MONTHYEARML20217H5221999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Byron Station, Units 1 & 2.With ML20212B9261999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Byron Station,Units 1 & 2.With ML20210R3431999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Byron Station, Units 1 & 2.With ML20209H3711999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Byron Station, Units 1 & 2.With ML20195J8001999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Byron Station,Units 1 & 2.With ML20206R6991999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Byron Station Units 1 & 2.With ML20205P7001999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Byron Station,Units 1 & 2.With ML20204C7671999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Byron Station,Units 1 & 2.With ML20199E6371998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Byron Station,Units 1 & 2.With ML20198D1501998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Byron Nuclear Power Station,Units 1 & 2.With ML20195F8321998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Byron Nuclear Power Station,Units 1 & 2.With ML20154L5501998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Byron Nuclear Power Station,Units 1 & 2.With ML20197C9051998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Byron Nuclear Power Station,Units 1 & 2.With ML20151Z9651998-08-31031 August 1998 Revised MOR for Aug 1998 for Byron Nuclear Power Station. Rept Now Includes Page 9 Which Was Omitted from Previously Issued Rept ML20237B4841998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Byron Nuclear Power Station Units 1 & 2 ML20236R1531998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Byron Nuclear Power Station,Units 1 & 2 ML20248M3071998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Byron Nuclear Station,Units 1 & 2 ML20247J9091998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Byron Nuclear Power Station,Units 1 & 2 ML20216D5881998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Byron Nuclear Power Station,Units 1 & 2 ML20248L1531998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Byron Nuclear Power Station,Units 1 & 2 ML20202G1881998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Byron Nuclear Power Station,Units 1 & 2 ML20198P2461997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20197F1201997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20199D1491997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Byron Nuclear Power Station Units 1 & 2 ML20211P8861997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20217A9031997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20211P9061997-08-31031 August 1997 Corrected Page 8 of Monthly Operating Rept for Aug 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20210L4061997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20149D9441997-06-30030 June 1997 Monthly Operating Repts for June 1997 Byron Nuclear Power Station,Units 1 & 2 ML20210L4111997-05-31031 May 1997 Corrected Page 6 of Monthly Operating Rept for May 1997 for Byron Nuclear Power Station,Unit 1 ML20141C3081997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20141E2491997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20141C3491997-04-30030 April 1997 Corrected Pp 4 & 10 of Monthly Operating Rept for Apr 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20140D7511997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20141C3281997-03-31031 March 1997 Corrected Page 4 of Monthly Operating Rept for Mar 1997 for Byron Nuclear Power Station,Unit 1 ML20141C3131997-02-28028 February 1997 Corrected Pp 4 & 6 of Monthly Operating Rept for Feb 1997 for Byron Nuclear Power Station,Unit 1 ML20136H5811997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20134L8651997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Byron Nuclear Power Station ML20133M2391996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Byron Nuclear Power Station,Units 1 & 2 ML20132C4521996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Byron Nuclear Power Station,Units 1 & 2 ML20134N0561996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Byron