Submits Addl Info in Response to 920729 Request Re Corrective Action for Misinterpretation of Test Data Which Permitted Improper Changes to Occur,Per Insp Rept 50-334/92-02.Procedure Writers Guide Being Revised
ML20106A965
Person / Time
Site: Beaver Valley
Issue date: 09/18/1992
From: Sieber J
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9209300164
Download: ML20106A965 (1)


Text

_.......

..-.._.m

. _.. _ _. _. =.

Be r 'a y Powet Station Stuppingport. PA 15077-0004 (41D 393 5255 JOHN D S;EBCH ue r.nent - Nauw oroup September 18, 1992 U.

S.

Nuclear Regulatory Commission Attn:

Document Controj Desk Washington, DC 20555

Subject:

Ucaver Valley Power Station, Unit No. 1 Dochet No. 50-334, License No. DPR-66 Inspection Report 50-334/92-02 NRC correspondence dated July 29,

1992, requested additional information concerning corrective action for the misinterpretation of test data which permitted an improper mode change to occur.

Specifically, it questioned whether a

mechanism existed to ensure that the results of Temporary Operating Procedures (TOPS), along with appropriate acceptance

criteria, are provided to all groups or individuals respcnsible for making operability decisions based on the results.

To ensure the accurate and timely communication of test results, our Procedure Writer's Guide is being revised to require that all TOPS with acceptance criteria contain procedural steps to notify affected groups of the results of the procedure.

Also, the Nuclear Shift Supervisor (NSS) will be required to review the completed TOP and its acceptance criteria for any operability concerns.

In

addition, system engineers will be assigned as needed with the responsibility of ensuring that the necessary coordination and communication occurs between groups.

If there are any questions concerning this matter, please contact Mr.

N.

R. Tonet at (412) 393-5210.

Sincerely, ll [( uA4 -

Sieber cc:

Mr.

L.

W. Rossbach, Sr. Resident Inbpector Mr.

T.

T.

Martin, NRC Region I Administrator Mr.

L.

H.

Bettenhausen, Chief, Operations Branch Division of Reactor Safety, Region I Mr.

A.

W.

De Agazio, Project Manager Mr.

M.

L.

Bowling (VEPCO) 28;034 9$bf 9209300164 920910 PDR ADOCK 05000074 taa

/*