Text
. . -
v f
NRC MONTHLY OPERATING REPORT l
DOCKET NO: 50-361 e UNIT NAML: _ SONGS - 2 i DATE: 9-15-92 l COMPLETED BY: J. L. Darlina ,
TELEPHONE: (714) 368-6223 _
t OPERATING STATUS
- 1. Unit Name: San Onofre Nuclear Generatina Station. Unit 2
- 2. Reporting Period: Auaust 1992 [
- 3. Licensed Thermal Power (MWt): 3390 >
- 4. Nameplate Rating (Gross MWe): 1127 -
- 5. Design Electrical Rating (Net MWe): 1070
- 6. Maximum Dependable Capacity (Gross MWe): 1127
- 7. Maximum Dependable Capacity (Net MWe) , 1070 :
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) e Since Last Report, Give Reasons: NA
- 9. Power Level To Which Restricted, if Ar4 (Net MWe): NA
- 10. Reasons for Rest:ictions, If Any: NA j This Month Yr.-to-Date Cumulative ;
- 11. Hours In Reporting Period 744.00 5.855.00 79.248.00!
- 12. Number Of Hours Reactor Was Critical 717.95 5.313.11 __ 57.805.36
- 13. Reactor Reserve Shutdown Hours 0.00 ___ 0 . 0 0 __ 0.00
- 14. Hours Generator On-Line 712.43 5.286.57 56.728.12 -
- 15. Unit Reserve shutdown Hours 0JO 0.00 _ 0.00
- 16. Gross Thermal Energy Generated (MWH) 2.344.157,34 17.536.835.53 185.058.870.96
- 17. Gross Electrical Energy Generated (MWH) 780.429.50 5.946.562.50 (2.747.865,00
- 13. Net Electrical Energy Generated (MWH) 741.857.00 52 652.824.00 59.465.158.83
- 19. Unit Service Factor 95.76%- 90.29% 7 }. 58%-
- 20. Unit Availability Factor 95.76% 90.29% 71.58%
- 21. Unit Capacity Factor (Using MDC Net) 93.19% 90.23% 70.13%
- 22. Unit Capacity Factor (Using DER Net) 93.19% 90.23% 70.13%
- 23. Unit Forced Outage Rate 4.24% 9.71% _ 7.20%
- 24. Shutdowns Scheduled Over Next 6 Months (fype, Date, and Duration of taci):
None
- 25. If Shutdown At End Of Report Period, EstimEcd Date of Startup: NA
- 26. Units In Test Status (Prior To Comn:ercial Operation): Forecast Achieved INITIAL CRITICALITY NA NA INITIAL ELECTRICITY _. NA NA -
COMMERCIAL OPERATION NA _, NA l
P 5
1 mor.aug/2 ,
t 920921011L 920831 .
4 4 .
1 ,
l !
l AVERAGE DAILY UNIT POWER LEVEL
?
! DOCKET NO: 50-361 i UNIT NAME: SONGS .
9-15-92 :
DATE:
COMPLETED BY: J. L. Darlins !
TELEPHONE: (714) 368-6223 MONTH: August 1992 ;
i' DAY AVERAGE DAILY POWER LEVEL l DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) :
1 0 . L.' 16 1089.67 j
- 2 , 379.50 17 1089.54 ;
f I 1086.96 3 949.77 18 w 4 1074.29 19 1087.83 S 1051.63 20 1091.25 !
i 6 1081.04 21 1088.00 l 7 1071.79 22 1071.00 8 1035.92 23 1084.46-i 9 1088.67 24 1082.02 _
l 10 1032.33 25 1067.13 ,
l 11 1003.13 26 929.96 -
12 1084.08 27 940.25
- +
13 1091.54 28 ,
939.33 14 1080.54 29 1043.17 :
1 i
- 15 1069.00 30 1086.63 ;
i 31 1044.67 I i
h i
mor.aug/3 .
4 ;
i +
1 1
, -- - .e.- --- - , y
. ~ . . - ~ . - . . . . - - . . . . - . - - -. . . - . . . . . - . . _ . - - .- . .- .- . - . . . - . . .
UNIT SHUTDOWHS AND POWE! REDUCTIONS DOCKET N0: _50-361 UNIT NAME: SONGS - 2 REPORT MONTH: AucJst 1992 DATE: 9 33-92 . .
COMPLETED BY: J. L. Darling TELEPHONE: (714) 368-6223 _
Method of Shutting Cause & Corrective Duration Down LER System Component Action to 5
No. Date Type' (Hours) Reason' Reactor3 No. Code' Code Prevent Recurrence 76 920731 F- 31.57 H 3 2-92-012 EA XTP Continued from previous month's JC outage.
