Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20099H259 + (ML20099H259)
- ML20099H263 + (ML20099H263)
- ML20099H277 + (ML20099H277)
- ML20099H278 + (ML20099H278)
- 05000370/LER-1985-003, :on 850204,steam Generator Temp Dropped Below Required 70 F.Existing Method for Verification That Both Primary & Secondary Side Pressure Less than 200 Psig Found Inadequate.Appropriate Procedure Initiated + (ML20099H280)
- ML20099H293 + (ML20099H293)
- NRC-92-0096, Forwards Endorsements 142,145 & 146 to Nelia Policy NF-0092 & Endorsements 38 & 41 to Maelu Policy MF-0120 + (ML20099H299)
- RBG-37309, Responds to NRC Re Violations Noted in Insp Rept 50-458/92-15 on 920420-24.Corrective Actions:Beginning 920714,Burns Timekeeping Personnel Will Provide Security Shift Supervisor W/Total Hours Worked List on Daily Basis + (ML20099H301)
- 05000364/LER-1985-006, :on 850201,Train B wide-range Containment Sump Level Recorder Had Ink Cartridge Installed for Only Blue Pen,Making Recorder Inoperable.Caused by Personnel Error. Personnel Counseled + (ML20099H312)
- RBG-20-314, Requests Meeting W/Emergency Preparedness Team Leader & Applicable Team Members on 850315 in Arlington,Tx.Proposed Agenda Items Consist of Prompt Notification Sys,Transient Population Info & Discussion of Insp Repts + (ML20099H317)
- ML20099H335 + (ML20099H335)
- U-602031, Monthly Operating Rept for Jul 1992 for CPS Unit 1 + (ML20099H336)
- ML20099H339 + (ML20099H339)
- ML20099H340 + (ML20099H340)
- 05000373/LER-1985-014-01, :on 850204,vacuum Breaker Valve Opened & Reclosed to Equalize Pressure Between Suppression Pool & Drywell.Caused by Adding Nitrogen to Reduce Drywell Oxygen Concentration.Procedure Will Be Revised + (ML20099H343)
- RA-20-0116, Special Report 2020-002-00 for Catawba Nuclear Station, Units 1 and 2, Meteorological Instrumentation Annual Data Recovery + (ML20099H344)
- RBG-19-255, Forwards Summary Rept, Detailed Control Room Design Review, Methodology & Approach,Human Engineering Discrepancy Results, Per Generic Ltr 82-33, Suppl 1 to NUREG-0737 - Requirements for Emergency Response Capability + (ML20099H346)
- ML20099H354 + (ML20099H354)
- ML20099H357 + (ML20099H357)
- ML20099H361 + (ML20099H361)
- ML20099H366 + (ML20099H366)
- ML20099H376 + (ML20099H376)
- ML20099H381 + (ML20099H381)
- ML20099H384 + (ML20099H384)
- ML20099H394 + (ML20099H394)
- NLS8400274, Forwards Addl Fee for 830427 Application for Amend to License DPR-46,changing Tech Specs,Per 841106 Request + (ML20099H402)
- ML20099H405 + (ML20099H405)
- 0CAN089206, Advises That TS Changes to Address Operational & SR for Main Steam Line Radiation Monitors,Per Commitment in , Delayed from 920831 to 920930,based on Rescheduling of Safety Review Committee Meeting from mid-Aug to mid-Sept + (ML20099H409)
- 05000416/LER-1992-015, :on 920709,automatic Actuation of RWCU Sys Inboard Containment Isolation Valves Occurred & Leak Detection RWCU HX Room High Temp Annunicator Alarmed.Caused Not Yet Determined.Investigation Underway + (ML20099H411)
- ML20099H427 + (ML20099H427)
- ML20099H431 + (ML20099H431)
- 05000251/LER-1984-023-01, :on 841016,reactor Trip Occurred.Caused by Detector on Nis N-32 Channel Failing & Generating High Level Signal.Nis Channel N-32 Taken Out of Svc & Detector Replaced + (ML20099H437)
- 05000362/LER-1992-004, :on 920720,manual Initiation of Emergency FW Actuation Sys Occurred in Response to Trip of Mfpt.Caused by Low Bearing Lube Oil Pressure Condition of Associated MFP 3P062.PRV 3PCV-4270 Adjusted + (ML20099H449)
- ML20099H454 + (ML20099H454)
- PLA-2349, Monthly Operating Repts for Oct 1984 + (ML20099H459)
- ML20099H471 + (ML20099H471)
- 05000458/LER-1992-011, :on 920713,routine Review of Surveillance Test Procedures (Stps) Revealed That STP Was Overdue.Caused by Personnel Error.Supervisor Counseled & Surveillance Test Scheduling Priority Rept Posted + (ML20099H472)
- ML20099H476 + (ML20099H476)
- BECO-LTR-92-098, Monthly Operating Rept for Jul 1992 for Pilgrim Nuclear Power + (ML20099H477)
- ST-HL-AE-4177, Suppls 920710 Response to Exercise Weaknesses Noted in Insp Repts 50-498/92-09 & 50-499/92-09.Date to Determine Revised Needs for round-the-clock Emergency Medical Care at Facilities Extended from 920805 to 920915 + (ML20099H482)
- JPN-92-044, Forwards Application for Amend to License DPR-59,changing TS Re Offgas Sys Steam Dilution Flow Isolation Setpoints to Increase Offgas Dilution Steam Low Flow & High Flow Isolation Setpoints to 6,300 & 7,900 Lbs Per H,Respectively + (ML20099H493)
- ML20099H498 + (ML20099H498)
- ML20099H500 + (ML20099H500)
- ML20099H502 + (ML20099H502)
- ML20099H504 + (ML20099H504)
- ML20099H508 + (ML20099H508)
- ML20099H511 + (ML20099H511)
- AECM-84-0491, Informs That 840226 Commitment to Submit Limited Risk Assessment for Loss of Ac Power Withdrawn Since Diesel Engines Inspected to Address Adequacy of Tdi Diesel Engines & Expdedite Issuance of Full Power OL + (ML20099H521)
- ML20099H523 + (ML20099H523)
- ML20099H527 + (ML20099H527)
- 05000397/LER-1984-111, :on 841018,discovered Battery Surveillance Test Not Performed.Caused by Computer Program Being Incorrectly Set Up.Computer Program Fault Corrected & Surveillance Program Reexamined + (ML20099H529)