Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20105B375 + (ML20105B375)
- PY-CEI-NRR-1545, Monthly Operating Rept for Aug 1992 for Perry Nuclear Power Plant Unit 1 + (ML20105B382)
- ML20105B387 + (ML20105B387)
- RBG-37490, Monthly Operating Rept for Aug 1992 for River Bend Station, Unit 1 + (ML20105B388)
- HL-2914, Monthly Operating Repts for Aug 1992 for Ei Hatch Nuclear Plant,Units 1 & 2 + (ML20105B395)
- 05000328/LER-1984-021-02, :on 841229,reactor Trip Occurred on Loop 4 lo-lo Steam Generator Water Level.Caused by Operator Error. Post-trip Evaluations Performed.No Abnormalities Noted + (ML20105B398)
- 1CAN099204, Monthly Operating Rept for Aug 1992 for Arkansas Nuclear One Unit 1 + (ML20105B402)
- JAFP-92-0652, Monthly Operating Rept for Aug 1992 for Ja Fitzpatrick Nuclear Power Plant + (ML20105B403)
- ML20105B407 + (ML20105B407)
- 2CAN099204, Monthly Operating Rept for August 1992 for Arkansas Nuclear One Unit 2 + (ML20105B414)
- ML20105B416 + (ML20105B416)
- ML20105B420 + (ML20105B420)
- ML20105B425 + (ML20105B425)
- 05000454/LER-1984-020, :on 841125 & 28,source Range Channel N32 Indicated Noise Spikes on Four Occasions,Resulting in Containment Evacuation Alarms.Cause Under Investigation. Source Range Channel Modified + (ML20105B434)
- 05000278/LER-1985-003, :on 850109,during Surveillance Testing of HPCI Logic Sys,Hpci Turbine Could Not Be Tripped & Declared Inoperable.Caused by Relay Piston Binding Due to Paraffin on Piston.Piston Cleaned + (ML20105B450)
- ML20105B473 + (ML20105B473)
- ML20105B480 + (ML20105B480)
- ML20105B494 + (ML20105B494)
- ML20105B504 + (ML20105B504)
- ML20105B505 + (ML20105B505)
- ML20105B522 + (ML20105B522)
- ML20105B523 + (ML20105B523)
- ML20105B525 + (ML20105B525)
- ELV-03998, Monthly Operating Repts for August 1992 for Vogtle Electric Generating Plant + (ML20105B528)
- ML20105B529 + (ML20105B529)
- ML20105B530 + (ML20105B530)
- ML20105B535 + (ML20105B535)
- ML20105B538 + (ML20105B538)
- ML20105B542 + (ML20105B542)
- ML20105B584 + (ML20105B584)
- ML20105B594 + (ML20105B594)
- ML20105B595 + (ML20105B595)
- 05000368/LER-1992-005-01, :on 920824,discovered That Fuel Handling Area Ventilation Exhaust Fan Belt Had Been Operated for Two Periods W/O Effluent Monitored for Radioactivity Required by Ts.Caused by Personnel error.SPING-7 Repaired + (ML20105B614)
- ML20105B615 + (ML20105B615)
- ML20105B616 + (ML20105B616)
- 05000366/LER-1992-014-01, :on 920818,personnel Error Resulted in Mispositioned Valve & Engineered Safety Feature Actuation. Procedure 34SO-G31-003-2S Revised + (ML20105B622)
- RBG-37480, Forwards Rev 0 to EA-CA-92-0007-M, River Bend Station,Cycle 5 COLR & Rev 0 to 23A7181, Supplemental Reload Licensing Rept for River Bend Station,Reload 4,Cycle 5, Issued by GE + (ML20105B633)
- 05000352/LER-1984-045, :on 841230,reactor Encl HVAC Isolated Due to Low Differential Pressure.Caused by False Input in Differential Pressure Sensors Due to High Winds.Isolation Reset & HVAC Sys Restarted + (ML20105B637)
- ML20105B638 + (ML20105B638)
- ML20105B639 + (ML20105B639)
- ML20105B648 + (ML20105B648)
- 05000325/LER-1985-001, :on 850103,calibr of Reactor Vessel Shroud Level Instruments 1(2)-B21-LTM-N036-1 & N037-1,did Not Meet Design Intent.Caused by Inconsistency in Data Sheets. Instruments Properly Calibr + (ML20105B667)
- ML20105B682 + (ML20105B682)
- ML20105B702 + (ML20105B702)
- ML20105B704 + (ML20105B704)
- ML20105B705 + (ML20105B705)
- ML20105B714 + (ML20105B714)
- ML20105B721 + (ML20105B721)
- ML20105B723 + (ML20105B723)
- 2CAN099201, Responds to NRC 920820 Telcon Request for Util to Upgrade SBLOCA to Reflect Quantitative Evaluation of Spectrum of Break Sizes If Future Mods Made to Facility Which Would Impact Existing SBLOCA Model + (ML20105B737)
- NG-92-4048, Suppls 911223 Response to Suppl 4 to GL 88-20 Re Proposed Programs for Completing IPEEE for plant-specific Severe Accident Vulnerabilities & GL-87-02,Suppl 1.Response Will Be Submitted No Later than 920921 + (ML20105B750)