Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20101F186 + (ML20101F186)
- ML20101F190 + (ML20101F190)
- ML20101F193 + (ML20101F193)
- ML20101F201 + (ML20101F201)
- ML20101F208 + (ML20101F208)
- ML20101F209 + (ML20101F209)
- 05000424/LER-1996-001-02, :on 960220,pipe Fatigue Leads to Nuclear Svc Cooling Water Inoperability.Caused by Design That Allows Fatigue Cracks to Develop in Discharge Piping.Indications/ Cracks Repaired + (ML20101F213)
- ML20101F215 + (ML20101F215)
- ST-HL-AE-5316, Responds to NRC Re Violation Noted in Insp Rept 50-499/96-12.Corrective Actions:Lessons Learned from Occurrence Issued to Licensed Operators & Understanding of Policies & Practices Will Be Strengthened Through Training + (ML20101F219)
- ML20101F232 + (ML20101F232)
- ML20101F234 + (ML20101F234)
- ML20101F238 + (ML20101F238)
- ML20101F239 + (ML20101F239)
- 05000305/LER-1984-019, :on 841114,train B of Auxiliary Bldg Special Ventilation Sys,Control Room post-accident Recirculation Fan 1B & Train B Safeguards Fan Coil Units Inadvertently Actuated.Caused by Miswired Relay + (ML20101F243)
- RBG-37043, Ro:On 920618,employee Injured While Working in Drywell. Complete Survey of Individual for Contamination Not Possible Prior to Transport of Individual to Hosp + (ML20101F244)
- LD-92-078, Submits Supplemental Info for Previous Sys 80+ Rais, Including Response to TMI Item II.E.3.1 Which Confirms That Backup Pressurizer Heaters Are Not Relied Upon or Required for Natural Circulation in RCS + (ML20101F250)
- ML20101F252 + (ML20101F252)
- ML20101F254 + (ML20101F254)
- ML20101F255 + (ML20101F255)
- ML20101F262 + (ML20101F262)
- ML20101F271 + (ML20101F271)
- ML20101F274 + (ML20101F274)
- ML20101F276 + (ML20101F276)
- BVY-92-068, Documents Request for Temporary Waiver of Compliance from TS LCO Requirements Re EDG Operability.Waiver of Compliance Will Allow One Addl Day to Repair Components & Thoroughly Test EDG Prior to Returning to Svc + (ML20101F281)
- 05000315/LER-1984-021, :on 840829,calibr Constants Used by Eberline Radiation Monitoring Sys to Convert Channel Response in Counts Per Minute Into Units Calculated Incorrectly.Caused by Procedural Error + (ML20101F283)
- ML20101F284 + (ML20101F284)
- ML20101F286 + (ML20101F286)
- ML20101F290 + (ML20101F290)
- ML20101F298 + (ML20101F298)
- HL-5131, Advises That Util Has Implemented Guidance Re Testing of Both SSPV & ARI Sys.Util Intends to Become Member of BWROG Committee Addressing Viton SSPV Issue + (ML20101F301)
- PY-CEI-NRR-2038, Forwards Rev 3 to PDB-F0001, COLR for Perry Nuclear Power Plant Unit 1,Cycle 6 (Reload 5) & Rev 0 to J11-02581SRLR, Supplemental Reload Licensing Rept for Perry Nuclear Power Plant Unit 1,Reload 5,Cycle 6 + (ML20101F310)
- ML20101F311 + (ML20101F311)
- ML20101F313 + (ML20101F313)
- ML20101F314 + (ML20101F314)
- ML20101F315 + (ML20101F315)
- ML20101F318 + (ML20101F318)
- ML20101F319 + (ML20101F319)
- ML20101F325 + (ML20101F325)
- ML20101F328 + (ML20101F328)
- ML20101F330 + (ML20101F330)
- ML20101F331 + (ML20101F331)
- ML20101F333 + (ML20101F333)
- ML20101F334 + (ML20101F334)
- ML20101F335 + (ML20101F335)
- ML20101F337 + (ML20101F337)
- ML20101F338 + (ML20101F338)
- ML20101F341 + (ML20101F341)
- 05000374/LER-1984-077, :on 841115,primary Containment Vacuum Breaker a Opened Momentarily to Equalize Pressure Between Suppression Pool & Drywell.Caused by Cycling Primary Containment Chillers on & Off.Instruments Recalibr + (ML20101F342)
- TXX-9228, Interim Deficiency Rept CP-86-72 Re Scope of Plant Mods Resulting from Project Pipe Support Validation Program.C/As Consist of Completion of Small Bore Pipe Support Mods, Rescheduled for Completion Prior to Unit 2 Fuel Load + (ML20101F345)
- ML20101F352 + (ML20101F352)
- ML20101F357 + (ML20101F357)