U-602031, Monthly Operating Rept for Jul 1992 for CPS Unit 1

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Jul 1992 for CPS Unit 1
ML20099H336
Person / Time
Site: Clinton 
Issue date: 07/31/1992
From: Spangenberg F
ILLINOIS POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
U-602031, NUDOCS 9208180250
Download: ML20099H336 (5)


Text

.

~...

-.. -.... - ~.

tunc4 Fewer Compaq -

C;ron P:wer Stanon o-P O. Box 678 Cnn:on. IL 61727 Tei 217 935 6226 Fax 217 935-4632 J. Stephen Perry ILLINOIS -

Eenry Vce Precicent POWER u-6 2031 August 17, 1992 L30-92(08-12 )LP 8E.100c 10CFR50.36

' Docket No. 50-461 U.S. Nuclear Regulatory Conunission Document Control-Desk Usshington, D.C.

-20555 Subj ect :

Clinton Power Station, Unit 1 Facility Operating License NPF-62 July 1992 Monthly Operatinn Report

Dear Sir:

Please-find it Attachment 1 the Monthly Operating Report for Clinton Power Station, Unit 1, for the period ending July 31, 1992.

Sincerely rourr, 1

-A F

a.

Spangenberg, I I Manager - Licensing and Safety DAS/alh Attachment cc:

NRC Region III Regional Administrator NRC Resident Office Illinois Department of Nuclear Safety l

l l

L l

9200180250-920731

-PDR ADOCK 050C0461 R

PDR r

\\

..3-

...3..

AttacFaent l~-

5" 4

to-U-602031 Page 1 of'4 U

4 f

CHALLENGES TO MAIN STEAM SAFETY / RELIEF VALVES.

Month July 199?

s D

None 1

P 1;

.g

  • 4

. e

., _ _. ~. _..,,

_.. ~,,,

y-t

Attachtnent 1 to U 602031 Page 2 of 6 AVERAGE DAILY UNIT POWER LEVEL DOCKET No. _50-461 UN'.T Clinton 1 DATE 07/31/92 COMPLETED BY F.

A.

S p an renbe rr.. III TELEPHONE (217) 935-8881 X3400 MONTll July 1992 DAY AVERACE DAILY POWER LEVEL DAY AVER /,GE DAILY POWER LEVEL (hWe-Net)

(MWa-Net) f 1

0 17 920 2

0 18 919 3

0 19 916 4

0 20 918 g

5 0

21 917 6

0 22 9!/L 7

157 23 912 8

538 24 914 9

910 25 913 10 917 26 909 11 921 27 911 12 918 28 912 13 919 29 910 14 919 30 912 i5,

919 31 916 16 916

-. - -. ~.

to U-602031 Page 3 of 4 OPERATING DATA REPORT DOCKET NO.

50-461 UNIT Clinton 1 DATE 07/31/92 COMPLETED BY F. A. Spanrenberr.. 111 TELEP110NE (217) 935-8881 X3400 OPERATING STATUS 1.

REPORTING PERIOD: July 1992 GROSS HOURS IN RE"0RTING PERIOD: 744

-2.

CURRENTLY AUTliORIZED POWER LEVEL (MVt): 2894 MAX.. DEPEND. CAPACITY (MDC) (MVe-Net): 930 DESIGN ELECTRICAL RATING (MVe-Net): 223 3.

POWER LEVEL TO WilICH RESTRICTED (IF ANY) (MVe-Net):

None 4.

REASONS FOR RESTRICTION (IF ANY): N/A l

l THIS MONTH YR TO DATE CUMUIATIVE 5.

NUMBER OF. HOURS REACTOR WAS CRITICAL.

621.7 2.397.1 26.845.4 I

6.

REACTOR RESERVE SHUTDOWN HOURS.........

O0 0.0 0.0 7.

liOURS GENERATOR ON LINE......

600.1 2.221.4 25.850.5

-8.

UNIT RESERVE ulUTDOWN !!OURS..

0.0 0.0 0. 0 --

9.

' GROSS TilERMAL ENERGY GENERATED _(MWH).., 1.647.646 5.573.044 66.331.777 10.

GROSS ELECTRICAL ENERGY CENERATED (MWil) 546.529 1.843.555 21.920.645 1-

11.

NET ELECTRICAL ENERGY GENERATED (MWH)..

$18.679 1.743.825 20.795.223

12.. REACTOR SERVI'E FACTOR....

'83.6%

46.9%

65.4%

C

-13.

REACTOR AVAIIABILITY FACTOR...

83.6%

46.9%

65.4%

14.-

UNIT = SERVICE FACTOR..............

80.7%

43.5%

62.9%

15;.. UNIT AVAILABILITY FACTOR.

80.7*

43.5%

62.9%

16~ LUNIT CAPACITY FACTOR (Ueine, MDC).

75.0%

36.7%

54.4%

17. -UNIT CAPACITY-FACTOR (Using Design MWe) 74.74 36.6%:

-54.33 F-

18. -l UNIT FORCED 06fAGE-RATE............

0.0%

13.5%

13.9%

i-lJ

-19. I S!!UTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, DURATION OF EACil):

l No thutdowns are currently scheduled over the next six months.

20. 'IF SHUT.DCVN AT END OF REPORT PEFIOD, ESTIMATED DATE OF STARTUP: ~N/A l

.sa.c

2-

' 1, to'Ur602031 Page-4.'of 4 1'

-UNIT SHUTDOWNS AND POWER REDUCTIONS-f DOCKET NO. 50-461 UNIT-Clinton 1

-DATE -07/31/92 COMPLETED BY F. A.:Spanr.enbere_. III TELEPHONE- (21Ti-935-8881 X3400 REPORT MONTH July'1992 i

METHOD OF TYPE SHUTTING DOWN F:

FORCED DURATION THE REACTOR'OR

CORRECTIVE? ACTIONS' i

NO.

DATE 5:

SCHEDULED (HOURS)

REASON (1)

REDUCING'POVER(2) /COM.MENTS 92-06 920623 S 143.9

.B:-The plant shutdown to.

1: The reactor Following effect repairs of the remained shut down replacement of.

~

'B' t.urbine driven

.until repairs were' the 'B*: reactor-reactor feedwater complete.

recirculation i

. pump and investigate

' pump' seal, and'

' L the

'B' Reactor-

- repair of the-Recirculation pump

'B' reactor seal temperature feedwater e

alarm was continued -

turbine ~and-from the previous m,in steam-month.

isolation valve 1B21-F022D, the.

, unit was returned to se rvice.

I i

a (1), Reason

+

1 A-Equipment Failure'(explain), B-Maintenance or Test, C-Refueling, D-Regulatory Restrict _ ion, E-Operator Training & License' Examination, F-Administrative, G. Operational Error (explain),

-H-Other (explain)

(2) Method-1-Manual, 2-Manual Scram, 3-Automatic Scram, 4-Other (explain) k 5

m

--e

+

1

-p w-e e

=

w

-, -. ->