ML20097A093

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Jul 1984
ML20097A093
Person / Time
Site: Saint Lucie, Turkey Point, 05000000
Issue date: 07/31/1984
From: Grant N, Williams J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
PNS-LI-84-279, NUDOCS 8409130173
Download: ML20097A093 (17)


Text

.

AVER AGE DAILY UNIT POWER LEVEL DOCKET NO.

50-250 UNIT Turkey Point #3 l

DATE 8-15-84 COMPLETED BY N.W. Grant TELEPilONE (305) 552-3675 MONTH July, 1$84 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net)

-(MWe-Net)

~

666 248 666 664 2

33 668 668 3

19 669-668 4

20 673 667 5

673 670 6

22 672 678 7

23 8

672 24 I

671 9

35 670 672 10 26 670 673 2,

13 528 669 23 33 671 671 34 30 15 670 31 16 INSTRUCTIONS On this format.hst the average daily unit power leselin MWe Net for each day in the reporting month. Compute to the nearest whole exgawait.

(9/77) 8409130173 840731 PDR ADOCK 05000250 R

PDR

,l r

OPERATING DATA REPORT DOCKET NO.

50-250 DATE 8-15-84 COMPLETED BY N W. Grant TELEPHONE (305) 552-3675 OPERATING STATUS Turkey Point Unit #3 Notes

1. Unit Name:
2. Reporting Period:

Jul v. 1984 Unit #3 operated at power

3. Licensed Thermal Power (MWI):

2.200 except as indicated in the 760

" Uni-t Shutdowns and Power -

4. Namepiste Rating (Gross MWe):

693 Redu*ctions" Report.

5. Design Electrical Rating (Net MWe).

700

6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependsble Capacity (Net MWe):

666

8. If Changes Occur in Capacity Ratir.gs (Items Number 3 T' rough 7) Since last Report, Give Reasons:
9. Power Level To Which Restricted,if Any (Net MWe):
10. Reasons For Restrictions,if Any:

This Month Yr to.Date Cumulative II. Hours In Reporting Period 744 5,111 102,176.6

12. Number Of Hours Reactor Was Critical 637.9 4,163.7 70,469.9
13. Resetor Reserve Shutdown Hours 0

.0 B44.4

14. Hours Generator On.Line 631.8 4,058.3 69,980.3 0

0 121.8

15. Unit Reserve Shutdown 1(ours
16. Gross Thermal Energy Generated (MWH) 1,386,143 8,713,493 144,202,085 I? Gross Electrics! Energy Generited (MWH) 442,225,

2,806,765 46,017,330

18. Net Electrical Energy Generated (MWH) 418,797 2,657,641 43,570,638

~

19. Unit Service Factor 84.9

/9.4 68.b

20. Unit Availability Factor 84.9 79.4 68.6
21. Unit Capacity Factor (Using MDC Net).

84.5 78.1 65.8

22. Unit Capacity Factor (Using DER Net) 81.2 75.0 61.5
23. Unit Forced Outage Rate 15.1 16.0 6.0
24. Shutdowns Scheduled Oser Next 6 Months (Type.Date and Duration of Each):
25. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior o Commercial Operation):

Forecast Achiaed i

INITIAL CRITICALITY INITI AL ELECTRICITY COMMERCIAL OPER ATION (9671

50-250 DOCKET NO.

UNIT SHUTDOWNS AND POWER REDUCTIONS lurkey Point #3 UNIT NAME DATE 8-15-84 COMPLETED BY N _W. Grant REPORT MONTy July 1984 TELEPHONE (305) 552-3675 E

E

{"b Cause & Corrective j-3 yI3 Licensee

,E e,,

g

^ ' " ' "

No.

Date g

3g il 25s Event 3,7 E

Prevent Recurrence H

g-jgg Report a mu g

6 14 840712 F

112.2 A

1 84-21 CB VALVEX RCS leakage frr,m an instrument isolation valve gland required shut-down per Tech Specs. The vahe was repaired and the unit returned to power.