2 3 2
F-Forced Reason: Method: "IEEE Std 805-1984 S-Scheduled A-Equipment Failure (Explain) 1-Manual S
B-Maintenance or Test 2-Manual Scram. IEEE Std 803A-1983 C-Refueling 3-Automatic Scram.
D-Regulatory Restriction 4-Continuation from E-Operator Training & License Examination ' Previous Month F-Administrative 5-Reduction in the Averege G-Operational Error (Explain) Daily Power Level of more H-Other (Explain) than 20% from the previous day 6-Other (Explain) mor.aug/4
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET N0: _50-361 UNIT NAME: SONGS - 2 DATE: 9-15-92 COMPLETED BY: __J. L. Darlino TELEPHONE: (714') 368-6223 Date Time Event August 1 0001 Unit is in Mode 3, 543.5F, 2250 psia, following automatic Reactor trip on 7/31/92.
August 2 0124 Entered Mode 2.
0203 Reactor is made critical.
0345 Entered Mode 1.
0734 Unit synchronized to the grid.
0810 Commenced reactor power increase to 80% power for circulating water system heat treat.
2335 Reactor power at 80% for heat treat.
August 3 1050 Commenced reactor power increase to 100% power ,
following completion of heat treat. t 1340 Reactor at 100% power.
August 7 2100 Commenced reactor power decrease to 90% power to perform corrective maintenance on HP turbine valve control circuits.
2300 Reactor power at 90%.
August 8 0950 Commenced reactor power increase to 100% following completion of turbine valve work.
1205 Unit at 100% power.
August 10 2105 Commenced reactor power decrease to 50% power for containment entry to perform inspection of RCP 2P003 lower oil reservoir.
August 11 0055 Unit at 50% cower.
0135 Commanced reactor power increase to 100% power following completion of RCP 2P003 reservoir inspection.
0550 unit at 100% power.
mor.aug/5
?
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH .
DOCKET N0: 50-361 i UNIT NAME: SONGS - 2 DATE: 9-15-92
. COMPLETED BY: J. L. Darlina
, TELEPHONE: (714) 368-6223 I Time Event Dale 3 i August 25 2200 Commenced reactor power decrease to 90% for
, removal of Second and Third point heaters from -
service because of a steam leak on cascade drain
- j line. -
2305 Unit at 90% power. :
i
- August 29 0202 Commenced reactor power increase to 100% following repairs to second and third point heater cascade
' drain line, i
0932 Unit at 100% power. i August 31 2400 Unit at 100% power, 1140 MWe.
)
i
! I 3
I h
E
~
I i
1 1
mor.aug/6
REFUELING INFORMATION DOCKET N0: 50-361 UNIT NAME: SONGS - 2 DATE: 9-15-92 COMPLETED BY: - J. L. Darlino TELEPHONE: (714) 368-6223 MONTH: Auoust 1992
- 1. Scheduled date for next refueling shutdown.
Cycle 7 refueling outage is forecast for May 1993.
- 2. Scheduled date for restart following refueling.
Restart from Cycle 7 refueling outage is forecast for August 1993.
- 3. Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
Not yet determined for Cycle 7.
What will these be?
Not yet determined.
, 4. Scheduled date for submitting proposed licensing action and supporting information.
Not yet determined.
- 5. Important licensing considerations associated with refueling, e.g. new or-different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.
Not yet determined.
mor.aug/7
. s t W i
- i
- - REFUELING INTORltATION
- DOCKET NO: 50-361 ;
j UNIT haME: SONGS - 2 ;
DATE: 9-15-92 !
COMPLETED BY: J. L. Darlina (714) 368-6223 1 TELEPHONE:
- i MONTH
- August 1992__ ;
i ;
- 6. The number of fuel assemblies.
- a) In the core. 217 ,
- r i b) In the spent fuel storage pool. 554 (484 Unit 2 Spent
! Fuel A,semblies, 70 .
i Unit 1 Spent Fuel ;
2 Assemblies) 4 7. Licensed spent fuel storage capacity. 1542 j 4
4 Intended change in spent fuel storage capacity. Nono
- 8. Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity. ;
- Approximately 2001 (full off load capability) {
l i t
, I i
i i
b i
b I
4 mor.aug/8 i
b
?
