Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- RBG-42657, Monthly Operating Rept for Feb 1996 for River Bend Station, Unit 1 + (ML20101D173)
- ML20101D174 + (ML20101D174)
- ML20101D176 + (ML20101D176)
- ML20101D182 + (ML20101D182)
- ML20101D189 + (ML20101D189)
- ML20101D196 + (ML20101D196)
- ML20101D203 + (ML20101D203)
- ML20101D209 + (ML20101D209)
- 05000254/LER-1996-006, :on 960210,TS 3.0.A Incorrectly Invoked Due to Procedural & Operator Knowledge Deficiencies.Policy Statement Developed & Presented to Licensed Operator Re Expectations for Use & Entry Into TS 3.0.A + (ML20101D217)
- ML20101D220 + (ML20101D220)
- ML20101D225 + (ML20101D225)
- RBG-19625, Interim Deficiency Rept DR-193 Re ECCS Suction Lines in Auxiliary Bldg.Next Rept Will Be Provided by 850220 + (ML20101D226)
- RBG-19628, Interim Deficiency Rept DR-238 Re Installation of Pacific Scientific Snubbers (PSA 35 & 100) & Associated Bergen- Paterson Clamps (PT 6220-50 & PT 6202-120).Next Rept Will Be Provided by 850221 + (ML20101D228)
- RBG-19629, Interim Deficiency Rept DR-168 Re Interpretation of W3 Welding Procedure for Performing Weld Repair.Next Rept Will Be Provided by 850221 + (ML20101D239)
- ML20101D241 + (ML20101D241)
- JAFP-92-0435, Special Rept:On 920504,CO2 Fire Suppression Sys Declared Inoperable When Walkdown Revealed That 4 Instead of 5 Nozzles Installed in Sys.Caused by Absence of Design Calculations.Replacement Nozzle Installed on 920518 + (ML20101D243)
- ML20101D245 + (ML20101D245)
- ML20101D258 + (ML20101D258)
- ML20101D263 + (ML20101D263)
- RBG-19626, Interim Deficiency Rept DR-228 Re Cylinder Head Valves in Standby Diesel Generator 1EGS*EG1A Supplied by Tdi.Next Rept Will Be Provided by 850221 + (ML20101D269)
- ML20101D274 + (ML20101D274)
- 05000373/LER-1984-076, :on 841111,undervoltage Trip of Reactor Protection Sys Bus a Occurred.Caused by Deenergized Relays & Ruptured Hose.Regulating Transformer Installed to Limit Undervoltage Condition + (ML20101D275)
- 05000454/LER-1984-010-08, :on 841112,boron Dilution Protection Sys Actuated.Caused by Noise Spike Due to Pulling Fuse.Mod to Boron Dilution Protection Sys Being Designed + (ML20101D277)
- ML20101D279 + (ML20101D279)
- ML20101D281 + (ML20101D281)
- ML20101D282 + (ML20101D282)
- ML20101D294 + (ML20101D294)
- ML20101D300 + (ML20101D300)
- ML20101D301 + (ML20101D301)
- ML20101D302 + (ML20101D302)
- ML20101D307 + (ML20101D307)
- ML20101D310 + (ML20101D310)
- 05000412/LER-1996-001, :on 960212,PSC Rod Bank Pulse Step Counter Positions Indicating 0 Steps.Caused by Electrical Distribution Sys Disturbance That Occurred 36 H Earlier. Performed Manual Cold Start of PCS + (ML20101D314)
- ML20101D316 + (ML20101D316)
- ML20101D317 + (ML20101D317)
- ML20101D320 + (ML20101D320)
- BSEP-96-0072, Submits Suppl Response to NRC GL 94-02, Long-Term Solutions & Upgrade of Interim Operating Recommendations for Thermal- Hydraulic Instabilities in Bwrs + (ML20101D322)
- B11394, Forwards marked-up Draft STS for Four Loop Operation of Plant.Draft STS for Three Loop Operation Forthcoming. Requests Meeting Be Arranged W/Nrc for Early Jan 1985 to Discuss Review Process & Future Draft Submittals + (ML20101D324)
- ML20101D326 + (ML20101D326)
- ML20101D332 + (ML20101D332)
- ML20101D335 + (ML20101D335)
- NSD-NRC-96-4666, Forwards Rept on Impact of Fan Cooler Operation on AP600 Aerosol Removal Rates & post-LOCA Aerosol Releases from Containment,In Support of RAI 470.25.Response to RAI 470.25 Scheduled for Completion by 960329 + (ML20101D339)
- ML20101D355 + (ML20101D355)
- NLS8400290, Responds to 841026 Request for Plans & Proposed Schedules to Implement Improvements in Water Level Measurement & Instrumentation Sys to Improve Reliability & Accuracy,Per Generic Ltr 84-23.Analog Equipment Will Be Installed + (ML20101D357)
- ML20101D375 + (ML20101D375)
- ML20101D376 + (ML20101D376)
- ULNRC-03346, Transmits Relief Requests R-1a,E-3a,E-4a,E-6 & E-7 to ISI Program Plan.Relief Requests Submitted Based on Insp Results from Refuel 7 & Represent Final Relief Requests for First ten-yr Insp Interval + (ML20101D393)
- ML20101D396 + (ML20101D396)
- ML20101D401 + (ML20101D401)
- 05000354/LER-1996-001, :on 960113,safety & Turbine Acs Heat Exchangers Fouled W/Detritus Occurred Due to Failed Svc Water Strainer. Strainers Replaced & Enhanced Maint & Design Mod + (ML20101D402)
- ML20101D406 + (ML20101D406)