Nuclear Power Station,Units 1 & 2 ML20129A6861996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Byron Nuclear Power Station Units 1 & 2 ML20117N5051996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Byron Nuclear Power Station,Units 1 & 2 ML20134N0861996-08-31031 August 1996 Revised Monthly Operating Rept for Aug 1996 for Byron Unit 2 ML20134N0631996-07-31031 July 1996 Revised Monthly Operating Rept for Jul 1996 for Byron Unit 1 ML20116M6481996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Bs NPP Units 1 & 2 ML20115E2141996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Byron Nuclear Power Plant Units 1 & 2 ML20117M3851996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Byron Nuclear Power Station ML20117G6261996-04-30030 April 1996 Monthly Operating Repts for Apr 1996 for Byron Nuclear Power Station Units 1 & 2 ML20101R6151996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Byron Nuclear Power Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217H5221999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Byron Station, Units 1 & 2.With ML20217P6351999-09-29029 September 1999 Non-proprietary Rev 6 to HI-982083, Licensing Rept for Spent Fuel Rack Installation at Byron & Braidwood Nuclear Stations ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers ML20212B9261999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Byron Station,Units 1 & 2.With ML20210R3431999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Byron Station, Units 1 & 2.With ML20210E2251999-07-21021 July 1999 B1R09 ISI Summary Rept Spring 1999 Outage, 980309-990424 ML20209G1751999-07-0808 July 1999 SG Eddy Current Insp Rept,Cycle 9 Refueling Outage (B1R09) ML20207H7941999-06-30030 June 1999 Rev 0 to WCAP-15180, Commonwealth Edison Co Byron,Unit 2 Surveillance Program Credibility Evaluation ML20207H8071999-06-30030 June 1999 Rev 0 to WCAP-15178, Byron Unit 2 Heatup & Cooldowm Limit Curves for Normal Operations ML20207H7851999-06-30030 June 1999 Rev 0 to WCAP-15183, Commonwealth Edison Co Byron,Unit 1 Surveillance Program Credibility Evaluation ML20207H7771999-06-30030 June 1999 Rev 0 to WCAP-15177, Evaluation of Pressurized Thermal Shock for Byron,Unit 2 ML20209H3711999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Byron Station, Units 1 & 2.With ML20207H7561999-06-28028 June 1999 Pressure Temp Limits Rept (Ptlr) ML20207H7621999-06-28028 June 1999 Pressure Temp Limits Rept (Ptlr) ML20195J8001999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Byron Station,Units 1 & 2.With ML20207B6481999-05-25025 May 1999 SER Accepting Revised SGTR Analysis for Byron & Braidwood Stations.Revised Analysis Was Submitted to Support SG Replacement at Unit 1 of Each Station ML20195B2591999-05-19019 May 1999 Rev 66a to CE-1-A,consisting of Proposed Changes to QAP for Dnps,Qcs,Znps,Lcs,Byron & Braidwood Stations ML20206R6991999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Byron Station Units 1 & 2.With ML20195C7961999-04-28028 April 1999 Rev 2 to NFM9800233, Byron Station Unit 2 COLR for Cycle 8A (BY2C8A) M980023, Rev 2 to NFM9800233, Byron Station Unit 2 COLR for Cycle 8A (BY2C8A)1999-04-28028 April 1999 Rev 2 to NFM9800233, Byron Station Unit 2 COLR for Cycle 8A (BY2C8A) ML20205P7001999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Byron Station,Units 1 & 2.With ML20205B5091999-03-26026 March 1999 SER Accepting Relief Requests 12R-24,Rev 0 & 12R-34,Rev 0, Related to Second 10-year Interval Inservice Insp for Byron Station,Units 1 & 2 ML20205C5101999-03-21021 March 1999 Revised Safety Evaluation Supporting Improved TS Amends Issued by NRC on 981222 to FOLs NPF-37,NPF-66,NPF-72 & NPF-77.Revised Pages Include Editorial Corrections ML20204G3831999-03-19019 March 1999 Safety Evaluation Accepting Second 10-yr Interval ISI Request for Relief 12R-11 M990004, Rev 0 to NFM9900043, Byron Unit 1,Cycle 10 COLR in ITS Format W(Z) Function1999-03-17017 March 1999 Rev 0 to NFM9900043, Byron Unit 1,Cycle 10 COLR in ITS Format W(Z) Function ML20206A8831999-03-17017 March 1999 Rev 0 to NFM9900043, Byron Unit 1,Cycle 10 COLR in