I 2

3 4

F: Forced Reason:

Method:

Exhibit G - Instructions i

S. Scheduled A Equipment Failure (Explain) l-Manual for Preparation of Data B Maintenance of Test 2-Manual Scram.

Entry Sheets for Licensee C Refueling

3. Automatic Scram.

Event Report iLER) File (NUREG-D-Regulatory Restriction

%Other (Explain) 0161)

E-Operator Training & License Examination F. Administrative 5

G-Operational Frror (Fxplain t x _ /.e Ao 4.#evc.v..c#

Exhibit I - Same Source 19/77)

Il-Ot her (E xplain)

SU21 MARY OF OPERATING EXPERIENCE 50-250 DOCKET HO.

UNIT Turkey Point Unit #3 August 15, 1984 DATE COMPLETED-BY N.W. Grant (305) 552-3675 TELEPHONE REPORT HONTH July, 1984 Unit #3 operated at essentially full power except as-indicated in the

" Unit Shutdowns and Power Reduction" report.

Inspection and reguirements of IE Bulletins and NUREG-0737 are continuing.

{

Florida Power & Light Company commitments for NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional information.

j i

l l

' ' - ~ -

AVERACE DAILY UNIT POWER LEVEL

~

DOCKET NO.

50-251 UNIT Turkey Point #4 DATE 8-15-84 COMPLETEDav N.W. Grant (305)552-3675 TELEPilONE MONDI July, 1984 DAY AVERACE DAILY POnR LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net)

~

-(MWc-Neil 666

~

17 665 2

is 249 666 3

649 39 669 650 4

20 671 5

649 23 629 6

658 22 7

671 23 8

673 24 9

25 671 10 671 26

~

II

~673 3,

12 668 2s 13 667 29 14 30 670 IS 669 33 16 INSTRUCTIONS On this forinar. hst the average daily unit power lewl in MWe Ses for each day in the reporting m.mth. Compute to the nearest whole twgawaii.

(9/771 L_

I OPERATING DATA REPORT

)

50-251

)

DOCKET NO. 1-15-64 DATE.

COMPLETED BY N.W. Grant TELEPHONE (305) 552-3675 OPERATING STATUS Turkey Point Unit #4 Notes

1. Unit Name:
2. Reporting reriod:

J ul _y, 1984 Unit #4 opeiated at power

3. Licensed Thermal Power (MWI):

2,200 except as indicated in the 760

" Unit. Shutdowns and Power

4. Nameplate Rating (Gross MWe):

bW Reductions" Report j

5. Design Electrical Rating (Net MWe):

700

6. Maximum Dependable Capacity (Gross MWe):

666

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power I.svel To Which Restricted,lf Any (Net MWe):
10. Reasons For Restrictions.lf Any:

This Month Yr to-Date Cumulative

11. Hours in Reporting Period 744 5.111 95,908 4/2 9 2,518.2 67,156.8
12. Number Of Hours Reactor Was Critical O

p 166.'6

13. Reactor Reserve Shutdown Hours
14. Hours Generator On Line 4/U.2 2;352.2 64,820.3 0

0 31.2

15. Unit Reserve Shutdown Qours
16. Gross Thermal Energy Generated (MWH)

__1.012.203 5,187,030 136.933,771

17. Gross Electrical Energy Generated (MWH) 324.255 1.592.755 a t R14.n57

~

306,744 1,496,925 41.200.984

18. Net Electrical Energy Generated (MWH),

63.2 46.0 67.6

19. Unit Service Factor
20. Unit Availability Factor 63.2 46.0 67.6
21. Unit Capacity Factor (Using MDC Net) -

61.9 44.0 66.3 59.5 42.3 62.0

22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate 36.8 23.6 5.3
24. Shutdowns Scheduled Oser Next 6 Months (Type. Date.and Duration of Each):
25. If Shut Down At End Of Report Period Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

Forecast Achined INITIAL CRITICALITY INITI AL ELECTRICITY COMMERCI AL OPER ATION Nf:7i

DOCKET NO.

