h W4pLF CREEK NUCLEAR OPERATING CORPORATION Otto L. Maynard Vice Prtisdent Plant Operations March 11, 1996 WO 96-0040 l
U. S lear Regulatory Commission ATTN.
acument Control Desk Mail Swation P1-137 f
Washington, D.
C.
20555
Subject:
Docket No. 50-482:
Revision 9 of the Wolf Creek Updated Safety Analysis Report Gentlemen:
The enclosure to this letter provides the submittal of the Wolf Creek Updated Safety Analysis Report (USAR), Revision 9.
This submittal satisfies the Final Safety Analysis Report (FSAR) updating requirement of 10 CFR 50.71 (e) (4). Ten additional copies of the IMAR, Revision 9, have been shipped to the Document Control Desk as required by 10 CFR 50.4, 10 CFR 50.34, 10 CFR 50. 54 (a) (3), and 10 CFR 5 0. 71 (e).
Specific technical changes that have been made since issuance of the USAR, Revision 8,
are described in Attachment 1 to this letter.
In addition to these technical changes, several editorial changes have been made and are included in this revision.
This revision includes a clarification to Section 9.1.3 and 9.1A to better describe a typical refueling at Wolf Creek Generating Station (WCGS).
000 tion 9.1.3 originally described a normal refueling as one in which approximac.ely 80 assemblies are transferred to the Spent Fuel Pool.
This section also states that the entire core may be transferred.
During a typical refueling at WCGS, the full core is offloaded to the Spent Fuel Pool. This is a normal evolution that has been evaluated as described in Section 9.1A.
However, Scction 9.1.3 of the Callaway Safety Evaluation Report, NUREG-0830, describes the full core offload as an " emergency core offload." This NUREG is also applicable to Wolf Creek Generating Station.
Wolf Creek Nuclear Operating Corporation does not consider the full core offload to be an emergency condition.
Therefore, the wording in the USAR has been clarified to dif ferentiate between a full core offload and a partial offload (versus " normal").
9603140199 960311 PDR ADOCK 05000482
/
K PDR Q,9 '.
14001U iT
)
)\\
PO. Box 411/ Bunington, KS 66839 / Phone: (316) 364-8831 An Equal Opportunity Ernployer M F/HC/ VET
m l
- WO 96-0040 l
Page 2 of 2
.i If you have any questions concerning. this matter, please contact me at (316).364-8831, extension'4450s or Mr. Richard D. Flannigan at extension 4500.
Very truly yours, C
f
[
Af l
Otto L. Maynard i
i OLM/jra i
Attachment i
' Enclosure (Updated Safety Analysis Report) cc:
L. J. Callan (NRC), w/a, w/e i
W. D. Johnson (NRC), w/a, w/e J. F. Ringwald (NRC), w/a, w/e J. C. Stone (NRC), w/a, w/e
-i l.
I l
i t
i i
l l
l' l
l l
l l
l l
l 1
l
STATE OF KANSAS
)
)
SS COUNTY OF COFFEY
)
Otto L. Maynard, of lawful age, being first duly sworn upon oath says that he is Vice President Plant Operations of Wolf Creek Nuclear Operating Corporation; that he has real the foregoing document and knows the content thereof; that he has executed that same for and on behalf of said Corporation with full power and authority to do so; and that the facts therein stated are true and correct to the best of his knowledge, infortr tion and belief.
8 By
/
A z /f h Ot 6 L.'Ma/Enar'd 7~
~
Vice President Plant Operations SUBSCRIBED and sworn to before me this lk day of 8 N, 1996.
N@.
b di MARY E. GIFFORD Notary Public-Staf 3 of Kansas
,My Appt Expires ll)04 $99 Expiration Date iEl04.MS i
Attachment to WO 96-0040 Page 1 of 18 USAR Change Request Description 94446 INCORPORATES RELOCATED TECHNICAL SPECIFICATION SECTIONS INTO USAR CHAPTER 16, AS DESCRIBED IN NA 94 0089.
Page-3A-57 Page.
CHAPTER 16 94-122 REVISES FIGURE TO ADD COMPONENT NUMBERS, TEST VALVES AND SHOW CORRECT DRAIN CONFIGURATION Figure 9.2-17 Sheet 1 94-127 REVISES USAR TO REPLACE SPECIFIC PROCEDURE NUMBERS AND TITLES WITH A STATEMENT INDICATING THAT THE ASSOCIATED ACTIVITY OR CONTROL IS CONTROLLED BY AN ADMINISTRATIVE PROCEDURE.
Page-17.2-18 Page:
13 1-26 Page 13.2-25 Page:
13220 Page' 13.2 19 Page:
13.2-18 Page:
13.2 16 Page:
132-8 Pag.s 13 2-1 Table:
52-5 Sheet 2 95-001 REVISES QUALITY ASSURANCE PROGRAM TO REFLECT A CHANGE IN THE REPORTING MECHANISM FOR IN-PLANT NONCONFORMANCES FROM THE CORRECTIVE WORK REQUEST TO THE NONCONFORMANCE REPORT. ALSO REFLECTS CHANGES IN ORGANIZATION.
Page:
17.2-56 Page:
17.2-55 Page:
17.2-54 Page.
17.2 50 Page.
17.24g Page 17.248 Page.
17.2-46 Page:
17.0-iv 95-003 REVISES CHAPTER 3A AND SECTION 5.4 TO CLARIFY INTENDED SCHEDULE OF REACTOR REACTOR COOLANT PUMP i
MOTOR FLYWHEEL 10-YEAR EXAMINATIONS Page 5 4-11 Page.
3A 7 95-005 REVISES FIGURE TO DELETE 2 INCH RURAL WATER DISTRICT LINE Page:
9.2 28 Figura.
9 2-5A Sheet-95-006 ADDS DESCRIPTION OF 10 CFR 50.55A(F) ON TABLE 1.3-4. ALSO CORRECTS REFERENCES TO THIS SECTION IN OTHER
~
CHAPTERS OF THE USAR P ge' 5225 Page-3 9(B)-21 T(bla:
1.3-4 Sheet 17 95-008 REVISES DESCRIPTION TO REFLECT INCREASED ECCS FLOWRATES Page-15 5-7 Page 15 6-4 Page 15 5-3 Page.
