check valves in the Auxiliary Feedwater (CA) system at McGuire would be replaced during the upcoming refueling outages in 1985, for each unit. Due to extended lead times for procurement of these valves, replacement will not be possible until the 1986 refueling. Other corrective actions outlined in the LER have been or will be performed as stated in the LER.

Very truly yours, C M /h Hal B. Tucker SAG /mjf

/.tte:c' <nt cc:

Mr. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission Region II i

101 Mnrietta Street, NW, Suite 2900 1

Atlanta, Georgia 30323 Mr. W. T. Orders NRC Resident Inspector McGuire Nuclear Station 4

8502110678 850201 gDRADOCK 05000370 PDR 0