NRC MONTHLY OPERATING REPORT ,
DOCKET NO: 50-362 UNIT NAME: SONGS - 3 DATE: 9-15-92
, COMPLETED 8Y: J. L. Darlina [
TELEPHONE: (714) 368-6223 1
OPERATING STATUS I
- 1. Unit Name: San Onofre Nuclear Generatina Station. Unit 3 ;
- 2. Reporting Period: August 1992 -
- 3. Licensed Thermal Power (MWt): 3390 ;
. 4. Nameplate Rating (Gross MWe): 1127 4 5. Design Electrical Rating (Net MWe): 1080 l
, 6. Maximum Dependable Capacity (Gross MWe): 1127 '
i 7. Maximum Dependable Capacity (Net MWe): 1080
- 8. If Changes Occur In Capacity Ratings (Items Number 3 Through 7)
Since Last Report, Give Reasons: NA >
i 9. Power Level To Which Restricted, If Any (Net MWe): NA
^
- 10. Reasons For Restrictions, If Any: NA ,
l This Month Yr.-to-Date Cumulative ;
- 11. Hours In Reporting Period 744.00 5.855.00 73.799.00 l
- 12. Number Of Hours Reactor Was Critical 744.00 3.822.71 56.320.96 ,
- 13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00
- 14. Hours Generator On-Line 744.00 3.663.80 54.734.81 !
- 15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
- 16. Gross Thermal Energy Generated (MWH) 2.439.547.30 11.788.837.42 175.076.261.88 ,
- 17. Gross Electrical Energy Generated (MWH) 824.083.00 3.955.442.00 59.355.467.00
- 18. Net Electrical Energy Generated (MWH) 783.661.00 3.718.655.07 56.036.762.36
- 19. Unit Service Factor 100.00% 62.58% 74.17% i
- 20. Unit Availability Factor 100.00% ____ 62.58% 74.17%
- 21. Unit Capacity Factor (Using MDC Net) 97.53% 58.81% 70.31%
- 22. Unit Capacity Factor (Using DER Net) 97.53% 58.81% 70.31% .
- 23. Unit Forced Outage Rate 0.00% 8.83% 7.82%
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): !
None j 25. If Shutdown At End Of Report Period, Estimated Date of Startup: NA ,
- 26. Units In Test Status (Prior To Commercial Operation): Forecast Achieved ,
INITIAL CRITICALITY NA NA i INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA i
s I
J f
mor.aug/9 4
t
- AVERAGE DAILY UNIT POWER LEVEL DOCKET N0
- . 50-361 UNIT NAME: SONGS - 3 DATE: _9-15-92 COMPLETED BY: J. L. Darlina
. TELEPHONE: (714) 368-6223 MONTH: Auaust 1992 I
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL l (MWe-Net) (MWe-Net) i 1 852.88 16 716.46 .
I !
- 2 1087.42 17 1025.08 ;
3 1081.63 18 1089.88 4 1081.25 19 1092.17 5 1078.71 20 1096.63 6 1078.67 21 1081.25 7 1072.21 22 1049.63 8 1068.25 23 1095.25 ;
i 9 1084.83 24 1093.21 10 1082.54 25 1091.33 4
- 11 1081.25 26 1092.46'
12 1083.96 27 1092.17 ;
13 1089.79 28- 1089.63 ;
14 1052.67 29 1096.79- ;
i 15 791.04 30 1099.92 l 31 1083.63 8
i
?
mor.aug/10 l 1 1 i
. .- - . - .. . .- . . _ - -. . . ~ . . - . . . . . . . - - . - - . - -. . _ . . . . . . . - . . . . . .
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO: 50-362 UNIT NAME: SONGS - 3 REPORT MONTH: August 1992 DATE: 9-15-92 .
COMPLETED BY: J. L. Darling TELEPHONE: (714) 368-6223 Method of Shutting Cause & Corrective Duration Down LER System Component 5
Action to No. Date Type l (Hours) Reason E Reactor 3 No. Code' Code Prevent Recurrence 68 920815 S NA B 5 NA KE COND Reduced reactor power to 80% to perform circulating water system heat treatment and condenser water box cleaning. Reactor power reduced to 50% following heat treat to allow containment entry to install temporary oil addition system to RCP P001.
1 2 3 F-Forced Reason: Method: 'IEEE Std 805-1984 S-Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test' ' 2-Manual Scram. S IEEE Std 803A-1983 C-Refueling 3-Automatic Scram.
D-Regulatory Restriction . 4-Continuation from E-Operator Training & License Examination Previous Month F-Administrative 5-Reduction in the Average G-Operational Error (Explain) Daily Power Level of more H-Other-(Explain) than 20% from the previous day 6-Other (Explain) mor.aug/11
, , w ,, - ,. ,m.. , ~~..- y .*,.m . , , - - ,mv v -, -, --r S. r - - - -
9 I
4
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH i DOCKET h0: 50-362 UNIT NAME: SONGS . 3 '
DATE: 9-15-92
- COMPLETED BY: J. L. Darlina
- TELEPHONE
- (714) 368-6223 ,
t F
l Date Time Event August 1 0001 Unit is in Mode 1 at 75% reactor power, Turbine load at 820 MWe. Power reduced for water box cleaning and 1 l
Containment entry to inspect Pressurizer instrument line #
' for leakage.