15 5-2 Tgbe 15 5-1 Sheet 1 Fgura:
15 6-3 Sheet Fgure 15 6-2 Sheet Figure 15 5-1 Sheet
Attachment to WO 96-0040 Page 2 of 18 USAR Change Request Description 95414 REVISES FIGURE TO CORRECT DAMPER NUMBERS Figurr 94-3 Sheet 5 95-015 REVISES CHAPTER 4 TO REFLECT CHANGES IN CYCLE 8 FUEL ASSEMBLIES Page-4.2-16 Page' 4 2-15 Page:
4.11 Table 43-1 Sheet 2 Table' 43-1 Sheet i Table-41-1 Sheet 4 Table:
41-1 Sheet 3 Fguri 4.2-15 Sheet Figure:
4.2 12 Sheet Figure:
4.2-11 Sheet Figure:
4.2-10 Sheet Figuri 4.2-9 Sheet Fgure-4.2-7 Sheet Figure.
42-6 Sheet Figure:
4.2-5 Sheet Fgury 424 Sheet Fgure:
4.23 Sheet Figure:
4 2-2A Sheet Figure.
42-1 Sheet 95-018 REVISES FIGURE TO RESTORE LEGIBILITY Figurt 95-1 Sheet 1 95-017 REVISES FIGURE TO ADD POST ACCIDENT SAMPLING SYSTEM REFRIGERATION UNIT COMPRESSOR Fourt 1.2-11 Sheet 95-018 REVISES FIGURE TO REFLECT MODIFICATION WHICH REPLACES THE EXISTING STEAM PRESSURE / FEED PRESSURE METER ON PANEL RLOOS OF THE MAIN CONTROL BOARD AND INSTALLS A NEW DUAL METER TO MONITOR STEAM / FEED PRESSURE AND A DIFFERENTIAL PRESSURE METER WHICH WILL MONITOR STEAM / FEED DIFFERENTIAL PRESSURE Figurr 10.3-1 Sheet 3 95 019 REVISES TABLE 311(B) TO ADD NEW WESTINGHOUSE SPECIFICATION NUMBER FOR SOURCE AND INTERMEDIATE RANGE EXCORE DETECTORS Table.
3.11(B)-3 Sheet 157 Table 311(B) 3 Sheet 156 95-020 REVISES COMMITMENT TO REGULATORY GUIDE 1.143 FOR HYDROSTATIC TESTING OF D' AUGMENTED PIPING SYSTEMS Table.
3.2-5 Sheet 6 95-021 REVISES FIGURE TO CHANGE N2 STROKE TIME LIMIT OF MAIN STEAM LINE DRAIN VALVES FROM 5 TO 10 SECONDS Fgury 624-1 Sheet 4 Fgure.
6.24-1 Sheet 3 Figure 6.24-1 Sheet 2 Fgure-6.241 Sheet 1
Attachment to WO 96-0040 Page 3 of 18 USAR Changa Request Description 95-023 REVISES FIGURE TO REFLECT AS-BUILT CONDITION F$ur2:
10 4-6 Sheet 4 95 024 REVISES FIGURE TO REFLECT CAP RATHER THAN HOSE CONNECTION DOWNSTREAM OF REACTOR MAKE-UP WATER TO REFUELING POOL CLEAN-UP ISOLATION VALVES Figura:
9 2-13 Sheet 95-025 REVISES FIGURE TO REFLECT AS-BUILT CONFIGURATION Figur):
969-1 Sheet 4 95-026 REVISES DISCUSSION 10 ALLOW THE USE OF ENCAPSULATION CLAMPS ON REMAINING OR SPARE CORE EXIT THERMOCOUPLE OR ACTIVE CONTROL ROD DRIVE MECHANISM PENETRATION Page:
5236 95 030 REVISES FIGURES AND DESCUSSION TO REFLECT A PERMA **ENT FEEDWATER CORROSION PRODUCT SAMPLE PANEL Page-9 3-11 Table.
93-5 Sheet 1 Table.
9 2-24 Sheet i Fgurs 9214 Sheet Fgure:
93-4 Sheet 1 Figure:
10 4-6 Sheet 5 95-035 REVISES FIGURE TO REFLECT REMOVAL OF FENCE Figura:
1 2-44 Sheet 95-038 REVISES FIGURE TO REFLECT THE ADDITION OF A HOT TAP CONNECTION IN THE CIRCULATING WATER PIPING TO ALLOW FOR ON-LINE MECHANICAL CONDENSER TUBE CLEANING Fige 10 4-1 Sheet 2 95-039 REVISES FIGURE TO REFLECT THE ADDITION OF A RESIN SAMPLE VALVE TO THE RESIN TRANSFER LINE Figura:
10 4-5 Sheet 1 95-040 REVISES REFERENCE TO CODE CASE REVISION FROM N-498 TO N 498-1 BASED ON NRC APPROVAL Page 66-5 Page-66-3 Page' 5 2-32 Page-3 9(N)-19
i Attachment to WO 96-0040 Page 4 of 18 1
l USAR Change Request Description 95-041 REVISES FIGURE TO REFLECT REMOVING ABANDONED PlPING FROM THE WAREHOUSE TO THE PUMP HOUSE AND ASSOCIATED VALVE 1FP0615 Figure 95-1 Sheet 3 Fgure.
95-2 Sheet 95-042 REVISES CHAPTER 13 TO REFLECT CHANGE IN ORGANIZATION DUE TO THE RETIREMENT OF VICE PRESIDENT ENGINEERING Page 13 1-11 Page:
13.1-10 Page-13.1 9 Page-1318 Page 13 1-7 Page.
1316 Page.
1315 Figurz 1311 Sheet 95443 REVISES FIGURE TO REFLECT REMOVAL OF VALVE FROM ABANDONED FIRE PROTECTION LINE Fgura:
95-1 Sheet 3 Fgure-95-2 Sheet
)
l 95-045 REVISES CHAPTER 17 TO EMPHASIZE THE COMMITMENT TO N45.2.11 IN THE CONFIGURATION CHANGE PROCESS l
Page-17211 1
95-046 REVISES CHAPTER 10 TO REFLECT CHANGES MADE IN AMENDMENT 85 OF THE LICENSE. THIS CHANGE REPLACES AUTOMATIC MODE WITH STANDBY IN SECTION 10.4 9.2.3 j
Page 10 4-50 W447 REVISES PAGE 1.2-13 TO ADD AMSAC INFORMATION Page.
