Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20097A037 + (ML20097A037)
- ML20097A053 + (ML20097A053)
- ML20097A072 + (ML20097A072)
- ML20097A084 + (ML20097A084)
- ML20097A090 + (ML20097A090)
- ML20097A093 + (ML20097A093)
- ML20097A111 + (ML20097A111)
- ML20097A115 + (ML20097A115)
- LD-92-069, Forwards Rept NPX80-IC-DR-791-02, Human Factors Engineering Stds,Guidelines & Bases for Nuplex 80+. Rept Provides Info to Suppl Previous RAI Responses on Human Factors Engineering of Control Room,In Fulfillment of 920417 Commitments + (ML20097A118)
- ML20097A125 + (ML20097A125)
- ML20097A127 + (ML20097A127)
- ML20097A129 + (ML20097A129)
- RBG-42414, Forwards Response to NRC Ltr Re Violations Noted in Insp Rept 50-458/95-25.Corrective Actions:Condition Rept 95-1145 Was Initiated to Document Described Condition & Implement Corrective Actions + (ML20097A133)
- ML20097A135 + (ML20097A135)
- 05000458/LER-1996-002, :on 960105,return Piping Weld for RHR Was Missing from Suppression Pool Level.Caused by Lack of Fusion on C Steel Side of Weld.Reassembled Pipe in Sys During Scheduled Maint Period Outage + (ML20097A138)
- NRC-92-0067, Forwards Rev 19 to Physical Security Plan.Rev Withheld + (ML20097A149)
- ML20097A150 + (ML20097A150)
- ML20097A157 + (ML20097A157)
- 05000446/LER-1996-001, :on 960107,allowed Outage Time Was Exceeded in Conjunction W/Enforcement Discretion for RCS Instrument Channel.Caused by Action Statement Requirements Not Being Met + (ML20097A159)
- ML20097A163 + (ML20097A163)
- ML20097A164 + (ML20097A164)
- 05000458/LER-1995-013-02, :on 951228,operation Was Outside TS Limits Due to Trip,Maint & Repair of EDG Ii.Repaired Lube Oil Cooler Leak + (ML20097A169)
- NG-96-0063, Application for Amend to License DPR-49,proposing Rev to Ts. Proposed Change Will Revise CR Scram Insertion Time Testing Limits + (ML20097A172)
- ML20097A178 + (ML20097A178)
- JPN-96-005, Forwards Application for Amend to License DPR-59,allowing RCS Pressure Tests to Be Performed While Remaining in Cold Shutdown Mode + (ML20097A183)
- ML20097A186 + (ML20097A186)
- ML20097A187 + (ML20097A187)
- ML20097A192 + (ML20097A192)
- ML20097A193 + (ML20097A193)
- ML20097A213 + (ML20097A213)
- ML20097A227 + (ML20097A227)
- ML20097A229 + (ML20097A229)
- ML20097A235 + (ML20097A235)
- JPN-92-024, Responds to Requesting That Util Review FitzPatrick IPE to Assess Accuracy of IPEs Underlying Evaluations & Conclusions & Reconcile W/Findings of Det + (ML20097A244)
- ML20097A254 + (ML20097A254)
- U-101988, Interim Part 21 & Deficiency Rept Re ASTM A-36 Plate Matl. Initially Reported on 840803.Investigation Plan Implemented as Listed.Next Rept Will Be Provided in Approx 90 Days + (ML20097A262)
- ML20097A263 + (ML20097A263)
- ML20097A268 + (ML20097A268)
- ML20097A276 + (ML20097A276)
- ML20097A279 + (ML20097A279)
- ML20097A283 + (ML20097A283)
- PLA-2273, Monthly Operating Repts for Jul 1984 + (ML20097A284)
- ML20097A286 + (ML20097A286)
- 05000348/LER-1984-014, :on 840804,found Potentiometers for Channel NI-43 Input to OT-delta-T Circuit Not Adjusted.Caused by Procedural Inadequacy in Adjustments.Rev to Procedures Planned + (ML20097A296)
- ML20097A309 + (ML20097A309)
- ML20097A311 + (ML20097A311)
- 1CAN059202, Revises Commitments Re Surveillance Testing,Temp Monitoring & Operator Actions Following HPI Backflow Event in 1989 & Updates NRC on Current Actions Being Taken as Result of Event + (ML20097A313)
- ML20097A317 + (ML20097A317)
- ML20097A333 + (ML20097A333)
- ML20097A335 + (ML20097A335)
- ML20097A338 + (ML20097A338)