VERMONT YANKEE NUCLEAR POWER CORPORATION
.y%~
Ferry Road, Brattleboro, vT 05301-7002 f
)
ENGINEERING OFFICE N'
$80 M AiN STREli q
soaon eme 308,779 6711 August 13,1932 BW 92-98 United States Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
References:
a)
License No. DPR 28 (Docket No. 50-271) b)
Code of Federal Regulations, Title 10 Chapter 1, Part 50, Section 50.55a(g) c)
Proposed Rule on Codes and Standards for Nuclear Power Plants,56 Fed. Reg. 3796, dated 01/31/91 d)
ASME Boller and Pressure Vessel Code,Section XI,1986 Edition, " Rules and Inservice Inspection of Nuclear Power Plant Components" e)
ASME/ ANSI Standard OMa-1988 Addenda to ASME/ ANSI OMa-1987," Operation and Maintenance of Nuclear Power Plants"
- f)
Letter, Mr. W.P. ' Murphy,'WNPC, to Document Control Desk, USNRC, " Response to USNRC Generic Letter 89-04:
' Guidance on Developing Acceptable Inservice - Testing Programs," BW 89-90, dated 10/03/89 g)
Letter, Mr. S.A. Varga, USNRC, to All Holders of Light Water Reactor Operating Licenses and Construction Permits, " Guidance on Developing Acceptable Inservice Testing Programs (Goneric Letter No. 89-04)," NW 89-75, dated 04/03/89 =
T
Subject:
Vermont Yankee Nuclear Power Corporation Inservice Testing Program Update
Dear Sir:
Vermont Yankee is in the process of updating tho. hservice Testing (IST)
Program for the third ten-year interval. The current ten-year interval expires on
- November 1,1992. In accordance with 10 CFR 50.55a, the nrogram for the third ten-year interval must comply with the 1986 Edition of ASME Sec aon X1, with no Addenda.
}
920a190oo9 920sta
![1 l
jDR ADocx c5000271 i
0 PDR I
VERMONT YANKEE NUCLE AR POWER CORPORATION United States Nuclear Regulatory Commission August 13,1992 Page 2 With this letter, Vermont Yankee is requesting approval to update the IST Program for the third ten-year interval to the ASME/ ANSI Standard OMa-1988 Addenda, including additional requirements as discussed below.
It is Vermont Yankee's understanding that the ASME/ ANSI Standard OMa-1988 Addenda has been reviewed and approved b; the NRC Staff and has been incorporated in currently proposed rulemaking for 10 CFR 50.55a [ Reference c)).
Within this proposed rulemaking, the NRC also included certain restrictions and limitations on the use of the ASME/ ANSI Standard OMa-1988 Addenda. These are:
1)
ASME/ ANSI Standard OMa-1988 Addenda expands the scope of testing to potentially include certain pumps and valves that are not classified as Class 1, Class 2, or Class 3. Because 10 CFR 50.55a presently specifies requirements only for these pumps that are designated as Class 1, Class 2, or Class 3, the requirements of ASME/ ANSI Standard OMa-1988 Addenda need not be imposed on pumps and valves that are not classified as Class 1, Class 2, or Class 3. However, compliance with the requirements of Generic Letter 89-04, Position 11 [ Reference g)] must also be maintained.
2)
Paragraphs 4.2.2.3(e), " Analysis of Leakage Rates," and 4.2.2.3(f),
" Corrective Action," of Part 10 of ASME/ ANSI Standard OMa-1988 Addenda shall be imp!emented for all Category A valves that are Containment isolation Valves, regardless of whether or not they provide a reactor coolant system pressure isolation function. This shall be in addition to the requirements of paragraph 4.2.2.2, "Containmont isolation Valves."
Vermont Yankee has performed a detailed review of both the ASME/ ANSI Standard OMa-1088 Addenda and the above supplemental requirements. This review showed that the ASME/ ANSI' Standard OMa-1988 Addenda and the supplemental requirements have clarified many requirements in the 1986 Edition of ASME Section XI and more accurately reflect current industry practice and NRC guidance as provided in Generic Letter 89-04. Vermont Yankee believes that the use of the ASME/ ANSI Standard OMa-1988 Addenda and the supplemental requirements of the ten-yaar interval update will provide the basis for an enhanced IST Program.
VERMONT YANKEE NUCLEAR POWER CORPORATION United Status Nuclear Regulatory Comnics.on August 13,1992 Page 3 Representatives of Vermont Yankee met with your staff on August 5,1992 at NRC headquarters to discuss the above described plans to update our IST Program.
At this meeting, verbal agreement was reached regarding our approach. However, in order to support the planned submittal of our third ten-year interval IST Program update by November,1992, as required by 10 CFR 50.55a, Vermont Yankee hereby requests formal approval of our plans to utilize the ASME/ ANSI Standard OMa-1988 Addenda as described above. To support our efforts to update our program and submit it by November,1992, Vermont Yankee requests NRC approval of our plans no later than September 15,1992.
We trust that the enclosed information is satisfactory; however, should you have any questions or desire any additional information on this issue, please do not hesitate to contact us.
Very truly yours, Vermont Yankee Nuclear Pows,r Corporation ames P. Pelletier Vice President, Engineering cc:
USNRC Region i Administrator USNRC Resident Inspector - VYNPS USNRC Project Manager - VYNPS