UNIT SHUTDOWNS AND POWER REDUCTIONS Iurkey Point #4 UNIT NAME DATE 8-15-84 COMPLETED BY N.W. Grant July 1984 TELDHONE (30S) 552-3675 REPORT MONTH

~h

!E 3

h$k L

Cause & Corrective Licensee 5%

k"l

-g Action to No.

Date i

5g i

2s5 Event 5?

$5 5

j5g Report a

<N U

!O Prevent Recurrence 6

18 840706 F

273.8 A

1

-CB PUMPXX The unit shut down to repair 4A Reactor Coolant Pump number 2 seal.

The unit was then returned to power.

1 2

3 4

F: Forced Reason:

Method:

Exhibit G Instructions S. Scheduled A Equipment Failure (Expl. n) 1 Manual for Preparation of Data B Maintenance of Test 2-Manual Scram.

Entry Sheets for Licensee C. Refueling 3 Automatic Scram.

Event Report ILER) File (NUREG-D Regulatory Restriction

@-Other (Explain) 01611 E-Operator Training & License Examination F.Administ rative 5

G-Operational Error (Fxplain t r

/.e Am AEewc.w.cl Exhibit I - Same Source 19/77) 11-01her (E xplain) 1 1

SUllMARY-OF OPERATING EXPERIENCE DOCKET NO.

50- 251 Turkey PointiUnit #4 UNIT DATE August !_5, 1984 COMPLETED BY N.W. Grant (305) 552-3675 TELEPHONE REPORT MONTH July. 1984 Unit #4 operated at essentially full power except as indicated in the " Unit 3hutdown and Power

  • Reduction" report.

Inspections and requirements of IE Bulletin and NUREG-0737 are continuing.

Florida Power & Eight Company commitments to NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional information.

I i

I m_..___

AVERAGE DAILY UNIT POWER LEVEL 00~330 DOCKET No.

UNir St. Lucie #1 DATE 8-15-84 COMPLETED BY

_N.W. Grant (305)552-3675 TELEPilONE

.MONm July,1984 1

)

DAY AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL IMWe Net)

~

-(MWe-Net) 857 855 854 68 y

,3 850 3

19 851 4

20 849 433 5

21 6

851 22 852 849 7

23 852 851 g

853 24 851 9

853 25 10 846 26 "6

845 846 27 12 848 28 854 851 13 855 29 852 14 855 30 852 15 854 33 16 853 a

INSRUcnoNs On this fo mat.im the ases.ege daily unit power leselin MWe Set foi cach day m the reporting month. Compute to the nearest whole megawatt.

19/77) 4 L

OPERATING DATA REPORT DOCKET NO. _50 335 DATE 8-15-84 COMPLETED BY N.W. Grant TELEPHONE

-( 305 ) 552-3675 OPERATING STATUS St. Lucie Unit #1 Notes

1. Unit Name:
2. Reporting Period:

July, 1984 Unit #1 operated at

3. Licensed Therinal Power (MWt):

2,700 essentially full power except 893 as indicated in the "Ifnit

4. Nameplate Rating (Gross MWe):

ShudoWns and Power Reductions' 830

5. Design Electrical Rating (Net MWe):

W ep M.

6. Maximum Dependable Capacity (Gross MWe):

822

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since 1.ast Report, Give Reasons:
9. Power Level To Which Restricted,lf Any (Net MWe):
10. Reasons For Restrictions.If Any:

This Month Yr to Date Cou uldliVe II. Hours In Reporting I'eriod 744 5,111 66,719

12. Number Of Hours Reactor Was Critical 740.2 1,933.8 46,399.9
13. Resetor Reserve Shutdown Houn 0

Q 205'.3

14. Hours Generator On.Line 658.8 1,737.8 45.314 0

0 39.3

15. Unit Reserve Shutdown 1(ours
16. Gross Thermal Energy Generated (MWil) 1,732.947 4.417.136 113.085.074
17. Gross Electrical Energy Generated (MWH) 579,010 1,469,480 36,843,355 547,296 1,370,862 34,705,135
18. Net Electrical Energy Generated (MWH)~

