Final Deficiency Rept (Rdc 111(85) Re Incomplete Fuel Pool Gates Preoperational Test Specs Initiated by Gilbert Commonwealth.Initially Reported on 840813.Responsibility Transferred to Util
ML20099H278
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 03/04/1985
From: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
(RDC-111(85)), NUDOCS 8503150233
Download: ML20099H278 (3)


Text

)

D

  1. -1

{' , "# z' '

  • I

!I k3 T ( h" I i5 ei o . m , .> <

s,i r t : <: - ij'.,)

,. i .

P.o. box 5000 - CLEVELAND. oHlo 44101 - TELEPHONE (216) 622-9800 - lLLUMINATING BLDG. - 55 PUBLICSQUARE Serving The Best Location in the Nation MURRAY R. EDELMAN VICE NtESIDENT NUCMAR February 28, 1985 Mr. James G. Keppler Regional Administrator, Region III Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 Re: Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Fuel Pool Gates Preoperational Test Requirements (RDC 111(84) )

Dear Mr. Keppler:

This letter serves as our final report pursuant to 10CFR50.55(e) concerning inclusion of preoperational testing requirements in test specifications initiated by Gilbert / Commonwealth Inc. for the Perry Nuclear Power Plant (PNPP). Mr. J. McCormick-Barger of your office was notified on August 13, 1984, by Mr. B. D. Walrath of The Cleveland Electric Illuminating Company (CEI) that this problem was being evaluated per our Deviation Analysis Report 194.

Description of Deficiency The Gilbert / Commonwealth Inc. (G/C Inc.) test specifications did not include all testing requirements. The condition initially reported pertained to one test specification, however, the scope of the reviews conducted and corrective actions taken included all G/C Inc. test specifications. The cause of this condition was a policy established early in the project which limited updates of the test specifications to those initiated by CEI. At the time the reported condition was identified, meetings were already being held between G/C Inc. and CEI Systems Engineering Response Team (SERT) to revise the policy and bring the test specifications up to date.

8503150233 850304 liiAR PDR S

ADOCK 05000440 41985 kt PDR g]~)

. - . - . . . ~ -- .. -- .- _- _ - . - __ . ~ --

i

'Mr' James G. Keppler

. February 28, 1985 Analysis of Safety Implication  !

! Failure to specify all required test requirements could result in the

! condition where the safety-related function of equipment would not be verified during the test program. It should be noted that failure to

' specify a requirement in the test specification does not necessarily result in a preoperational test without the requirement. Assurance

, is provided by the administrative controls of the Nuclear Test Program 2

(TPI-7) which require that the Final Safety Analysis Report be utilized in conjunction with the G/C Inc. test specification as sources of preoperational test requirements.

4

- Corrective Action i As a result of the evaluation of DAR 194, CEI issued Project Observation Action Request P0142 84-65 to assure that G/C Inc. test specifications contained the necessary test requirement. As previously reported,

measures taken in response to that Action Request included a review of all G/C Inc. test specifications and revision to those found to be j incomplete.

Measures taken to prevent recurrence of this condition included both

programmatic and logistical changes to the processing of G/C Inc. test i specifications. The specific changes were

i j

  • The responsibility for quality assurance review of G/C Inc. test specifications and revisions was transferred from G/C Inc.'s
Quality Assurance Department, located in their corporate offices, to the CEI Operational Quality Section of the Nuclear Quality 4

Assurance Department; thereby allowing the review and monitoring of the process to be performed by the quality organization most familiar with the test program requirements.

4 The responsibility for test specification design review was also transferred from the G/C Inc. corporate offices to engineering personnel assigned to the System Engineering Response Team at the PNPP site. This enables the review to be performed by the engineers most familiar with the test program requirements.

The G/C Inc. Test Specifications Development Group was relocated to the PNPP site and now reports to the Administrative Element of the CEI Nuclear Test Section. This change provides direct i CEI overview of the activity. ,

  • The G/C Inc., interface procedure has been revised to reflect the 1

i change in policy.

I

{

i I

i I

4 9 - = - - , - - 3w-- w -- e,-%~

w . - - _ -

, . , , - -v = ---%--- r - ~-- ,

4

~

e'

  • Mr. James G..Keppler -

3- February 28, 1985

.All ofLthese changes have been implemented and any. revisions to the preoperational test procedures are being made as required by the PNPP Test Program Manual.

Please call if there are any questions. ,

i

> Sincerely, N

l Murray R. Edelman i Vice President 7

Nuclear Group i

j MRE:mw I cc: Mr.~J. A. Grobe NRC Site Office Director l Office of Inspection and_ Enforcement i U.S. Nuclear Regulatory Commission i

Washington, D. C. -20555 l

i 0.S. Nuclear Regulatory Commission j c/o Document Management Branch  :

Washington, D. C. 20555

Records Center, SEE-IN Institute of Nuclear Power Operations ,

i 1100 Circle 75 Parkway, Suite 1500 <