NRC-96-0020, Monthly Operating Rept for Feb 1996 for Fermi 2

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Feb 1996 for Fermi 2
ML20101D075
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 02/29/1996
From: Giles H, Goodman L
DETROIT EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CON-NRC-96-0020, CON-NRC-96-20 NUDOCS 9603190364
Download: ML20101D075 (4)


Text

_ _ _ _ _ _-

l

  • ;e *

,g DOITOll rermi2 '#

Edison EEES# W a:%.

Reg Guide 1.16 March 15,1996 NRC-96-0020 I

U. S. Nuclear Regulatory Commission i Attention: Document Control Desk Washington D. C. 20555

Reference:

Fermi 2 NRC Docket No.50-34i NRC Operating License No. NPF-43

Subject:

Monthly Ooerating Status Reoort for Febmary.1996 Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for February,1996. This report includes the Operating Data Repon, Average Daily Unit Power Level, and the Summary of Unit Shutdowns and Power Reductions identified in NRC Regulatory Guide 1.16 and Fermi 2 Technical Specification 6.9.1.6.

Ifyou have any questions, please contact Harry Giles, at (313) 586-1522.

Sincerely, Lynne S. Goodman Director - Nuclear Licensing 190044 Enclosure l

I cc: T. G. Colburn D. R. Hahn M. J. Jordan .

H. J. Miller A. Vegel ,5,f M. V. Yudasz, Jr.

Region III V ,! g 9603190364 960229 ,

PDR ADOCK 05000341

) R PDR

OPERATING DATA REPORT DOCKET NO.30-341 COMPLETED BY H. B. Giles  ;

DATE March 15.1996 TELEPHONE (313) 586-1522 OPERATING STATUS 1 Unit name: Fermi 2 NOTES: (1) Calculated using weighted averages to reflect variations in rating (MDC and DER). (2) Currently limiting power to 96%

2. Reporting period: February.1996 CTP maximum due to turbine limitations.  ;
3. Licensed thermal power (MWt): 3430 Nameplate and DER ratings reflect 98% CTP
4. Nameplate rating (Gross MWe): 1179 due to turbine throttle valve limitations.  ;
5. Design elect rating (Net MWe): 1LL6

]

6. Max dependable cap (gross MWe): 924
7. Max dependable cap (Net MWe): 876
8. If changes occur in capacity ratings (Items number 3 through 7) since last report, give reasons:

N/A

9. Power level to which restricted, if any (MWe Net): (2)
10. Reasons for restriction, if any: (2)

THIS MONTIl YEAR TO CUMULATIVE '

DATE

11. Hours in reporting period 696 1.440 71.030
12. Hours reactor was critical 696 1.440 49.791.60
13. Reactor reserve shutdown hours Q Q Q
14. Hours generator on-line 696 1.440 47.076.30
15. Unit reserve shutdown hours Q Q Q
16. Gross thermal energy gen (MWH) 2.279.448 4.676.544 144.287.747
17. Gross elect energy gen (MWH) 634.880 1.302.270 46.692.787
18. Net Elect energy gen (MWH) 605.085 1.240.838 44.606.307
19. Unit service factor 100.0 100.0 66.3
20. Unit availability factor 100.0 100.0 66.3
21. Unit cap factor (using MDC net) 99.2 98.4 60.0 (1.)

22- (Jnit cap factor (using DER net) 2_7_ 9 77.2 57.0 (1)

23. Unit forced outage rate 0 0 20.9
24. Shutdowns scheduled over next 6 months (Type, Date, Duration of each):
25. If shutdown at end of report period, estimated date of startup:
26. Units in test status (prior to commercial operation):

FORECAST ACillEVED Initial Criticality N/A N/A Initial Electricity N/A N/A Commercial Operation N/A N_/A

I

, AVERAGE DAILY UNIT POWER LEVEL l

DOCKET NO. 50-341 UNIT Fermi 2 DATE March 15.1996 COMPLETED BY H. B. Giles TELEPHONE (313) 586-1522 Month ' February.1996 DAY AVERAGE DAILY DAY AVERAGE DAILY POWER POWER LEVEL LEVEL (MWe-Net) (MWe-Net) 1 874 16 872 2 872 17 874 3 875 18 839 4 874 19 877 5 874 20 877 6 874 21 877 l

7 872 22 877

! 8 874 23 864 9 874 24 862 10 758 25 870 11 873 26 877 12 873 27 876 13 874 28 877

, 14 874 29 877 i

i 15 868

UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-341 DATE h1 arch 15.1996 UNIT NAh1E Fermi 2 COh!PLETED BY H. B. Giles TELEPHONE (313) 586-1522 REPORT h1ONTH February.1996 No. (6) Date TYPE Dur (Hrs) (7) Reason (2)' h1eth % of LER Sys Code (4) Comp Cause and Corrective (1) shutting down No. Code Action to Prevent reactor or (5) Recurrence reducing power (3)

R96-02 960210 S 0 B 5 N/A SB HX Reduce Rx power to 65% to repair a Feedwater Heater No.

5 north steam leak and to replace the No. 3 low pressure turbine intercept valve accumulator low pressure switch.

(I) F: Forced (2) REASON: (3) hfETHOD: (4) Instructions for preparation of data S: Scheduled A - Equipment Failure (Explain) 1 - hianual entry sheets for Licensee Event Report B - hiaintenance or Test 2 - hfanual Scram (LER) file (NUREG-1022)

C - Refueling 3 - Automatic Scram D - Regulatory Restriction 4 - Continued (5) Same Source as (4)

E - Operations Training and License 5 - Reduced Load Examination 9 - Other (6) R - Prefix indicates power reduction.

F - Administrative S - Prefix indicated plant shutdown.

G - Operational Error (Explain)

H - Other (Explain) (7) Duration of reductions reported as zero per Regulatory Guide 1.16, Revision 4 4


- - - - - - ~