ITS Format W(Z) Function ML20207M9231999-03-12012 March 1999 Amended Part 21 Rept Re Cooper-Bessemer Ksv EDG Power Piston Failure.Total of 198 or More Pistons Have Been Measured at Seven Different Sites.All Potentially Defective Pistons Have Been Removed from Svc Based on Encl Results ML20204H9941999-03-0303 March 1999 Non-proprietary Rev 4 to HI-982083, Licensing Rept for Spent Fuel Rack Installation at Byron & Braidwood Nuclear Stations ML20204C7671999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Byron Station,Units 1 & 2.With ML20199G8271998-12-31031 December 1998 Rev 1 Comm Ed Byron Nuclear Power Station,Unit 1 Cycle 9 Startup Rept ML20205M7061998-12-31031 December 1998 Unicom Corp 1998 Summary Annual Rept. with ML20202F6181998-12-31031 December 1998 Cycle 8 COLR in ITS Format & W(Z) Function ML20206B4001998-12-31031 December 1998 Annual & 30-Day Rept of ECCS Evaluation Model Changes & Errors for Byron & Braidwood Stations ML20199E6371998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Byron Station,Units 1 & 2.With ML20202F6021998-12-31031 December 1998 Cycle 9 COLR in ITS Format & W(Z) Function ML20196K6731998-12-31031 December 1998 10CFR50.59 Summary Rept for 1998 ML20207H7731998-11-30030 November 1998 Rev 0 to WCAP-15125, Evaluation of Pressurized Thermal Shock for Byron,Unit 1 ML20207H8011998-11-30030 November 1998 Rev 0 to WCAP-15124, Byron Unit 1 Heatup & Cooldown Limit Curves for Normal Operation ML20198D1501998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Byron Nuclear Power Station,Units 1 & 2.With ML20196A4191998-11-19019 November 1998 Safety Evaluation Accepting QA TR CE-1-A,Rev 66 Re Changes in Independent & Onsite Review Organization by Creating NSRB ML20195F8321998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Byron Nuclear Power Station,Units 1 & 2.With 05000454/LER-1998-018, Corrected LER 98-018-00:on 980912,inoperable Unit 1 DG Was Noted.Caused by Low Lube Oil Pressure Condition.Immediately Entered Into Lcoar for AC Sources TS 3.8.1.1,Action a1998-10-0909 October 1998 Corrected LER 98-018-00:on 980912,inoperable Unit 1 DG Was Noted.Caused by Low Lube Oil Pressure Condition.Immediately Entered Into Lcoar for AC Sources TS 3.8.1.1,Action a ML20207H7671998-10-0505 October 1998 Rv Weld Chemistry & Initial Rt Ndt ML20154L5501998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Byron Nuclear Power Station,Units 1 & 2.With ML20197C9051998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Byron Nuclear Power Station,Units 1 & 2.With ML20151Z9651998-08-31031 August 1998 Revised MOR for Aug 1998 for Byron Nuclear Power Station. Rept Now Includes Page 9 Which Was Omitted from Previously Issued Rept ML20238F6551998-08-28028 August 1998 SE Authorizing Licensee Request for Relief NR-20,Rev 1 & NR-25,Rev 0 Re Relief from Examination Requirement of Applicable ASME BPV Code,Section XI for First ISI Interval Exams ML20237E2331998-08-21021 August 1998 Revised Pages of Section 20 of Rev 66 to CE-1-A, QA Topical Rept ML20237B3361998-08-14014 August 1998 B2R07 ISI Summary Rept,Spring 1998 Outage, 961005-980518 ML20237B4841998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Byron Nuclear Power Station Units 1 & 2 1999-09-30
[Table view] |
Text
_ _ _ _ _ _ _ _
y
'
- O C:mmenw::lth N) Dyron Edis:n Nuclear Station
=
O 7 4450 North Gerrnan Church Road
, (j Byron, Illinois 61010 May 8, 1992 LTR DYRON 92-0330 FILE: 2.7.200 Director, Office of Management Information and Program Control United States Nuclear Regulatory Commisnion Washington, D.C. 205$5 ATTH: Doctunent Control Deck Gentlemen:
Enclosed for ;ur information is the Monthly Performance Report covering Byron Nuclear Power Station for the period April 1 through April 30, 1992.
Sincorely, 14 /, d R. Plenlewicz Station Manager Byron Nuclent Power Station RP/DE/ph cc A.B. Davis, HRC, Region III NRC Resident Inspector Byron Ill. Dept. of Nuclear Safety M. J. Wallace/E. D. Eenigenburg Nuclear Licensing Manager Nuclear Fuel Services, PWR Plant Support D. R. Eggett, Station Nuclear Engineering INPO Records Center A. Hsia - USNRC F. Yost - Utility Data Institute, Inc.
