Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20096E699 + (ML20096E699)
- ML20096E700 + (ML20096E700)
- 05000424/LER-1991-015, :on 910829,leakage Limits Were Exceeded During LLRT of Containment Isolation Valve (Civ).Caused by Manufacturers Casting Mark on Valve Hinge Preventing Closure.Casting Mark on Valve Removed + (ML20096E701)
- 3F0592-02, Forwards Proposed Change to QA Program Description,Fsar Section 1.7 Re Frequency of Procedure Review.Qa Program Commitment Will Be Reduced to Comply W/Reg Guide 1.33,Rev 2 + (ML20096E702)
- ML20096E703 + (ML20096E703)
- ML20096E704 + (ML20096E704)
- 05000334/LER-1995-011, :on 951218,missed Source Range Surveillance Occurred.Caused by Lack of Attention to Detail by Operations Supervisors Controlling Plant Shutdown Procedure.Operations Supervisors Involved Counseled + (ML20096E705)
- 1CAN059203, Forwards Monthly Operating Rept for Apr 1992 for ANO Unit 1 & Revised Monthly Operating Rept for Mar 1992,consisting of Unit Shutdowns & Power Reductions Data + (ML20096E714)
- ML20096E720 + (ML20096E720)
- ML20096E721 + (ML20096E721)
- ML20096E724 + (ML20096E724)
- ML20096E738 + (ML20096E738)
- BSEP-96-0008, Monthly Operating Repts for Dec 1995 for Brunswick Steam Electric Plant + (ML20096E740)
- ML20096E742 + (ML20096E742)
- 05000354/LER-1995-040, :on 951218,EDG B Inadvertently Started Due to Improper Removal from Svc.Caused by Lack of Questioning Attitude by Operations Personnel.Addressed Communications Issues & Made Procedural Revs + (ML20096E743)
- B15504, Notifies NRC Re Current Status of RA Cox,Noting That Cox Had Not Completed 1995 Annual Operating Test in Accordance W/ Licensed Operator Requalification Program Because of Corrective Surgery During Last Quarter of 1995 + (ML20096E748)
- 05000354/LER-1992-005-02, :on 920415,control Room Ventilation Isolation & Emergency Filter Started Resulting in ESF Actuation.Caused by Inadequate self-checking by Technician.Technician Counseled & Event Reviewed During Training + (ML20096E752)
- 05000327/LER-1995-018, :on 951218,inoperability of C Dioxide Sys for Computer Room Resulted from Inadequate Design Change. Established Fire Watch + (ML20096E762)
- ML20096E769 + (ML20096E769)
- ML20096E773 + (ML20096E773)
- ST-HL-AE-4082, Forwards WCAP-13182, Analysis of Capsule V from Hl&P Co South Texas Unit 2 Reactor Vessel Radiation Surveillance Program & WCAP-13251, Evaluation of PTS for South Texas Unit 2, 10CFR50,App H + (ML20096E783)
- ML20096E786 + (ML20096E786)
- ML20096E794 + (ML20096E794)
- ML20096E807 + (ML20096E807)
- ML20096E811 + (ML20096E811)
- ML20096E815 + (ML20096E815)
- ML20096E817 + (ML20096E817)
- ML20096E822 + (ML20096E822)
- ML20096E834 + (ML20096E834)
- ML20096E836 + (ML20096E836)
- ML20096E845 + (ML20096E845)
- ML20096E860 + (ML20096E860)
- ML20096E861 + (ML20096E861)
- ML20096E864 + (ML20096E864)
- ML20096E868 + (ML20096E868)
- 05000456/LER-1995-020-03, :on 951223,TS 3.0.3 Was Entered Due to Having Two Inoperable Power Range Detectors.Replaced & Set Power Supply + (ML20096E872)
- ML20096E882 + (ML20096E882)
- L-96-001, Forwards Request for Time Relief from Previously Approved Relief Request VRR-4 + (ML20096E889)
- ML20096E892 + (ML20096E892)
- B15500, Provides Update on Current Activities in Progress to Resolve Issues W/Spent Resin Tank Remediation + (ML20096E895)
- ST-HL-AE-5277, Monthly Operating Repts for Dec 1995 for South Texas Project + (ML20096E904)
- ML20096E910 + (ML20096E910)
- RBG-42340, Special Rept:On 951204,Division I H Analyzer Discharge Piping Containment Penetration Check Valve Failed,Causing Containment Penetration to Be Isolated Rendering H Analyzer Inoperable + (ML20096E911)
- ML20096E912 + (ML20096E912)
- ML20096E921 + (ML20096E921)
- ML20096E924 + (ML20096E924)
- ML20096E927 + (ML20096E927)
- ML20096E930 + (ML20096E930)
- ML20096E931 + (ML20096E931)
- ML20096E933 + (ML20096E933)
- RC-96-0014, Requests NRC Review & Approval of RB Tendon Force Predictions for Upcoming Fifth Period RB Tendon Surveillance.Calculations Generated for Fifth Period Surveillance Tendon Force Predictions Encl + (ML20096E937)