1.2 13 95 048 REVISES CHAPTER 13 TO REFLECT CHANGES IN ORGANIZATION Page.
17.2-54 Page.
13.1-9 Page:
13 1-6 Page.
13.1-7 Page-131-6 Page:
13.1-5 Fgura:
13.1 1 Sheet
Attachment to WO 964040 Page 5 of 18 USAR Change Request Description 95-049 REVISES CHAPTER 13 AND 17 TO REFLECT CHANGES IN ORGANIZATION Page' 17 2-17 Page:
17.2-28 Page:
17.2-2 Page:
17.2 25 Page.
17.2-24 Page 17.2-23 Page' 17.2-58 Page-17.2-19 Page.
17.2-30 Page:
17.2-16 Page:
17.2-15 Page:
17.2 14 Page 17.2 13 Page:
17.2 10 Page:
17.2-9 Page:
17.2-7 Page:
17.2 3 Page-17? 21 Page:
17.2-48 Page:
17.2-57 Page-17.2-56 Page.
17.2-55 Page 17.2 54 Page:
17.2 51 Page-17.2 26 Page:
17.2-49 Page:
17.2 31 Page:
17.247 Page:
17.2-46 Page:
17.2-43 Page.
17.2 42 Page:
17.2-40 Page:
17.2-35 Page:
17.2-34 Page:
17.2-32 Page:
17.2-50 T ble.
1721 Sheet 2 Table:
17.2-1 Sheet 1 55 diH)
~ REVISES CHAPTER 13 TO REFLECT CHANGES TO THE OPERATIONS ORGANIZATION Page' 13121 Page' 13.1 20 Page.
13.1 19 95-051 REVISES FIGURES TO REFLECT ADDITION OF PUBLIC ADDRESS SYSTEM SPEAKERS IN THE COUNT ROOM, AUXILIARY BUILDING SAMPLING ROOM AND THE PASS PANEL ROOM.
Figura.
952-2 Sheet 95-052 REVISES ROOM TEMPERATURE AND HUMIDITY FOR HVAC EQUIPMENT ROOMS Tobie 311(B)-2 Sheet 5 95-053 REVISES FIGURE TO REFLECT ENHANCEMENTS TO THE SECONDARY LIQUID WASTE OIL INTECEPTOR TO IMPROVE SLUDGE REMOVAL FROM THE TANK Figure 10 4-12 Sheet 1 95-055 REVISES FIGURE TO REFLECT THE DEACTIVATION OF THE STEAM GENERATOR INLET ELBOW WHIP RESTRAINTS AND THE REPLACEMENT OF EIGHT REACTOR COOLANT PUMP TIE ROD PINS WITH DIMENSIONALLY MODIFIED PINS Page:
5 4-59 F6gurs 5 4-20 Sheet 96-056 REVISES FIGURES TO REFLECT AS-BUILT CONFIGURATION OF LIQUID RADWASTE DEMINERALIZER SKID HOSE CONNECTIONS Figura 11 4-1 Sheet 1 Fgure 11.2 1 Sheet 3 Fgure 1.1-1 Sheet 2 F
l I
Att:chment to WO 96-0040 Page 6 of 18 USAR Change Request Description 95-058 REVISES DESCRIPTION OF REFUELING MACHINE AUXILLIARY HOIST TO REFLECT A CHANGE IN SPEED FROM A TWO SPEED TO A FIVE SPEED HOIST Page-9 1-32 Table 91-7 Sheet 2 96459 REVISES FIGURE TO REFLECT CORRECT NUMBER CONFIGURATION FOR MAIN CONTROL BOARD CONTROL SWITCHES Figura.
9215 Sheet 2 95460 REVISES CHAPTER 13 TO REFLECT CHANGE IN PERSONNEL Page-13 1-22 95-061 REVISES TABLE TO DELETE CALLAWAY INFORMATION J
Table 9 50-2 Sheet 19 Table' 9 5B-2 Sheet 5 Table:
9 58-2 Sheet 4 Ttble-9 5B-2 Sheet 3 Table-958-2 Sheet 2 95-062 REVISES ORGANIZATION TO ADD A SHIFT SUPERVISOR Page 13121 95463 REVISES ORGANIZATION TO REFLECT CHANGES IN ENGINEERING Page.
17.2-43 Page.
17.2-31 Page:
17.2 30 Page~
17.2-28 Page-17.2 7 Page:
13.1-9 Page:
13.1-8 Page:
13.1 7 Page 13.1-6 Page:
1315 Figura:
1311 Sheet 1 l
95464 REVISES DESCRIPTIONS OF ESSENTIAL SERVICE WATER VALVE EFHV059 TO REFLECT NORMAL AND OPERATING POSITIONS Page:
929 Ttbie 3 9(B)-16 Sheet 16 Figure 92-2 Sheet 2 95-065 REVISES FIGURES TO REFLECT CHANGES IN VALVE SYMBOLS AND TO IDENTIFY AN EXISTING INSTRUMENT HEADER ISOLATlON VALVE 1
Figurs 943 Sheet 4
Attachment t)WO 96-0040 Page 7 of to USAR Change Request Description REVISES FIGURE TO REFLECT FLOW INSTRUMENTS EFFf0003 AND EFFl0004 SPARED IN PLACE 95-066 Figurr 92-2 Sheet 4 95-067 REVISES FIGURE TO REFLECT CORRECT LOCATION OF CASING DRAIN LINES f
hguri:
112-1 Sheet: 1 REVISES FIGURE TO REFLECT MODIFICATION TO THE CONFIGURATION OF THE SENSING TUBING FOR LUBE OIL 95-068 RESERVOIR VAPOR EXTRACTOR DIFFERENTIAL PRESSURE SWITCHES Figurs:
10 2-1 Sheet 5 95-069 REVISES FIGURE TO REFLECT CHANGE IN ORIFICE SIZE AND CHANGE IN MATERIAL OF PIPE AND ELBOW DOWN STREAM OF ORIFICE FLANGE IN FIRE PROTECTION SYSTEM Figury 951 Sheet i 96-070 REFLECTS THE DELETION OF THE BORON INJECTION TANK INLET BYPASS VALVES AND THE REPLACEMENT OF SOLENOID OPERATED VALVES WITH MOTOR OPERATED VALVES (ALTERNATE SEAL INJECTION VALVES AND EXCESS LETDOWN VALVES Page:
9 3-87 Page:
9 3-68 Page:
9.3-64 Page:
9.3-63 Table' 3.11(BF3 Sheet 39 Table:
39sNF11 Sheet 6 Table:
3.11(B)-7 Sheet 4 Table-311(B)-8 Sheet 4 Table:
3.11(B) 8 Sheet 5 Table:
3.11(BF3 Sheet 23 Table.