0427 Containment entry completed, the Pressurizer instrument
- line leak identified to be on the canopy seal of root i valve MR043. ;
1516 Circulating water pump 3P-118 started after completion of water box cleaning.
1612 Commerced reactor power increase to 100%.
4 l 1905 Reactor at 100% power, 1130 MWe. 7 I
August 14 1200 Commenced Unit power reduction to reduce circulating l
, water differential tencerature to less than 20.0F. ;
l 1500 Unit at 94.5% power,-1068 MWe, Circulating water -
differential temperature at 19.5F. i i i August 15 0230 Commenced reactor power decrease to 80% power .
in preparation for circulating water heat treat. j 0458 Unit at 80% reactor power. I 1 1355 Heat treat completed. t 1700 Reactor power decreased to 75% and Circulating water !
pump 3P-115 stopped for maintenance on start circuitry, i L
2200 Commenced reactor power decrease to 50% in preparation for Containment entry to install temporary oil addition ,
system on RCP P001. ,
2 August 16 0059 Circulating water pump 3P-115 started following ;
completion of start circuitry maintenance. ,
^
mor.aug/12 W
?
4
3
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO: ..EQ-362-
- i UNIT NAME: _&2t3S - 3 .
DATE: 9 15-92 COMPLETED BY: J. L. Darlina TELEPHONE: (714) 368-6223 I P Date Time Event ,
August 16 0200 Reactor at 50% power.
0540 Commenced r: actor power increase to 100% following completion of containment entry. ,
August 17 0001 Unit at 89% power, 1030 MWe. Holding power because 20 degree circulating water differential temperature ;
limit reached. Suspect circulating water gate 5 not i
fully closed.
t 1235 Commenced reactor power increase to full- power after completing repairs and closure of gate 5.
1435 Unit at 98% reactor power,1120 MWe, Unit load increase stopped circulating water differential temperature being reached.
August 18 0001 Reactor power increased to 99.4%, 1138 MWe. Circulating water differential temperature is less than 20 degrees.
l August 21 2138 Commenced power reduction to 90% to perform HP valve 4
testing and maintenance ,
2238 Unit at 90% reactor power,1000 MWe.
I August z2 0916 Commenced reactor power increase to 100% following completion of HP valve testing and maintenance.
1225 Unit at 100% reactor power,1140 MWe, -
August 31 2400 Unit at 100% reactor power,1147 MWe, ,
t 1
h t
1 mor.aug/13
- 4
l, REFUELING INFORMATION ;
DOCKET N0: 50-362 i 4 UNIT NAME: SONGS - 3 !
l DATE: 9-15-92 I i
COMPLETED BY: J. L. Darlina TELEPHnNE: (714) 368-6223 ,
MONTH: August 1992
[
- 1. Scheduled date for next refueling shutdown.
! Cycle 7 refueling outage is forecast for September 1993.
I t
- 2. Scheduled date for restart following refueling.
! Restart from Cycle 7 refueling outage is forecast for December 1993. [
f
- 3. Will refueling or resumption of operation thereafter require a Technical
- Specification change or other license amendment? ;
! Not yet determined for Cycle 7. .
4
- What will these be?
I i Not yet determined.
~
- 4. Scheduled date for submitting proposed licensing action and supporting information. l 4 Not yet determined.
r
- 5. Important licensing considerations associated with refueling, e.g. new or l
, different fuel design or supplier, unreviewed design or performance analysis ;
methods, significant changes in fuel design, new operating procedures.
- Not yet determined.
i l
$ I i
r Y
J mor.aug/14 f 4
l l
i i j REFUELIiG INFORMATION l s ;
! DOCKET NO: 362 l
- UNIT NAME
- SONGS - 3 l DATE: _
9-15-92 j C3J.?LETED BY: Darlina t l TELEPHONE: 714 368-6223 _
{
! MONTH: _ August 1992 !
j 6. The number of fuel assemblies. ,
i
- i a) In the core. 217 !
2 I
- b) In the spent fuel storage pool. 553 (484 Unit 3 Spen _t :
j fuel Assemblies. 69 __ j Unit 1 Spent fuel :
j Assemblies) ;
- 7. Licensed spent fuel storage capacity. 1542 [
i l l Ir. tended change in spent fuel storage capacity. None. l i !
- 8. :,ajected date of last refueling that can be discharged to spent fuel s+orage t j pool assuming present capacity, i
- e Approximately 2003 (full off load capability) f t
i f i
e
- i
, ?
l I i
}
r i !
i 4
i i
l t
, t i l i.
mor.aug/15 P