ML20106B176

From kanterella
Jump to navigation Jump to search
Comments on Review of Des.Old River Control Project Correct Terminology.Completion Date of Auxiliary Structure Corrected to 1986.Info on Geology & Seismicity of Area Lacking
ML20106B176
Person / Time
Site: River Bend Entergy icon.png
Issue date: 10/10/1984
From: Witherspoon E
ARMY, DEPT. OF, CORPS OF ENGINEERS
To: Schwencer A
Office of Nuclear Reactor Regulation
References
NUDOCS 8410230021
Download: ML20106B176 (1)


Text

.

DEPARTMENT OF THE ARMY NEW ORLEANS DesTRN:7. CORPS OF ENGeNEERS P.O. eOx soas?

NEW ORLEANS. LOUIS 4ANA 70 8 SO October 10, 1984 mm.v to ATTENTIOrt or Planning Division Environmental Analysis Branch 7=

Mr. A. Schwencer, Chief Licensing Branch No. 2 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C.

20555

Dear Mr. Schwencer:

We have reviewed your Draft Environmental Statement (DES) - River Bend Station and offer the following comments:

a.

Section 4.3.2.1.1, page 4-12 and Section 5.3.1.1, page 5-2.

Other water supply intakes not listed in the DES are 1scated at Dow Chemical, river mile 210.2; U, S. Public Health Service Hospital at Carville, river mile 191.8; Monochem Industries, river mile 184.9; and Wyandotte Chemical Corporation, river mile 183.8.

b.

Section 5.3.1.3, page 5-3.

This section repeatedly makes reference to the "Old River Control Structure." The correct termi-nology is "Old River Control Project." The completion date of the auxiliary structure is given as 1985. The correct date is 1986.

c.

Information on the geology and seismicity of the area is "i

lacking.

Thank you for the opportunity to comment on this DES.

Sincerely, 1I

'y J

J ugene S. W herspoon Colonel,CorpsofEngibeers District Engineer 8410230021 841010 PDR ADOCK 05000458 D

PDR 0h 9

'IO y as2 l

._