311(B)-3 Sheet 25 Table:
3 9(Np11 Sheet 2 Table:
311(BF3 Sheet 38 Table 9 3-10 Sheet 20 Table-3.11(B)-3 Sheet 40 Table 3.11(B)-3 Sheet 48 Table:
3.11(BF3 Sheet 74 Table:
311(B)-3 Sheet 75 Table:
311(B)-3 Sheet 76 T:ble:
311(B)-3 Sheer 80 Table:
5 4A-3 Sheet 8 Table:
5 4A-3 Sheet 12 Tible:
5 4A-3 Sheet 13 Table-311(BF3 Sheet 35 Figura:
36-1 Sheet 37 Figurs.
36-1 Sheet 21 Figure:
93-8 Sheet 3 Figure:
6.31 Sheet 3 Figury 511 Sheet 2 96-072 REFLECTS THE ADDITION OF A FOURTH AIR COMPRESSOR IN THE COMPRESSED AIR SYSTEM Page' 93-5 Page:
934 Page.
93-3 Page:
9.3-2 Table.
9.3-1 Sheet 2 Table:
9.3-1 Sheet 1 Fgura-93-1 Sheet 7 Fgure-9.31 Sheet 2 96-073 REVISES FIRE PROTECTION SECTION TO REFLECT THE DISABLEMENT OF TWO HALON 1301 SYSTEMS IN THE SECURITY BUILDING Page.
9 5-13
Attachment to WO 96-0040 Page 8 of 18 USAR Change Request Description 95474 REVISES FIRE PROTECTION SECTION TO REFLECT THE REMOVAL OF 18 FIRE PROTECTION SECTIONAL ISOLATION VALVES LOCATED IN UNDERGROUND PITS INSIDE THE SECURITY SYSTEM ISOLATION ZONE.
F$urs:
95-1 Sheet 2 95475 REVISES FIGURE TO REFLECT THE ADDITION OF A PRESSURE GAUGE TO THE TEST CONNECTION TO MONITOR RHR DISCHARGE PIPING PRESSURE Figura.
647 St.i st 95-076 REVISES FIGURE TO REFLECT THE ELIMINATION OF START-UP STRAINERS FOR THE NUCLEAR SAMPLING SYSTEM Fgura:
9.3-2 Sheet 1 1
95-077 REFLECTS THE ADDITION OF A 3 AMP GROUND FAULT FUSE TO PROTECT THE SSPS POWER SUPPLIES FROM SHORTS ON ANTICIPATORY CIRCulTS IN THE TURBINE BUILIDING Page:
7.2-11 95-078 REVISES STEAM GENERATOR BLOWDOWN AND CONDENSATE PUMP DISCHARGE HEADER Hl/LO PH ALARM SETPOINTS Ttble 93-5 Sheet i l
95-079 REFLECTS CHANGES MADE DUE TO REVISION TO 10 CFR 20 Page-12 5-4 Page~
12.3-10 Page:
12 3-8 Page:
12.5-6 Table:
13-4 Sheet 8 Table:
1.3-4 Sheet 7 Table:
1.3-4 Sheet 6 Table:
1.3-4 Sheet 5 Table.
1.34 Sheet 4 Table.
1.3-4 Sheet 3 Ttble 1.3-4 Sheet 2 Table:
1.3-4 Sheet i 95-080 CORRECTS TYPOGRAPHICAL ERRORS Page:
9441 95-082 REVISES DISCUSSION TO REFLECT ACTUAL OPERATING PRESSURE AND DESIGN OF PRESSURE REDUCING VALVES IN THE INSTRUMENT AIR SYSTEM Page:
93-5
Attachment to WO 96-0040 Page 9 of 18 USAR Change Request Description 95483 REFLECTS THE ADDITION OF A BUILDING OVER THE CIRCULATING WATER PUMPS, MOTORS AND DISCHARGE PIPE Figury 1041 Sheet 5 Figure-10 4-1 Sheet 2 Fgure:
1041 Sheet: 4 95484 REVISES FIGURE TO REFLECT CARBON / SAND FILTER VENTILATION HEADER LINE AND TO REFLECT CORRECT VALVE SYMBOL Figurr 92-5 Sheet 3 95-086 REVISES FIGURE TO REFLECT THE ADDITION OF A PERMANENT CONTAINMENT TOOL ROOM l
Fgurt 1216 Sheet Figure 1.2-13 Sheet 95-086 REVISES FIGURE TO REFLECT THE ADDITION OF MINIMUM FLOW ORIFICES TO THE RAW WATER AND FILTERED WATER TRANSFER PUMPS Fgure.
925 Sheet 3 Figure:
92-5 Sheet 2 95-087 CLARIFIES THE FUNCTION OF THE SHELL SIDE BYPASS ARRANGEMENT ON THE COMPONENT COOLING WATER HEAT EXCHANGERS Page.