200013 (/9 l
( 3767i4/VS ) \\ \
920D190322 920430 PDR. ADOCK 05000454 R PDR
.._ _ ~ m . .. . . . . _ . _ _ . . . _ . = _ . - . _ _ _ . . _ . . . - . . _ _ . , _ _
. . . ... _ _ . _ . . . . . _ . _ _ _ _ _ _ _ _ _ _ _ - _ . ~ _ . _ _ . . . __-.
. l e
4 I
r BYR0tl NUCLEAR POWER STATION UNIT 1 AND UNIT 2 MONTHLY PERFORMANCE REPORT COMMONWEALTH EDISON COMPANY NRC DOCKET NO. 050-454 HRC DOCKET NO. 050-455 LICENSE NO. NPT-37 LICENSE NO. NPT-66 t
(3767H/VS/1) 9
_J_,
- . ,-e,-,,-v ,~ , , .- , - . , , .
y , ._
.Ac_ , , + <, .,, . 9, y -,.e,< _ _ . . , - ,
- ~ - -- - _~ -.-~. .--- _
4 4
l
- 1. MontJLlyJapo r t for_Bylgr_Uli1T 1 for_the month of_Apill 1991 ;
A. . SW7eBIy of OPRIJ11Dg_IIPff.itnge f or Unit _l The Unit began this reporting period in Mode 1 (Power Operations). The power level varied due to load following requirernents.
l
. l f
I i
i I
I I
9 I
(3767M/VS/2) i i
t m-erw---v-w--+,veW we=+-e-- rw-r-__w-ww-+vW---vww-e- rwr w - w e w e p-sw w +-w cr rw',-ryw a vywwww o wm w e ww m-r-4=e
- ~ - - . ~ - _ - ~ . - - . - . . . _ - . - - - - - - . . - - - - . _ . . - ..- -.~. . .- - . . -
l s
~
BdEEEAIING DATA _FIEDAT
, DOCEET NO.: 050-454 ,
UNIT Dyron One !
DATE: 05/08/92 CCEPILED BY D. Ehle TELEPHONE: (815)234-5441 x2263 OPERATING STATUS
- 1. Reporting Period: April, 1992. Cross llours: .719
- 2. Currently Authorized Power Level: 3411 (MWL)
Design Electrical Rating: 1175 (MWe-gross)
Design Electrical Rating: 1120 (MWe-net)
Max Dependable Capacity: 1105 (MWe-net) ,
- 3. Power Level to Which Restricted (If Any): None 4 Reasons for Restrletion (If Any): N/A THIS MONTil YR TO DATE CUMUL ATI'/ E*
- 5. Report Period Hrs. 719 2903 5 % 056
- 6. Rx Critical Hours 719 2850.4 47,777.3
- 7. Rx Rm erve Shutdown Hours 0 0 38
- 8. !!ours venerator on Line 719 2842.1 47,146
- 9. Unit Reserve Shutdown Hours 0 0 0
- 10. Gross Thermal Energy- (MWil) 2,381,724 9,038,001 141,841,581
- 11. Gross Elec. Energy (MWH) 804,148 3,059,045 47,832,294
- 12. Net Elec. Energy (MWH) 768,294 2,918,657 4 % 138,154
- 13. Reactor Service Factor 100 98.19 82.30
- 14. Reactor Availability Factor 100 98.19 82.36
- 15. Unit Service Factor 100 97.90 81.21
- 16. - Unit Availat 111ty Factor 100 97.90 81.21 IT. Unit Copacity Factor (MDC net) 96.70 90.99 70.36
- 18. Unit Capacity Factor (DER net) 95.41 89.77 69.42
- 19. Unit Forced Outage Hrs. 0 60.9 1,403.4
- 20. Unit Forced Outage Rate 0 2.10 2.89
- 21. Shutdowns Scheduled Over Next 6 Months: N/A
- 22. If Shatdown at End of Report Period, Estimated Date of Startup N/A 23-. Units in Test Status (Prior to Commercial Operation): None
- Note . The cumulative numbers do not reflect power generated prior to commercial service.
