Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20106A956 + (ML20106A956)
- ML20106A965 + (ML20106A965)
- ML20106A973 + (ML20106A973)
- ML20106A984 + (ML20106A984)
- ML20106A987 + (ML20106A987)
- HL-2925, Forwards Response to NRC Re Violations Noted in Insp Repts 50-321/92-18 & 50-366/92-18.Corrective Actions: Temporary Mod 2-92-61 Written to Electrically Bypass Temp Switch 2U61-N110B & Valve 1G41-F041 Repacked + (ML20106A989)
- ML20106A990 + (ML20106A990)
- BVY-92-115, Responds to NRC Bulletin 92-001 Supplement 1 Failure of Thermo-Lag Fire Barrier Sys to Maintain Cabling in Wide Cable Trays & Small Conduits Free from Fire Damage. Temporary Fire Detection Installed + (ML20106A991)
- ML20106A992 + (ML20106A992)
- ML20106A994 + (ML20106A994)
- HL-2923, Forwards Response to GL 92-04, Resolution of Issues Re Reactor Vessel Water Level Instrumentation in BWRs Per 10CFR50.54(f). Walkdown Performed on Instrument Panels & Ref Leg Tubing.No Visible Leakage Indentified + (ML20106A995)
- ST-HL-AE-4050, Application for Amend to License NPF-76,proposing one-time Amend to TS 4.3.4.2 to Extend 40-month Insp Interval for Turbine Valves to Approx 52 Months + (ML20106A996)
- ML20106B006 + (ML20106B006)
- ML20106B018 + (ML20106B018)
- JPN-92-052, Forwards Rev 1 to Ja Fitzpatrick Nuclear Power Plant Colr. Rept Covers Reload 10/Cycle 11 & Contains Operating Limits Applicable to Next Operating Cycle + (ML20106B019)
- ML20106B024 + (ML20106B024)
- 05000352/LER-1985-003-01, :on 850105,nuclear Steam Supply Shutoff Isolation Signal Resulted in Isolation of Reactor Water Cleanup Outboard Valve.Caused by Inadvertent High Differential Flow Signal + (ML20106B027)
- B14247, Responds to Concerns Raised in SG Replacement Project Insp 50-336/92-26 During Wk of 920831 & at 920904 Exit Meeting. RCS Pipe Cutting Chronology & Pipe Stress Analysis Action Plan Encl + (ML20106B028)
- ML20106B032 + (ML20106B032)
- NRC-92-0115, Forwards Response to GL 92-04, Resolution of Issues Related to Reactor Vessel Water Level Instrumentation in Bwrs + (ML20106B035)
- ML20106B040 + (ML20106B040)
- ML20106B041 + (ML20106B041)
- RBG-20010, Final Deficiency Rept DR-208 Re Pipe Support Clamp Supplied by Bergen Paterson Nonconformance & Disposition Rept 5835 Issued to Install Two 1/16-inch Thick Washers on Part. Condition Not Reportable Per 10CFR50.55(e) + (ML20106B043)
- ML20106B047 + (ML20106B047)
- ML20106B052 + (ML20106B052)
- ML20106B076 + (ML20106B076)
- ML20106B086 + (ML20106B086)
- ML20106B091 + (ML20106B091)
- ML20106B099 + (ML20106B099)
- ML20106B100 + (ML20106B100)
- ML20106B102 + (ML20106B102)
- ML20106B103 + (ML20106B103)
- ML20106B104 + (ML20106B104)
- ML20106B118 + (ML20106B118)
- ML20106B135 + (ML20106B135)
- ML20106B141 + (ML20106B141)
- ML20106B144 + (ML20106B144)
- ML20106B160 + (ML20106B160)
- ML20106B162 + (ML20106B162)
- ML20106B167 + (ML20106B167)
- 05000397/LER-1984-072, :on 840705,06,31,0808,10 & 0918,reactor Water Cleanup Sys Solutions Occurred Due to Erroneous High Delta Flow Trips.Caused by Inadequate Response of Reactor Vessel Transmitter.Transmitter Replaced + (ML20106B170)
- ML20106B175 + (ML20106B175)
- ML20106B176 + (ML20106B176)
- ML20106B188 + (ML20106B188)
- 05000280/LER-1985-002-01, :on 850113,lo-lo Level in Steam Generator B Caused Reactor Scram.Caused by Failure of Personnel to Adequately Control Steam Generator Level.Feedwater Bypass Flow Indication Design Installed + (ML20106B190)
- 3F0992-18, Special Rept 92-003:on 920815,auxiliary Bldg high-range Noble Gas Monitor Failed Calibr & Declared Inoperable for More than 7 Days.Automatic Isotopic Monitoring Sys Available for Use.Amplifier Components & detector-sensor Replaced + (ML20106B219)
- ML20106B229 + (ML20106B229)
- ML20106B244 + (ML20106B244)
- ML20106B263 + (ML20106B263)
- ML20106B273 + (ML20106B273)
- BVY-92-116, Responds to NRC Re Potential Areas of Improvement Noted in Insp Rept 50-271/92-14 on 920629-0702.Corrective Actions:Emergency Plan Classification & Action Level Scheme (Procedure AP-3125) Will Be Revised by Jan 1993 + (ML20106B285)