9216 95-088 REVISES FIGURES TO REFLECT A MODIFICATION TO INCREASE THE SIZE OF DRAIN LINES IN THE ESSENTIAL SERVICE WATER EMERGENCY MAKE-UP LINES TO THE COMPONENT COOLING WATER PUMPS Fgurr 9 2-15 Sheet 1 95-089 REVISES TABLE TO REFLECT THE REPLACEMENT OF REACTOR COOLANT PUMP SEAL INJECTION THROTTLING VALVES Tttwo-311(BF3 Sheet 46 95-090 REVISES FIGURE TO REFLECT MODIFICATION TO LOW PRESSURE (LP) FEEDWATER HEATER SYSTEM TO ADD LEVEL INDICATORS AND THERMOWELLS FOR EACH LP HEATER AND TO RELOCATE THE LEVEL CONTROLLERS FOR TWO OF THE HEATERS Fgurt 1044 Sheet 4
Attachment to WO 96-0040 1
Page 10 of 18 USAR Change Request Description 95-091 REVISES FIGURE TO REFLECT THE DELETION OF THE INTERLOCK BETWEEN THE HIGH TOTAL DISOLVED SOLIDS AND-THE OIL !NTERCEPTOR PUMPS Fgurs:
10 4-12 Sheet 1 Fgure-10 4-12 Sheet 3 I
95-092 REFLECTS ADDITION OF A WET-PIPE SPRINKLER SYSTEM IN THE AUXILLIARY FEEDWATER PIPE CHASE AREA. ALSO REFLECTS THE ADDITION OF CHECKER PLATES OVER THE RHR/ CONTAINMENT SPRAY ENCAPSULATION ACCESS HATCHES. THIS CHANGE REDUCES THE AMOUNT OF THERMOLAG USED IN THE PLANT Page 9 5B 102 Page:
9 5B-101 Page:
9 58-99 Page' 9 5B-67 Page 9 50-55 Page:
0.5B-54 Page' 9 58-31 Page:
9.58-30 Page.
9 SB-11 Page.
9 5-26 Page 95-8 T: tie 9584 Sheet 2 Table 9 58-3 Sheet 1 Table-951-2 Sheet 1 Figura:
951-2 Sheet 1 Fgure-95.11 Sheet 2 Fgure-9.5.11 Sheet 1 95-094 REFLECTS ADDITION OF A WET-PIPE SPRINKLER SYSTEM IN THE RADWASTE STORAGE BUILDING Fgura:
9512 Sheet 2 95-095 REFLECTS ELIMINATION OF STEAM GENERATOR SNUBBERS AND THE ADDITION OF COMPRESSION STRUTS TO THE s
UPPER SUPPORT LOCATION OF THE STEAM GENERATOR q
Page:
5 4-56 Page-54-57 Page.
3 9(N)-26 Page:
3 9(N)-25 Page:
3 9(N)-24 Page:
3 9(N)-23 Page-3 9(N)-22 Tcble 36-4 Sheet 82 Table 36-4 Sheet 81 Table-36-4 Sheet 79 Table-36-3 Sheet 42 Table.
36-3 Sheet 40 Table:
36-3 Sheet 38 Trble.
36-3 Sheet 37 Figure-36-1 Sheet 35 Fgur1 36-1 Sheet 34 Figure-36-1.
Sheet 32 Figure:
5414 Sheet 95-096 REVISES FIGURE TO REFLECT THE ADDITION OF THE SECONDARY ACCESS FACILITY l
1 Fgurs-1.2-44 Sheet Figure:
9 2-5A Sheet 95-097 REVISES FIGURE TO REFLECT THE ADDITION OF A CONDUlT TO THE PUBLIC ADDRESS SYSTEM RACEWAY Fgura.
952-2 Sheet
~
95-098 REVISES FIGURES TO REFLECT THE ADDITION OF THERMAL EXPANSION MONITORING PROGRAM SENSORS ON THE RCS Figura:
10.3 1 Sheet 1 Figure.
511 Sheet i i
)
3 Att:chment to WO 96-0040 Page 11 of 18 t
USAR Change Request Description 95-099 REVISES FIGURE TO REFLECT THE REMOVAL OF POWER FROM EMHV8924 (ISOLATION VALVE LOCATED IN THE CROSSOVER LINE FROM THE CENTRIFUGAL CHARGING PUMP SUCTION TO THE SAFETY INJECTION PUMP SU DURING MODES 4,5, AND 6 Table 63-3 Sheet 2 Fgurs 631 Sheet 2 l
95-100 REVISES DESCRIPTION OF POTENTIAL DISCHARGE POINTS TO THE COOLING LAKE TO INCLUDE THE SHOWER AND EYE WASH STATION LOCATED IN THE TECHNICAL SUPPORT BUILDING Page' 11.2-16 95-101 REVISES FIGURE TO REFLECT MODIFICATION TO THE BOOSTER PUMP THAT SUPPLIES COOLING WATER TO THE SERVICE AIR COMPRESSOR Figurr 93-1 Sheet _ 1 95-102 REVISES FIGURE TO REFLECT MODIFICATION TO REPLACE CONDUCTIVITY MONITORS AND ASSOCIATED CELLS DUE TO OBSOLESCENCE Figurr 10 4-12 Sheet 4 95-103 CORRECTS DESCRIPTION OF WASTE WATER TREATMENT SYSTEM TO REFLECT THAT IT WILL ALSO PROCESS LOW-LEVEL RADIOACTIVE WASTE WATER IN ACCORDANCE WITH THE REQUIREMENTS IN THE OFFSITE DOSE CALCULATION MANUAL Page 10 4-62 Page:
1.2 19 95-104 REVISES FIGURES TO REFLECT INSTALLATION OF A TEE AND ISOLATION VALVE UPSTREAM OF THE CHECK VALVES AND DOWNSTREAM OF THE ASSOCIATED ISOLATION VALVE IN THE INSTRUMENT AIR LINE THAT SERVES THE ATMOSPHERIC RELIEF VALVES Figura:
10 3-1 Sheet 1 Fgure-93-1 Sheet 4 95-105 REVISES SYSTEM DESCRIPTION TO REFLECT CHANGE IN THE DIESEL FUEL OIL SYSTEM REQUIREMEf5 Page-9 5-53 Page.
9555
t l
Att:chment to WO 96-0040 l
Page 12 of 18 l
USAR Change Request Description 95-106 CORRECTS TYPOGRAPHICAL ERROR FROM HARDCOPY/ ELECTRONIC COPY VERIFICATION AND REVISES TABLES 1.7 AND MISCELLANEOUS FIGURES TO REFLECT MODIFICATIONS Page.
