New Hampshire Yh hh Yed C. Feigenbovm President and Chief Executive Officer NYN; 92066 May 25,1992 United States Nuclear Regulatory Commission WashNgton, D.C.
20555 Attention:
Document Control Desk
References:
(a)
Facility Operating License No. NPF-86, Docket No. 50 443 (b)
NHY Letter dated June 9,1986 "Scabrook Station Turbine Inspection Program' G. S. Thomas to NRC (c)
NUREG 0896, Supplement No. 5 " Safety Evaluation Report Related to the Operation of Seabrook Station Units 1 and 2* July 1986
Subject:
Seabrook Station Turbine Overspeed Protection Maintenance and Testing Program Gentlemen:
New Hampshire Yankee has enclosed a copy of the Seabrook Station Turbine Overspeed Protection Maintenance and Testing Program, Revision 0.
New Hampshire Yankee committed to submit this program within three years of obtaining an operating license [ Reference (b)]. The NRC documented this commitment in Supplement No. 5 to the Safety Evaluation Report [ Reference'(c)] as follows:
3.5.1.3 Turbine Missiles By letter dated June 9, 1986, the applicant committed te, adoff a turbine maintenance program recommended by the manufacturer based on turbine-missile generation. On the basis of this commitment, the applicant will submit for NRC approval, within 3 years of obtaining an operating license, a turbine system maintenance program.- The contents of this program will be based on the manufacturer's _ calculations of missile generation ' probabilities.
If the applicant is unable to provide the turbine system maintenance program as described above, the staff will require the applicant to volumetrically inspect
-i all low-pressure turbine rotors at the second refueling outage, as stated in Section 3.5.1.3 _ of the SER, and every other- (alternate) refueling outage thereafter until-some other maintenance program is approved by the staff.
i l
.. ; iW ' O 9206010094 92Cc25
~
h\\
DR ADOCK 05000443
-PDR
.New Hampshire Yankee Division of Public Service Company of New Hampshire l
P.O. Box 300
- Seabrook, NH 03874
- Telephone (603) 474 7521
l United States Nuclear Regulatory Commission May 25,1992 Attention:
Document Control Desk Page two The enclosed program document describes the basis for the Turbine Maintenance and..
Testing Program-for Seabrook Station Unit 1. - This program encompasses periodic tests and inspections to preclude generation of turbine missiles as a result of material defects or turbine overspeed.
Inspection and testing intervals are based on the Seabrook Station Updated Final Safety Analysis Report (Section 10.2), the Seabrool Station Unit 1 Safet)-
Evaluation Report and the manufacturer's recommendations referenced in the program document.
As New llampshire Yankee acquires more operating exper'e.nce combined with industry experience and technological changes the maintenance program may-be revised. Changes to the program will be reviewed and approved by the Station Manager and the_ Executive Director Nuclear Production. A summary report of inspections aerformed in accorc'ance with thic program will be completed following each refueling outage and will be a_vailable for NRC review. The enclosed turbine maintenance program document completes NilY's commitment to submit its turbine maintenance progrr.m within three years of obtaining-an operating license.
Should you have any questions regarding this letter please contact Mr. James M.
Peschel, Regulatory Compliance Manager, at (603) 474 9521 extension)M2 w Very _ t ly yours, J ?d(
%W W
s Ted C. Feigenbwm Enclosure a
TCF: A LL/ss i
.i cc:
Mr. Thomas T. Martin Regional Administrator U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Mr. Gordon E. Edison, Sr. Project Manager l
Project Directorate 1-3 Division of Reactor Projects U.S. Nuclear Regulatory Commission Washington, DC 20555 Mr.- Noel Dudley NRC Senior Resident Inspector P.O. Box 1149 Seabrook, NH 03874 L
.. -. ~. -.
New-Hampshire Yankee
~ May 25,1992 -
ENCI.OSURE TO NYN 02066 i.
t
{
I i
t-I