Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20102B416 + (ML20102B416)
- ML20102B421 + (ML20102B421)
- ML20102B427 + (ML20102B427)
- ML20102B429 + (ML20102B429)
- ML20102B430 + (ML20102B430)
- ML20102B435 + (ML20102B435)
- ML20102B437 + (ML20102B437)
- 05000275/LER-1985-006, :on 850125,both RHR Trains Inoperable.Caused by Closure of Loop 4 RHR Suction Valve MOV-8702 Due to Loss of 4-kV Bus Voltage.Suction Valve Opened & RHR Flow Established within 2 Minutes + (ML20102B441)
- ML20102B443 + (ML20102B443)
- ML20102B444 + (ML20102B444)
- ML20102B463 + (ML20102B463)
- ML20102B474 + (ML20102B474)
- ML20102B481 + (ML20102B481)
- ML20102B492 + (ML20102B492)
- ML20102B512 + (ML20102B512)
- ML20102B563 + (ML20102B563)
- ML20102B593 + (ML20102B593)
- BSEP-85-0143, Responds to NRC Re Violations Noted in Insp Repts 50-324/84-31 & 50-325/84-31.Corrective Actions:Special Procedures Established & Performed to Verify Actuation Valves & Surveillance on Control Bldg Air Intake Detectors + (ML20102B605)
- ML20102B607 + (ML20102B607)
- ML20102B610 + (ML20102B610)
- ML20102B617 + (ML20102B617)
- ML20102B622 + (ML20102B622)
- B11455, Forwards Procedure EA-062, Program for Completion of Engineering Assurance In-Depth Technical Audits,Millstone Unit 3 Project, Per 850211 Meeting Discussion.Program Describes NRC Involvement in Audit Process + (ML20102B642)
- ML20102B645 + (ML20102B645)
- ML20102B648 + (ML20102B648)
- ML20102B653 + (ML20102B653)
- ML20102B657 + (ML20102B657)
- AECM-85-0064, Forwards Revised Justifications for Continued Operation of Asco Solenoid Valves on MSIVs & 480-volt Circuit Breakers in Klockner-Moeller Motor Control Ctr.Encl Revs Support Extension of Environ Qualification Deadline to 851130 + (ML20102B663)
- ML20102B668 + (ML20102B668)
- ML20102B669 + (ML20102B669)
- ML20102B683 + (ML20102B683)
- 3F0285-21, Application for Amend to License DPR-72,consisting of Tech Spec Change Request 130,switching Fire Detection Instrumentation,Deluge & Sprinkler Sys & Fire Hose Station Tables from Tech Specs to Fire Protection Plan + (ML20102B684)
- ML20102B688 + (ML20102B688)
- ML20102B702 + (ML20102B702)
- ML20102B704 + (ML20102B704)
- ML20102B711 + (ML20102B711)
- RBG-20227, Requests That Response Due Date Be Extended to 850329 for Generic Ltr 84-24, Certification of Compliance to 10CFR50.49,Environ Qualification of Electric Equipment Important to Safety for Nuclear Power Plants + (ML20102B715)
- RBG-20013, Responds to NRC Re Deviations Noted in Insp Rept 50-458/84-38.Corrective Actions:Fsar Commitments Will Be Stressed to Personnel Preparing,Reviewing & Approving Preoperational Test Procedures & Results + (ML20102B736)
- ML20102B741 + (ML20102B741)
- ML20102B744 + (ML20102B744)
- ML20102B748 + (ML20102B748)
- 3F0285-11, Discusses Interpretation of 10CFR20.203(f) Which Requires Label Identifying Contents of Containers of Licensed Matl. Util Requires Radioactive Matl Tags on Containers of Radioactive Matls.Feedback Requested by 850308 + (ML20102B749)
- ML20102B752 + (ML20102B752)
- AECM-85-0046, Provides Basis That Weir Wall Overflow Following Postulated Inadvertent Upper Containment Pool Dump Does Not Involve Significant Safety Problem.Evaluation Plans & Justification Provided + (ML20102B754)
- ML20102B755 + (ML20102B755)
- ML20102B763 + (ML20102B763)
- ML20102B772 + (ML20102B772)
- ML20102B778 + (ML20102B778)
- 3F0285-27, Confirms That Response to Generic Ltr 85-04 Re Requirements for Operator Licensing Exams Through 880930 Will Be Delayed. Estimated Requirements Will Be Provided by 850401 + (ML20102B783)
- ML20102B794 + (ML20102B794)
- BECO-85-037, Comments on Availability of NRC Fire Protection Policy Steering Committee Rept,Per Generic Ltr 85-01.NRC Response Does Not Address Intent of Question But Establishes Guidelines for Seismic Design of Fire Protection Sys + (ML20102B795)