2 5-280 Page-10-vi Page:
4 4-21 Page:
3.11(B)-20 Page-311(B)-7 Page.
3 8-38 Page' 8.14 Page.
2.5-323 Page 9225 Page-2.5-232 Page 2 5-228 Page 2 5-213 Page 2.5-165 Page 2.549 Page' 2.1 10 Page 1.2-21 j
Page 3 0-xvii Page-15 0-iii Page 9 5-33 Page-17.2-44 l
Page:
15617 Page-15213 Page 15.0-vi Page:
5 4-29 Page 15 Dav Page 6 2-91 Page-15.0-il Page-15 0-1 Page-14 2 128 Page.
13 5-2 Page:
13 2-27 Page.
9 5-38 Page 9 3-51 Page:
9 2-32 Page.
15 0-v Table 1.73 Sheet all Table-1.72 Sheet all Table:
1.71 Sheet all Figura:
9214 Sheet Fgure:
82-4 Sheet Figure.
1.2 13 Sheet Figure:
11.4-1 Sheet 2 Fgura:
11.2-1 Sheet 4 Figure:
10 4-5 Sheet 3 Figure:
10 4-1 Sheet i Figure.
1.2-29 Sheet Fours:
1 2-24 Sheet Figure.
9.25 Sheet. 4 Fgure:
9.2-5 Sheet 3 Fgure:
955-1 Sheet 2 Figurr 9215 Sheet Figure.
8.3-1 Sheet 3 Figure.
9.21 Sheet 1 Figure:
9.2-1 Sheet 3 Figurs-631 Sheet 2 Faure 54-7 Sheet Fgure:
11.4-1 Sheet 1 Figure.
10 4-8 Sheet 5 Figura:
104-8 Sheet 2 Figure-10 4-6 Sheet i Fgure:
10 4-5 Sheet 2 Figure:
10 4-4 Sheet Fgurr to 412 Sheet 3 Fgure:
1021 Sheet 3 Figure-9.2-24 Sheet Fgure:
9.5-1 Sheet 3 l
Fgurs:
9551 Sheet 1 Figure 954-1 Sheet Fgure:
95.3-1 Sheet Fgure:
94-7 Sheet l
Figu,3-944 Sheet 3 Figure.
94-4 Sheet. 3 Figure:
959-1 Sheet 2 Figure.
95.71 Sheet 2 Figura.
9571 Sheet i Fgure.
956-1 Sheet i Fgure' 63-1 Sheet 4 Fgure:
9.5-2 Sheet:
Fgura:
921 Sheet 2 Fgure 9.59-4 Sheet 4 Figure-9.3-4 Sheet 1 Fgure:
93-1 Sheet 4 Fgurr 93-1 Sheet i Fgure-94-3 Sheet 3 Figure:
94-3 Sheet 2 Figure:
943 Sheet 1 Fgure 9410 Sheet Fgure:
94-1 Sheet 3 Fgure-93-3 Sheet 1 Figure:
9311 Sheet 1 Fgurs:
92-2 Sheet. 3 Figure:
952-2 Sheet 9i108 REVISES FIGURE TO CORRECT THE LIMIT SWITCH COMPONENT IDENTIFICATION NUMBER FOR AKHV0421 TO READ AKZSO421 Fgurs:
10 4-5 Sheet 2 95-109 CLARIFIES DISCUSSION AND BASES FOR DIESEL GENERATOR AUXILIARY LUBRICATING OtL SYSTEM Page-9 5-75 Page-0 5-72 Page-9 5-71 Page.
9 5-70 95-110 UPDATES FIGURE TO REFLECT TECHNICAL SPECIFICATIONS Page 91 A-11 Fgurs-9.1 A-26 Sheet
Attachment to WO 96-0040 Page 13 of 18 l
USAR Change Request Description 95-111 REVISES SECTIONS TO REFLECT CHANGES TO THE ASME SECTION XI PROGRAM IMPLEMENTED IN THE INSERVICE INSPECTION PROGRAM Page 66-2 Page 66-4 Page 66-3 Page' 5.2-31 95-113 REVISES BUILDING NAMES FOR TECHNICAL SUPPORT BUILDING EAST AND WEST l
Page:
12.54 Page.
9.5 14 Page.
95-8 Page:
2.2-8 Page.
2.2-7 Page-2.24 Page:
2.25 Page:
2.2-4
)
Page 212 Page 1.2-7 FigurJ:
9 2-5A Sheet Figure:
12.5-1 Sheet 2 Figure:
951 Sheet Figure:
24-3 Sheet 7 Fgurs:
21-4 Sheet Figure' 1.2-44 Sheet 95-114 REVISES CHAPTER 13 TO REFLECT CHANGE IN RESPONSIBILITY FOR PORTIONS OF THE PROCUREMENT PROCESS Page 13.1 9 Page:
13 1-5 95-115 REVISES TABLE TO CORRECT ERROR ON THE TIME TO INITIATE AUXILIARY FEEDWATER FOLLOWING A FEEDWATER LINE BREAK Table-152-1 Sheet 5 Table:
15 2-1 Sheet 4 95-115 REVISES ORGANIZATION TO ADD THE RESUME OF A SHIFT SUPERVISOR Page.
13121 l
95-117 REVISES COMMITMENTS TO REGULATORY GUIDE 1.33 TO REFLECT CHANGES TO THE BIENNIAL RELEVANCY PROCEDURE REVIEW REQUIREMENTS Page:
3A 15 Page:
3A-14 95-118 REVISES ORGANIZATION TO REFLECT REASSIGNMENT OF PERSONNEL IN THE POSITIONS OF MANAGER PLANT SUPPORT AND ASSISTANT TO THE VICE PRESIDENT PLANT OPERATIONS Page:
13.3-1 Page-13 1-23 Page.
