Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20101B001 + (ML20101B001)
- ML20101B009 + (ML20101B009)
- ML20101B012 + (ML20101B012)
- TXX-9219, Suppls 880708 & 890526 Responses to NRC Bulletin 88-004 Re Potential safety-related Pump Loss.Mod to Chemical & Vol Control Sys Consists of Replacing Four Diaphragm Valves W/ Globe Valves in Min Flow Recirculation Line + (ML20101B014)
- RBG-19654, Final Deficiency Rept DR-160 Re Lugs Connecting Potential Transformer Leads to 5-kV Emergency Switchgear Buses Supplied by Gould.Initially Reported on 841107.Engineering & Design Coordination Repts Issued to Replace Leads & Lugs + (ML20101B015)
- ML20101B018 + (ML20101B018)
- ML20101B020 + (ML20101B020)
- ML20101B023 + (ML20101B023)
- ML20101B027 + (ML20101B027)
- ML20101B030 + (ML20101B030)
- ML20101B033 + (ML20101B033)
- ML20101B042 + (ML20101B042)
- ML20101B043 + (ML20101B043)
- RBG-19655, Interim Deficiency Rept DR-261 Re Auxiliary Contacts on Ite Rowan Relays Supplied by Gould Brown-Boveri.Next Rept Will Be Submitted by 850214 + (ML20101B053)
- 05000413/LER-1984-019-02, :841108,closed Inlet Valve to Vent Sampling Pump Prevented Continuous Sampling.Caused by Personnel Error.Inlet & Outlet Valves Locked Open + (ML20101B054)
- ML20101B055 + (ML20101B055)
- 05000219/LER-1984-029, :on 841105,TN-9 Spent Fuel Shipping Cask Lifted by 100 Ton Capacity Reactor Bldg Crane Above Top Plate W/Unadjusted Vertical Limit Switches.Caused by Deficient Procedure.Personnel Reinstructed + (ML20101B056)
- ML20101B059 + (ML20101B059)
- ML20101B061 + (ML20101B061)
- ML20101B062 + (ML20101B062)
- ML20101B063 + (ML20101B063)
- TXX-9121, Discusses Confirmatory Testing of Thermo-Lag Fire Barrier Sys.Comprehensive Confirmatory Testing Program Initiated to Envelope Full Range of Protected Conduit & Cable Tray Configurations.Testing Scheduled for Second Wk in June + (ML20101B071)
- ML20101B072 + (ML20101B072)
- ML20101B075 + (ML20101B075)
- 2CAN049205, Revises 910627 Application for Amend to License NPF-6, Changing TS 3.8.2.5 & Associated Bases Re Containment Penetration Conductor Overcurrent Protective Devices,Per NRC Request + (ML20101B076)
- ML20101B080 + (ML20101B080)
- ML20101B083 + (ML20101B083)
- PY-CEI-NRR-1486, Special Rept:On 920315,small Earthquake Occurred 4 Miles Northwest of Plant.On 920323,seismic Recorders Removed from Svc & Remained Inoperable for More than 30 Days.Several Instrumented Locations Available to Record Motion + (ML20101B084)
- ML20101B085 + (ML20101B085)
- 2CAN049208, Forwards Addl Info to Support 890831 Relief Requests from First 10-yr Inservice Insp Interval Consisting of Listing of Limited Inservice Insp Exam Coverage Estimates for First Insp Interval + (ML20101B086)
- ML20101B087 + (ML20101B087)
- U-601965, Annual Environ Operating Rept,1991 + (ML20101B089)
- ML20101B099 + (ML20101B099)
- ML20101B103 + (ML20101B103)
- ML20101B109 + (ML20101B109)
- ML20101B114 + (ML20101B114)
- ML20101B119 + (ML20101B119)
- ML20101B144 + (ML20101B144)
- ML20101B157 + (ML20101B157)
- NSD-NRC-96-4662, Submits Response to NRC Requests for Addl Info on AP600 Design Certification Program,Including 10 follow-on Questions Re Level 1 PRA Topics & 2 follow-on Questions Re Accident Mgt + (ML20101B162)
- 05000374/LER-1984-074-01, :on 841116,reactor Water Cleanup Isolation Received from Leak Detection High Ambient Temp Switch.Caused by Spurious Voltage Spike Generated When Thermocouple Wire Moved to Attach Test Equipment Leads + (ML20101B176)
- HL-5124, Forwards Monthly Operating Repts for Feb 1996 for Ei Hatch Nuclear Plant Units 1 & 2 & Revised Page E1-2 for Jan 1996 MOR + (ML20101B177)
- ML20101B181 + (ML20101B181)
- ML20101B187 + (ML20101B187)
- ML20101B191 + (ML20101B191)
- ML20101B192 + (ML20101B192)
- ML20101B200 + (ML20101B200)
- ML20101B206 + (ML20101B206)
- ML20101B207 + (ML20101B207)
- BVY-96-018, Monthly Statistical Rept for Feb 1996 for VT Yankee Nuclear Power Station + (ML20101B216)
- 05000368/LER-1992-003-02, :on 920501,initiated Manual Reactor Trip After Mismatch in Charging & Letdown Flowrates Observed.Cause Unknown.Cause for Recurring High Dp Identified by 920901. Procedure 2203.012L Revised + (ML20101B219)