Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20101D065 + (ML20101D065)
- ML20101D066 + (ML20101D066)
- ML20101D067 + (ML20101D067)
- ML20101D072 + (ML20101D072)
- NG-96-0624, Monthly Operating Rept for Feb 1996 for DAEC + (ML20101D073)
- NRC-96-0020, Monthly Operating Rept for Feb 1996 for Fermi 2 + (ML20101D075)
- ML20101D076 + (ML20101D076)
- ML20101D083 + (ML20101D083)
- ML20101D093 + (ML20101D093)
- 05000354/LER-1996-003, :on 960214,failure to Perform Rcics Surveillances Condition Prohibited by Ts.Caused by Inadequate Review & Testing of Procedures.Surveillance Procedure Revised & Testing of Subject Valves + (ML20101D096)
- ML20101D098 + (ML20101D098)
- ML20101D108 + (ML20101D108)
- TXX-9220, Final Deficiency Rept CP-92-03 Re Potential Loss of RHR Due to Flooding.Walkdown in Affected Rooms Determined That Leakage from Duct Mechanical Joints Would Not Be Directed at Any Shutdown Equipment & That No Safety Hazard Exists + (ML20101D119)
- ML20101D122 + (ML20101D122)
- ML20101D131 + (ML20101D131)
- ML20101D136 + (ML20101D136)
- ML20101D150 + (ML20101D150)
- ML20101D151 + (ML20101D151)
- ML20101D154 + (ML20101D154)
- ML20101D162 + (ML20101D162)
- RBG-42657, Monthly Operating Rept for Feb 1996 for River Bend Station, Unit 1 + (ML20101D173)
- ML20101D174 + (ML20101D174)
- ML20101D176 + (ML20101D176)
- ML20101D182 + (ML20101D182)
- ML20101D189 + (ML20101D189)
- ML20101D196 + (ML20101D196)
- ML20101D203 + (ML20101D203)
- ML20101D209 + (ML20101D209)
- 05000254/LER-1996-006, :on 960210,TS 3.0.A Incorrectly Invoked Due to Procedural & Operator Knowledge Deficiencies.Policy Statement Developed & Presented to Licensed Operator Re Expectations for Use & Entry Into TS 3.0.A + (ML20101D217)
- ML20101D220 + (ML20101D220)
- ML20101D225 + (ML20101D225)
- RBG-19625, Interim Deficiency Rept DR-193 Re ECCS Suction Lines in Auxiliary Bldg.Next Rept Will Be Provided by 850220 + (ML20101D226)
- RBG-19628, Interim Deficiency Rept DR-238 Re Installation of Pacific Scientific Snubbers (PSA 35 & 100) & Associated Bergen- Paterson Clamps (PT 6220-50 & PT 6202-120).Next Rept Will Be Provided by 850221 + (ML20101D228)
- RBG-19629, Interim Deficiency Rept DR-168 Re Interpretation of W3 Welding Procedure for Performing Weld Repair.Next Rept Will Be Provided by 850221 + (ML20101D239)
- ML20101D241 + (ML20101D241)
- JAFP-92-0435, Special Rept:On 920504,CO2 Fire Suppression Sys Declared Inoperable When Walkdown Revealed That 4 Instead of 5 Nozzles Installed in Sys.Caused by Absence of Design Calculations.Replacement Nozzle Installed on 920518 + (ML20101D243)
- ML20101D245 + (ML20101D245)
- ML20101D258 + (ML20101D258)
- ML20101D263 + (ML20101D263)
- RBG-19626, Interim Deficiency Rept DR-228 Re Cylinder Head Valves in Standby Diesel Generator 1EGS*EG1A Supplied by Tdi.Next Rept Will Be Provided by 850221 + (ML20101D269)
- ML20101D274 + (ML20101D274)
- 05000373/LER-1984-076, :on 841111,undervoltage Trip of Reactor Protection Sys Bus a Occurred.Caused by Deenergized Relays & Ruptured Hose.Regulating Transformer Installed to Limit Undervoltage Condition + (ML20101D275)
- 05000454/LER-1984-010-08, :on 841112,boron Dilution Protection Sys Actuated.Caused by Noise Spike Due to Pulling Fuse.Mod to Boron Dilution Protection Sys Being Designed + (ML20101D277)
- ML20101D279 + (ML20101D279)
- ML20101D281 + (ML20101D281)
- ML20101D282 + (ML20101D282)
- ML20101D294 + (ML20101D294)
- ML20101D300 + (ML20101D300)
- ML20101D301 + (ML20101D301)
- ML20101D302 + (ML20101D302)
- ML20101D307 + (ML20101D307)