13.1 18 95-119 REVISES PROCESS FOR PURGING CARBON DIOXIDE AFTER MAINTENANCE OF THE TURBINE Page 224 95-120 REVISES ORGANIZATION TO REFLECT A REALIGNMENT OF MODIFICATION ACTIVITIES j
Page 13.1 13
Attachment to WO 96-00t'J Page 14 of 18 USAR Change Request Description 95-121 REVISES FIGURE TO CORRECT COORDINATE REFERENCES Figue 10 3-1 Sheet 1 95-123 REVISES FIGURE TO REFLECT AN OPENING IN THE WALL OF THE AUXILIARY BUILDING BETWEEN ROOMS 1203 AND ~
1204 Fgure:
9.512 Sheet 1 Figure-1.2-10 Sheet 95-124 REVISES FIGURES TO REFLECT REROUTING OF THE CRAIN FROM THE DECONTAMINATION SPRAY BOOTH IN THE l
AUXILIARY BUILDING HOT MACHINE SHOP Feuc 12 3-4 Sheet 1 Figure:
93-5 Sheet 13 Figure:
9.3-5 Sheet 16 95 125 REVISES FIGURES TO REFLECT CHANGES TO SUB COMPONENT NUMBERING Figue 9.56-1 Sheet 2 Figure:
956-1 Sheet 1 95 126 REVISES DISCUSSION TO REFLECT A CHANGE TO THE PRINCIPLE CONSTRUCTION CODE FOR THE STANDBY DIESEL GENERATOR ENGINE KEEP-WARM LUBE OIL PUMP Table 321 SP.Det NOTE Table-3.21 Sheet 14 Table:
95.71 Sheet 3 Table 967-1 Sheet 1 95-127 REVISES DISCUSSION TO CLARIFY THE LOGIC ASSOCIATED WITH THE HIGH JACKET WATER COOLANT TEMPERATURE, THE LOW LUBE OIL PRESSURE AND THE HIGH CRANKCASE PRESSURE PROTECTIVE Tr.lP FUNCTIONS Page:
8 3-12 Page:
8.3-11 95 128 REVISES FIGURES TO REFLECT A MODIFICATION TO THE NUCLEAR SAMPLE PANEL SJ-144 TO ALLOW LESS FLOW RESTRICTIVE TUBING AND TUBING ACCESSORIES i
Figuo 93-3 Sheet Figure:
93-2 Sheet 1 95 129 REVISES DISCUSSION OF TURBINE DRIVEN AUXILIARY FEEDWATER PUMP EXHAUST LINE TO IDENTIFY THAT IT IS SPECIAL SCOPE 11/l Page 10 4-52 i
l
Attachment to WO 96-0040 Page 15 of 18 USAR Change Request Description 96-130 CLARIFIES LICENSING BASIS ANALYSIS ASSUMPTION OF BORON CONCENTRATION Page 15.1-17 96-131 REVISES CHAPTER 16.2 TO REFLECT ANALYSES BASED ON REVISED AUXILIARY FEEDWATER FLOWRATES Page.
15.2-20 Page:
15.2-18 Page' 15 2-13 Table:
15.2 1 Sheet 3 Figure:
15.2 12 Sheet Fgure:
15.2 11 Sheet Figure:
15.2 10 Sheet Figure:
15.2-9 Sheet 95-132 CORRECTS TABLE TO REFLECT ACTUAL VALVE FUNCTION THIS IS A CORRECTION TO A TYPOGRAPHICAL ERROR MADE IN THE CONVERSION FROM THE FSAR TO THE USAR Table:
7.3-11 Sheet 96-133 REVISES SETPOINTS FOR THE DIESEL GENERATOR BUILDING VENTILATION SYSTEM Page.
9 4-83 Page.
94-82 Page:
9 4-81 Page:
9480 96-134 REVISES FIGURES TO REFLECT THE MODIFICATION OF THE EMERGENCY DIESEL GENERATOR MAIN LUBE OIL STRAINER DRAIN PlPING 1O PREVENT CROSS CONNECTING THE DIRTY SIDE OF THE FILTER TO THE CLEAN SIDE i
Figure 95.71 Sheet 2 Fgure:
9.5.71 Sheet 1 96-136 REVISES FIGURES TO REFLECT MODIFICATION OF PIPING FROM CARBON STEEL TO A LOW-ALLOY MATERIAL IN THr 3RD STAGE EXTRACTION PIPELINES TO THE MOISTURE SEPARATOR REHEATERS Figue 1021 Sheet 4 Figure:
10.2-1 Sheet 2 Figure:
10.2 1 Sheet 1 1
95-136 REVISES PROCEDURE TO ALLOW THE USE OF THE MAIN STEAM DUMP VALVES TO MAINTAIN REACTOR POWER WHILE DECREASING MAIN TURBINE LOAD TO CYCLE THE MAIN TURBINE STOP AND CONTROL VALVES Page' 10 4-12 Page.
10 4-10 Page.
7.7-21 Page:
7.7-3 95-137 IMPLEMENTS AMENDMENT 89 TO THE LICENSE TO RELOCATE SELECTED SECTION OF THE TECHNICAL SPECIFICATION TO THE USAR Page:
16.1-9 Page.
16.1-8 95-138 IMPLEMENTS AMENDMENT 91 TO THE LICENSE TO REVISE THE TIME TO RESTORE OPERABLE STATUS TO THE REFUELING WATER STORAGE TANK (RWST) TO 8 HOURS WHEN BORON CONCENTRATION IN THE RWST IS NOT WITHIN SPECIFIED LIMITS Page.
16.1-8
Attachment to WO 96-0040 Page 16 of 18 USAR Change Request Description 95-139 flEVISES FIGURES TO REFLECT AS BUILT INFORMATION FOR VALVE DRAIN LINE ON THE SERVICE WATER SYSTEM Page:
16 1-0 Fgura.
92-1 Sheet 3 j
95-140 REVISES DISCUSSION ON EMERGENCY LIGHTING TO REFLECT INFORMATION IN THE SAFETY EVALUTION REPORT Page 9 5-47 Page 9 58-5 Page-0 5-46 Page:
9.5-39 Page 9 5-24 Page.
9 0-XIX Table.
9 SE 1 Sheet 19 Table' 953-1 Srmet 95-141 REVISES ORGANIZATION TO REFLECT THE RESIGNATION OF THE VICE PRESIDENT ENGINEERING Page 13110 Page-13.1 9 95-142 REVISES TABLE TO REFLECT ACTUAL LOCATION OF SELF CONTAINED BREATHING APPARATUS Table.
