Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20097G006 + (ML20097G006)
- BSEP-96-0051, Forwards Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves + (ML20097G007)
- 0CAN029605, Forwards Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves + (ML20097G010)
- LIC-96-0012, Forwards Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves + (ML20097G014)
- ML20097G020 + (ML20097G020)
- NRC-96-0007, Provides Response to Requested 180-day Actions Required by GL 95-07, Pressure Locking & Thermal Binding of Safety- Related Power-Operated Gate Valves + (ML20097G022)
- ML20097G023 + (ML20097G023)
- LIC-96-0018, Certifies That ANI & Maelu Policies 96134 & Nelia Policy 95087 for on-site Property Damage & Decontamination Insurance Will Be in Force as of 960401 + (ML20097G024)
- ML20097G025 + (ML20097G025)
- RBG-42477, Forwards 180-day Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves + (ML20097G026)
- ML20097G029 + (ML20097G029)
- ST-HL-AE-5296, Requests to Update NRC Distribution Lists to Reflect New Title + (ML20097G039)
- ML20097G040 + (ML20097G040)
- 05000298/LER-1995-022, :on 951213,reactor Trip Signal,Esf Occurred. Caused by Personnel Error.Training to Maint Planners Provided to Enhance Ability to Identify & Develop Post Maint Testing Requirements + (ML20097G041)
- ML20097G042 + (ML20097G042)
- U-602547, Discusses Info Re Change to QA Program Re Method Util Plans to Use for Meeting Procedure Adherence Guidelines Contained in ANSI N18.8-1976 + (ML20097G044)
- ML20097G046 + (ML20097G046)
- JAFP-92-0454, Special Rept:On 911003,discovered pin-hole Leak in Diesel Fire Pump.Caused by Discharge Pressure.Surveillance Test Procedure Was Revised + (ML20097G055)
- BECO-LTR-96-008, Monthly Operating Rept for Jan 1996 for Pilgrim Nuclear Power Station + (ML20097G066)
- ML20097G068 + (ML20097G068)
- ML20097G069 + (ML20097G069)
- ML20097G077 + (ML20097G077)
- ML20097G078 + (ML20097G078)
- ML20097G080 + (ML20097G080)
- 1CAN069201, Forwards Rev 0 to SIR-92-037, ASME Code Case N-481, Evaluation of Arkansas Nuclear One Unit 1 Reactor Coolant Pumps. Rept Provides Results of VT-2 Exam & ASME Code Case N-481 Evaluation + (ML20097G081)
- ML20097G085 + (ML20097G085)
- 05000362/LER-1984-033-01, :on 840805,plastic Const Cap Discovered Obstructing Annular Suction Line Between Condensate Storage Tank T-121 & Sump Area of Condensate Storage Tank T-120. Caused by Misinterpretation of Design + (ML20097G091)
- ML20097G095 + (ML20097G095)
- 05000265/LER-1984-007-01, :on 840610,90% Closed Limit Switch Stuck in Closed Position.Due to Intense Heat Near Control Valves, Switch Removed to Determine Cause.Cause Unknown.Mod M-4-1(2)-84-20 in Process + (ML20097G112)
- ML20097G115 + (ML20097G115)
- ML20097G134 + (ML20097G134)
- ML20097G150 + (ML20097G150)
- ML20097G155 + (ML20097G155)
- ML20097G164 + (ML20097G164)
- ML20097G169 + (ML20097G169)
- IR 05000321/1996001 + (ML20097G171)
- ML20097G172 + (ML20097G172)
- ML20097G184 + (ML20097G184)
- ML20097G187 + (ML20097G187)
- 05000249/LER-1984-009-07, :on 840808,operator Received Alarm Indicating High O2 Concentration in Torus.Caused by Failure of Torus to Reactor Bldg Vacuum Breaker 3-1601-20B Due to Shearing of Flathead Mounting Bolts + (ML20097G191)
- ML20097G205 + (ML20097G205)
- ML20097G206 + (ML20097G206)
- ML20097G207 + (ML20097G207)
- ML20097G210 + (ML20097G210)
- ML20097G215 + (ML20097G215)
- 05000395/LER-1984-036, :on 840808,during Unrelated post-maint QC Insp, Kaowool on Ventilation Ducts in Battery Ventilation Rooms IB-23-01 & IB-23-02 Discovered Degraded or Missing.Cause Unknown.Repairs Completed + (ML20097G216)
- ML20097G218 + (ML20097G218)
- L-92-155, Forwards Public Version of Rev 52 to EPIP 3100023E, On-Site Emergency Organization & Call Directory. W/920609 Release Memo + (ML20097G227)
- ML20097G229 + (ML20097G229)
- 3F0296-15, Informs NRC of Delay in Meeting Commitment Made in FPC to Provide Mecatiss Fire Barrier Endurance Test Results by 960215.Final Test Repts from Ul Delayed.Complete Set of Test Repts Provided by 960401 + (ML20097G232)
- ML20097G235 + (ML20097G235)