88.5 34.0 67.9

19. Unit Service Factor
20. Unit Availability Factor 88.5 34.0 68.0 89.5 32.6 65.8
21. Unit Capacity Factor (Using MDC Net)
22. Unit Capacity Factor (Using DER Net) 88.6 32.3 64.1
23. Unit Forced Outage Rate 11.5 5.3 4.6
24. Shutdowns Scheduled Oser Next 6 Months (Type.Date.and Duration of Eachl:
25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

Forecast Arisiaed INITIA L CRITICAL.lTY INITIAL ELECTRICITY COMMERCI AL OPER ATION (9/771

50-335 DOCKET NO.

St. Lucie #1 _

UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME 8-15-84 DATE July 1984 COMPLETED BY N.W. Grant REPORT MONTH TELEPHONE (305) 552-3675 a

Cause & Corrective j{a,

.{g 3

j E~

Licensee

,Eg Action to N...

Date i

3g 2

E Event g

Prevent Recurrence yE 5

jgg Report a mO g

H 6

06 840718 F

71.7 A

1 liH HTEXCH The unit was shutdown to repair a leaking condenser tube plug. The unit remained shut down until the secondary chemistry conditions re-sulting from the tube plug leak was corrected.

Full power operation was also delayed due to secondary chemistry conditions'.

07 840726 F

11.3 A

3 84-006 HH INSTRU A malfunction of a condenser vacuum

' instrument caused a turbine and reactor trip. The unit was returned to power following the most trip review.

i i

2 3

4 Method:

Exhibit G. Instructions F: Forced Reason:

S. Scheduled A-Equipment Failure (Explain) 1 -Hanual for Preparation of Data B. Maintenance of Test 2-Manual Scram.

Entry Sheets for Licensee 3-Automatic Scram.

Event ReporI(LER) File (NUREG-C. Refueling D Regulatory Restriction

@-Other (Explain) 0161)

E-Operator Training & Ucense Examination p

5 F-Administrative l

G-Operational Error (Fxplain)

4. /.o d e A s s wc_w eri Exhibit I. Same Source l

('7/77)

Il-Other (E xplain)

SU2iMARY OF OPERATING EXPERIENCE

~

DOCKET NO.

50-335 UN.IT

.St. Lucie Unit 1 August 15, 1984 DATE COMPLETED BY N.W. Grant TELEPHONE (305) 552-3675 REPORT MONTH July 1984 Unit #1 operated at essentially full power except as indicated in the

" Unit Shutdowns and Power Reduction" Report.

Inspections and requirements of IE Bulletins and NUREG-0737 are continuing.

Florida Power & Light Company commitments for NUREG-0737 implemer,tation are continuing.

Refer to correspondence between FPL and NRC for additional information.

In accordance with requirements of NUREG-0737 Item II.K.3.3, there were no challenges to PORY or safety valves during the report month.

4 5

k.

7 AVERAGE DAILY UNIT POWER LEVEL I

50-389 DOCKET NO.

1.-

UNIT St. Lucie #2 8-15*84 DATE N.W. Grant COMPLETED By (305) 552-3675' TELEPflONE MONni July, 1984 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe. Net)

~

.(MWe-Net) 803 f

809 190 816 2

g 806 814 3

19 808 4

O 809 808 s

21 809 808 6

22 808 806 7

23 810 8

807 2.s 808 25 807 9

805 to 806 26 803 806 27 804 32 000 809 13 29 808 g.;

0 0

IS 31 808 16 INSTRUCTIONS On this forma.last the average daily unit power leselin MWe Net fus cach da) in the reporting inanth. Compute o the nearest whole NF3*att-(9/771 4

u

OPERATING DATA REPORT DOCKET NO. _50-389 DATE 8-15-84 COMPLETED BY N.W. GraEt TELEPHONE (305) 552-3675 OPERATING STATUS cie Mt #2 Notn

1. Unit Name: --

M Y' 1984 Unit #2 operated at

2. Reporting Period:

2,560 essentially full power.

