Forwards Byron Unit 1 SG Eddy Current Insp Rept Cycle 7, Midcycle (B1P02) Oct-Dec 1995
ML20101F234
Person / Time
Site: Byron 
Issue date: 03/19/1996
From: Wozniak D
COMMONWEALTH EDISON CO.
To:
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20101F237 List:
References
BYRON-96-5046, NUDOCS 9603250407
Download: ML20101F234 (1)


Text

_

Commonweahh lilimn LompJn}

lhron Generating Station

-4 650 North German thtirt h Road Ilyron. IL 610109 9 i Tel Hik!3 64 s t i March 19,1996 g

_g LTR:

BYRON-96-5046 FILE: 3.11.0530 Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION: Document Control Desk

SUBJECT:

Comed Byron Station Unit i Steam Generator Eddy Current Examination During B1P02 - 90 Day Summary Report

REFERENCE:

LER 454: 95-011 BYRON-95-5174 Please find attached a report for the Byron Unit i Steam Generator examination performed during Cycle 7 midcycle outage (B1P02) during October-December 1995. This report is being submitted in compliance with the requirements of Mandatory Appendix IV of Section XI of the ASME Boiler and Pressure Vessel Code,1983 Edition through Summer 1983 Addenda in accordance with Byron Technical Specification 4.0.5.

If there are any questions, please contact Mr. J. K. Lonigro at Byron Station at (815) 234-5441 extension 2166.

Sincerely, s

s David B. WozniakU Site Engineering Manager Byron Nuclear Power Station DBW/cb Attachment cc:

H. J. Miller, NRC Regional Administrator, Rlli G. F. Dick, Jr., Byron Project Manager - NRR H. Peterson, Senior Resident inspector, Byron Office of Nuclear Safety-IDNS ey 0 0 9 3 Site Engineering eiie

}

~

9603250407 960319 PDR ADOCK 05000454 G

PDR I

p:\\sectyrttrG6-5046. doc I

P A l'nicom Company

.