ML20101F252
| ML20101F252 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 06/16/1992 |
| From: | Mcmeekin T DUKE POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| IEB-88-004, IEB-88-4, TAC-69934, TAC-69935, NUDOCS 9206240350 | |
| Download: ML20101F252 (3) | |
Text
1 ll l
Dak, h a, Comp.my I (' M un,n Mi Gus v Nui kar Gerterutwn Dcpartarn!
Via froidtnr 12 NI daeers le try &wJ (WGCIA)
(f(,4p15-4 m1 Ilutstroaik, N('lMiMN (704pi;Q m ng l
DUKEPOWER June 16, 1992
]
l l
U.
S.
Nuclear Regulatory Comminsion Attention: Document Control Desk l
Washington, D. C.
20555
^
Subject:
McGuire Nuclear Station, Units 1 and 2 Docket Nos. 50-369 and 50-370 NRC Bulletin 88-04 Potential Safety-Related Pump Loss (TACS 69934, 69935)
Dear Sir; NRC Dulletin 88-04 concerning notential r,afety-ralated pump losti was issued May 5, 1988.
This bulletin requested invustigation and correction of, if required, two miniflow design concerns.
By a letter dated January 15,1990, Duke Power submitted the Final Bulletin Action No. 4 Report for McGuire Nuclear Station.
According to that letter, the long term corrective actions that romained to be completed involv _i the ND pumps.
ated by Action Item 5 of the bulletin, the
> an l
rco!*r ations to the miniflow line for tne ND pumps were emy b ' ed during the end-of-cycle 7 refueling outages for botn u.its.
Briefly, the modification added a new two inch miniflow line for each of the ND pumps.
The miniflow line l
was tiod-in to the ND system immediately upstream of each ND pump discharge check valvo, and to each pump suction except for train A on unit 2.
The cornection for unit 2 train A is located at the NS train A suction, which is upstream of ND pump A.
Isolation valves for each miniflow line were installed at the tie-ins.
In addition, flow and temperature instrumentation and a throttling valve were installed on each miniflow line.
Accordingly, please be advised that all actions requested by the bulletin have been completed.
9206240350 920616 PDR ADDCK 05000369 el N
PDR 9
/o{' ') \\
l b
J U.
S. Nuclear Regulatory Commission June 16, 1992 page 2 i
i I declare under penalty of perjury that the statomonts set forth horoin are true and correct to the best of my knowledge.
If you have any questions regarding this bulletin, please contact Paul Guill at (704) 875-4002.
Very truly yours, f(NJLi Tod C. McMookin xct S.
D. Ebneter Regional Administrator, Region II P. K.-Vcn Door-Senior Resident Inspector, McGuiro T. A.
Reed, Project Manager ONRR I
1 f
~.
-n.
_..._.,-..._.-,._,m.-
-.,,,,,,,,.,.w..,.e w _- w # em, ne y m... y m a
,.,r.-cy_.-.y vi.,-..,.a.
,,..~,,,m-.,
+.-y---m,y
--mww,.y,,,--,.3-
l U.
S.
Nuclear Regulatory Commission June 16, 1992 pago 3 i
1 i
bec R. O. Sharpo K.
P. Mullen L.
J. Kunka P.
F. Guill
-B. 11. Hamilton R.
B. Whito,jr l
R.
E. Hall R. L. Gill,jr (NS)
R. E. Dixon T. D. Curtis R.
D. Travis J. D.
Pazzula,Jr.
P. V. Pham G. R. Blake M.
R. Ilatley M..E. Patrick (ONS)
R..C.-Futrell (CNS)
Fi.los 815.02 (88-04)
/pfg015.nrc' P
l I
e l~
(-
l.
- -a.. aza - -.
--.u
-,_..,._.________ _.~,-