3. Licensed Thermal Pcwer (MW ):
4. Nameplate Rating (Gross MWe):

804-

5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (items Number 3 Tivough 7) Since last Report,Give Reasone
9. Power Levt.1 To Which Restricted,if Any (Net MWe):
10. Reasons For Restrictions,if Any:

This Month Yr to-Date Cumulative 744 5,111 8,616

11. Hours in Reporting; Period
12. Number Of Hours Reactor Was Critical 744 5,092,4_

8.319.4

13. Reactor Reserve Shutdown Hours 0

4) 0 744 4,956.6 8,087

14. Hours Generator On.Line 0

0 0

15. Unit Reserve Shutdown Qours
16. Cross Thermal Energy Generated (MWH) 1,900,263 12,564,594

-20.222.638 632,850 4,207,510 6,750,/30

17. Grog Electrical Energy Generated (MWH) 599,375 3,981,029 6.378.615
18. Net Electrical Energy Generated (MWH)'

100.0 97.0 93.9 1

19. Unit Service Factor 100.0 97.0 93.9
20. Unit Availability Factor 102.5 99.1 94.2
21. Unit Capacity Factor (Using MDC Net)
22. Unit Capacity Factor (Using DER Net) 100.2 96.9 92.1
23. Unit Forced Outage Rate 0

2.4 5.8

24. Shutdowns Scheduled Oser Next 6 Months (Type.Date.and Duration of Each):

Refueling, October 1984, 7 weeks t

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

Forecast Achined INITIA L CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPER ATION W/771

~"

UNIT SHUTDOWNS AND POWER REDUCTIONS

' 5t.

e Unit #2 AME DATE 8-15-84 COMPLETED BY N.W. Grant REPORT MONTH Ju1y 1984 TELEPHONE (305) 552-3675

-_E E

.[ g 3

jIi Licensee E*

E",,

Cause & Corrective No.

Date i

5g i;

2s5 Event g7 fl Action to g:

E jgg Report e in u O

Prevent Recurrence H

g 5

Unit #2 had no shutdowns or significant power reductions.

l l

l l

e

, o r es -

i 2

3 4

F: Forced Reason:

Method:

Exhibit G Instructitris S Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.

Entry Sheets for Licensee C-Refueling 3-Automatic Scram.

Event Report (LER) File (NUREG-D.Regularory Restriction

@-Other (Explain) 016I)

E-Operator Training & Ucense Esamination F-Administrative 5

G-Opera ional rrnir (F xplain1

4. /.o Ao AtJripve.v.eet Eshibit I - Same Source (9/77) 11-01her ( E xplain I

j '-

i

~

SUMMARY

OF OPERATING EXPERIENCE i '

t DOCKET NO.

50-389 UNIT St. Lucie Unit #2-DATE August 15, 1984 COMPLETED BY N.W. Grant TELEPHONE (305) 552-3675 i

REPORT MONTH July, 1984 1

Unit 2 operated at essentially full power.

Inspections and requirenients of IE Bulletins and NUREG-0737 are continuing.

i Florida Power &llight Company commitments for NUREG-0737 imple.entation are conti nui ng.

Refer to correspondence between FPL and NRC for additional information.

In accordance with requirements of Technical Specification 6,9.1.6 there were no challenges to PORV or safety valves during the report month.

h,~ '

FLORIDA POWER & LIGHT COMPANY August 15, 1984 PNS-LI-84-279 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D. C.

20555

Dear Sir:

Attached are the July 1984 Operating Status Reports and Operating Summary Reports for Turkey Point Units No. 3 and 4 and St. Lucie Units No.1 and 2.

Very truly yours,

&c//Y J.W. Wil ~

.s, Jr.

Group V President Nuclear Energy JWW/PLP/djc Attachment cc:

J. P. O'Reilly, Region II

$6 I

\\

l PEOPLE... $ERVING PEOPLE

_. _ _....... _.