9 5A-1 Sheet 58 96401 REVISES FIGURES TO REFLECT TAGGING OF SERVICE AIR ISOLATION VALVES Figar3:
925 Sheet 3 Figure:
9.2-5 Sheet 4 96-002 REVISES FIGURES TO REFLECT CORRECTION OF DUPLICATE TAG NUMBERS Fgurs 931 Sheet 1 96-003 MOVES THE FIRE PROTECTION PROGRAM TO CHAPTER 9.5 OF THE USAR FOR BETTER VISABILITY Page.
FFP Page:
9 5-40 Page.
9 5-39 Page.
9 5-38 Page-9537 Page-9 5-36 Page 9 5-35 Page:
9 5-34 P:ge, 9 5-33 96-004 REVISES CHAPTER SIXTEEN TO REFLECT RELOCATION OF INSTRUMENTATION RESPONSE TIME TABLES FROM THE TECHNICAL SPECIFICATIONS IN ACCORDANCE WITH AMENDMENT 93 Page:
16.3-22 Page:
16.3-21 Page:
16 3-20 Page.
16 3-19 Page.
16.3-18 Page:
16317 Page-16 0-v Page:
16 0-iii Page-16 0-6 96-005 REVISES FIGURE TO REFLECT REFLECT THE RETURN TO ORIGINAL DESIGN FOR VENT LINES Fgura:
9 2-24 Sheet Fgure.
92-5 Sheet 4
l Attachment to WO 96-0040 Page 17 of 18 USAR Change Request Description 96-006 REVISES FIGURES TO ADD NOTE CONCERNING PIPING MATERIAL CHANGES FOR ERROSION/COROSION l
Fgura 1044 Sheet 2 Figure:
10.3-1 Sheet 2 Figure-10.2 1 Sheet 3 Figure:
1042 Sheet 1 l
l Fgur3 10 4-2 Sheet 2 Fgure-1042 Sheet 3 Fgure:
1042 Sheet 4 Figure:
10.3-1 Sheet 1 Fgur3:
1044 Sheet 1 Fgure.
10 4-10 Sheet Fgure' 10 4-8 Sheet 1 Figure:
10 4-8 Sheet 2 Figurs 10 4-8 Sheet 3 Fgure.
10 4-8 Sheet 4 Figure:
10 4-8 Sheet 5 Fgure:
10.4-4 Sheet Figur3:
959-1 Sheet i Fgure.
9.59-1 Sheet 2 Figure:
9.59-1 Sheet 3 Fgure:
10.4 2 Sheet 5 96-007 REVISE FIGURE TO REFLECT CORRECT VALVE CONFIGURATION Figurs-10 4-5 Sheet 1 l
l 96-008 REVISES DISCUSSION TO DELETE AN INCORRECT STATEMENT CONCERNING CROSS CONNECTING THE EMERGENCY DIESEL GENERATOR STORAGE TANKS WHILE FlLLING A TANK Page:
9 5-49 l
96-009 REVISES FIGURES TO REFLECT CORRECT FIGURES TO REFLECT REMOVAL OF START-UP STRAINERS. SOME FIGURES STILL REFLECTED STRAINERS ON THE DRAWINGS EVEN THOUGH THEY HAD BEEN REMOVED AFTER START UP Fgurs:
9311 Sheet 2 Fgure-8.2.21 Sheet Fgure:
8.3-1 Sheet 2 Figure:
54-7 Sheet Fgura:
9215 Sheet 1 Fgure.
9.13 Sheet 1 Fgure:
9214 Sheet Fgure:
93-8 Sheet 3 Figura:
10 4-9 Sheet Fgure-1044 Sheet 3 Foure.
1044 Sheet 1 Fgure:
1,11 Sheet 2 l
l l
96-010 REVISES FIGURE TO CORRECT FAILURE POSITION OF VACUUM PUMP SPRAY VALVES l
Figure.
10 4-3 Sheet l
96-011 REVISES FIGURE TO CORRECT NORMAL POSITION OF DIESEL GENERATOR LUBE OlL SUMP LEVEL CONTROL VALVES l
Fiours:
957-1 Sheet 2 Figure.
9.571 Sheet 1 96-012 REVISES FIGURE TO CORRECT DRAFTING ERRORS Fgure:
92-5 Sheet 2 i
i
1 Attachment to WO 96-0040 Page 18 of 18 USAR Change Request Description 96-013 REVISES FIGURE TO CORRECT VALVE TAG NUMBERS Figurr 9.21 Sheet i 96-014 REVISES FIGURE TO PROVIDE CONTINUATION LINE NUMBERS AND VALVE TAG NUMBERS i
Fgut*
959-1 Sheet 3 Figure:
9223 Sheet 96-016 REVISES FIGURE TO REFLECT DRAIN CONFIGURATION AFTER CONSTRUCTION OF THE GENERAL OFFICE BUILDING Figur2 2.4-3 Sheet 7 96-01W REVISES CHAPTER 13 TO INCLUDE REFERENCE TO 10 CFR 50.120 Page 13.2-30 Table.
13-4 Sheet 20 96-020 REVISES DESCRIPTION OF BACKFILL IN THE AREA NEAR THE ESSENTIAL SERVICE WATER SYSTEM PIPELINES Page 2.5-221 96-036 REVISES DISCUSION TO CLARIFlY THE OPERATON OF THE COMPONENT COOLING WATER AND THE FUEL POOL COMPONENT COOLING SYSTEM DURING PLANT COOLDOWN.
Page:
9218 Page' 9.1 23 96437 CLARIFIES SPENT FUEL POOL INFORMATION Page:
9.1 A-28 Page 91 A-26 Page 9.1A-25 Page:
9.1 A 24 Page-91 A-23 Page:
9.1A-22 Page:
9.1 A-16 Page:
9.1 A 15 Page:
01 A-13 Page:
9 1-26 Page-0123 Page:
91 21 Page.
9.1 17 Table' 9210 Sheet 2 Table 929 Sheet 2 Table:
9.2-9 Sheet i Table:
9.1A 14 Sheet 1 Table:
91A-13 Sheet 1 Table:
9.15 Sheet 2 Table:
91-4 Sheet 2 Table:
9.1-4 Sheet i