Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20101B206 + (ML20101B206)
- ML20101B207 + (ML20101B207)
- BVY-96-018, Monthly Statistical Rept for Feb 1996 for VT Yankee Nuclear Power Station + (ML20101B216)
- 05000368/LER-1992-003-02, :on 920501,initiated Manual Reactor Trip After Mismatch in Charging & Letdown Flowrates Observed.Cause Unknown.Cause for Recurring High Dp Identified by 920901. Procedure 2203.012L Revised + (ML20101B219)
- 05000382/LER-1992-003-03, :on 920327,unplanned Actuation of ESF Portion of Control Room Ventilation Sys (CRVS) Occurred,Causing CRVS to Isolate.Cause Not Determined.New resistor-capacitor Filters Installed + (ML20101B221)
- 05000336/LER-1990-005, :on 900503,notified of Potential High Energy Line Break Via as Sys in Safety Related Areas.Caused by Inaccurate Conclusions Drawn from 1973 Rept.As Sys Removed from Svc & Plant Mods Initiated + (ML20101B225)
- ML20101B235 + (ML20101B235)
- ELV-03024, Application for Amends to Licenses NPF-68 & NPF-81,changing TS Sections 3.0 & 4.0 Re LCO & Surveillance Requirements to Eliminate Unnecessary Restrictions on Mode Changes,Per Generic Ltr 87-09 + (ML20101B237)
- ML20101B242 + (ML20101B242)
- ML20101B243 + (ML20101B243)
- ML20101B244 + (ML20101B244)
- 05000277/LER-1992-008, :on 920430,determined That Circulating Water Composite Samplers Were Out of Svc.Caused by Equipment Malfunction.Circulating Water Intake & Discharge Sampling Devices Have Been Repaired & Returned to Svc + (ML20101B247)
- BECO-84-203, Application for Amend to License DPR-35,consisting of Proposed Change 84-14 to Modify Tech Spec Primary Containment Oxygen Concentration to Conform W/ Recommendations of Generic Ltr 84-09 + (ML20101B248)
- 05000327/LER-1992-010, :on 920428,turbine Tripped as a Result of a Loss of Load.Caused by Failure of Sudden Pressure Switch. Personnel Diagnosed Plant Condition & Took Actions + (ML20101B252)
- ML20101B255 + (ML20101B255)
- ML20101B260 + (ML20101B260)
- ML20101B271 + (ML20101B271)
- 05000425/LER-1992-009-01, :on 920507, a MFP Was Tripped & Out of Svc While Being Filled & Vented.Caused by Failure to Maintain MFP Lube Oil Temp.Procedures 14992-1 & 2 Will Be Enhanced by 920630 + (ML20101B274)
- ML20101B277 + (ML20101B277)
- 05000266/LER-1992-003-01, :on 920428,EDG G01 Automatically Started When Potential Transformer for Supplied Bus Deenergized.Caused by Personnel Error.Addl Loads on Bus 1B04 Secured & Isolated & Buses 1B03 & 1B04 Reenergized + (ML20101B279)
- 05000327/LER-1992-011, :on 920429,unit Experienced Safety Injection Signal While Preparing for Reactor start-up.Caused by Failure in steam-dump Control Circuitry.Equipment That Caused Actuation of steam-dump Valves Replaced + (ML20101B283)
- ML20101B285 + (ML20101B285)
- ML20101B288 + (ML20101B288)
- ML20101B289 + (ML20101B289)
- 3F0396-08, Submits ISI Program Relief Request 95-030,Suppl 2,revising Response to RAI Re Reactor Vessel Stress in Structural Integrity Rept SIR-95-135 + (ML20101B290)
- ML20101B293 + (ML20101B293)
- 05000259/LER-1992-002-05, :on 920324,reactor Protection Sys Experienced Unexpected Failure,Causing Actuation of Esf.Cause Not Determined.Bus 1B Placed on Alternative Power,Alarms Reset & ESF Actions Returned to Normal + (ML20101B299)
- SNRC-1123, Forwards Executed Amend 1 to Indemnity Agreement B-87 + (ML20101B301)
- ML20101B303 + (ML20101B303)
- ML20101B305 + (ML20101B305)
- ML20101B313 + (ML20101B313)
- 05000302/LER-1992-004, :on 920428,emergency Feedwater Block Valves Failed to Close During Differential Pressure Testing.Caused by Normal Valve Wear & Inadequate Motor Operator Capabilities.Cable Combinations Modified + (ML20101B314)
- 05000219/LER-1992-004, :on 920424,discovered That Testing Methodology for Flow Converter Units for RPS Resulted in Loss of High Recirculation Flow Scram Protection.Caused by Procedural Inadequacy.Surveillance Procedure Revised + (ML20101B318)
- 05000413/LER-1984-020-02, :on 841112,0928 & 1020,Mode 4 Entered W/ Unacceptable Test Results on Certain Fuses Associated W/ Containment Electrical Penetrations.Caused by Personnel Error + (ML20101B323)
- ML20101B331 + (ML20101B331)
- PY-CEI-NRR-1505, Forwards Licensee Event Repts 92-010 & 92-011 for Perry Nuclear Power Plant + (ML20101B332)
- 05000440/LER-1992-010, :on 920430,inadvertent Outboard Balance of Plant Containment Isolation Occurred.Caused by Inadequate Work Order.Personnel Assisted in Investigation & Have Been Made Aware of Errors + (ML20101B339)
- 05000440/LER-1992-011, :on 920503,two IRM Channels Became Inoperable Due to Failure to Complete TS 3.3.1 Surveillance Requirements.Caused by Personnel Error.Plant Licensed Operators Will Be Instructed on Lessons Learned + (ML20101B341)
- ML20101B346 + (ML20101B346)
- ML20101B355 + (ML20101B355)
- ML20101B369 + (ML20101B369)
- ML20101B375 + (ML20101B375)
- ML20101B381 + (ML20101B381)
- 05000219/LER-1984-027, :on 841103,during Startup,Standby Liquid Control Sys Vol/Concentration Below Tech Spec Min Limit. Caused by Personnel Error & Improper Procedures.Chemicals Added & Procedures Will Be Improved + (ML20101B385)
- 1CAN128403, Forwards Info Re Insp Techniques to Be Employed for Exam of 10 Sleeved once-through Steam Generator Tubes,Per 841010 Commitment + (ML20101B391)
- ML20101B395 + (ML20101B395)
- HL-2204, Submits Proposed Schedule for Addressing Items in App a of Se, ,of Second 10-yr Insp Insp Interval,Per 920416 Telcon W/Nrc.Response/Revised Relief Request for Table 1 & 2 Items Will Be Submitted by 920605 + (ML20101B398)
- ML20101B403 + (ML20101B403)
- HL-2229, Responds to NRC Re Violations Noted in Insp Repts 50-321/92-08 & 50-366/92-08.Corrective Actions:Design Change Request 92-075 Implemented to Install Jumpers Around Thermal Overload Devices of 12 Unit 1 motor-operated Valves + (ML20101B404)
- ML20101B416 + (ML20101B416)
- ML20101B422 + (ML20101B422)