(3767M/VS/3)
,. .. , , _- - , . - . _ . - . - _ . . _ . - , . . . . _ , . . . , , , , .. ., . _ . , . - . , _ . . . ._ . . - . ~ . -
_ - . ~ . _ . _ - . - - . - -- . _ ~ . . . - . . . . _ - . - . . . ~ . - - . - . . - _ - . . - .- -.- . -. .
L.__AYERAGE DAILY UNIT POWER LEVEL DOCKET No.: 050-454 UNITt Byron One DATE: 05/08/92 COMPILED BY: D. Ehle TELEPilONE: (815)234-5441 x2263 MONTH: April, 1992 DAY AVERAGE DAILY POWER LEVEL (MWe Net) i
- 1. 612 MW _ 16. 1923 HW .
l 1
- 2. 11Q$_liW 17 . _ __11Q;LJfW
- 3. 1107 MW 18. 1092 MW
- 4. 1107 MW -_
19 . ___ LQ1 LIM
- 5. 1109 MW 20. 1072 E
- 6. 1100 MW 21. 1DfLMW l 7, 1105.MW 22. LQSljiW ,_
- 8. 1111 MW 23. 105LMH
- 9. 1042 MW 24. 1081 MW 10, 1108 MW 25, 1002 MW
- 11. 1115 MW 26, 975 MW
- 12. 1115 MW '27. 1086 MW
- 13. 1110 MW 28, 1072 MW
- 14. 1102 MW 29, 1060 MN ,
- 15. 1031 MW _
3 0. _ 105.4_.HW INSTRUCTIONS On this form list the average daily unit power level in MWe-Net for-each day in the reporting reonth. Compute to the nearest whole megawatt. These figures will be vsed'to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit there may be occasions when the daily average power level exceeds the 100V line (or the restricted power level line.) In such cases the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
l.
(3767M/VS/4)
3 l
Report Period April, 1992 UNIT SHUTDOWNS / REDUCTIONS
- l (UNIT 1) ************************** '
No. Date Type _ Hants Peason ticthod LER Nup3heI_. System Campanent Caus_e__& Corrective Actigg_tp Prevent Recurrence 6 04/01/92 F 20 H 4 Steam Gen. High Sulfates in Unit 1 S/G continued from 1/31/92 i
eneo***********
A Summary
- TYPE Faason Method Syltem___fi_ Component F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram " reparation of ;
D-Regulatory Restriction 4-Continued Data Entry Sheet .
E-Operator Training 5-Reduced Load Licensee Event Report
& License Examination 9-Other (LER) File (NUREG-0161) i i
i (J767M/VS/5) 4 j
t
4 E. UNIOUZ_REEQRTING REOUIREMEH.I5_1UlffT li f or the montit o_f APRIL 1932 i
- 1. Safety / Relief valve operations for Unit One.
l VALVES NO & TYPE PLANT DESCRIPTION DATE ACIVATED ACIVATLOH CClin1110H OLEYENT None i
- 2. Licensee generated changes to ODCM.
HONE 4
- 3. Indications of failed fuel. '
Tuel Reliabllity Indicatort Yes TRI: 4.6E-3 pC1/cc 4 10CTR50.46 Reporting Requirements: Peak Clad temperature (PCT) changes resulting from change or errors to the ECCS evaluation model.
Current Ilcensing basis PCT plus margin allocation (*F)
Latge_Dreak LOCA Small Bre.gLLQCA 2051.3 1510.1 Explain differences from previous reports None '
I i
l (3767M/VS/6)
___._.._._ _ _ . . . _ . _ . . . . _ . - . _ . _ _ _ _ _ . _ . . _ . . _ _ _ . _ . . _ _ _ . _ . _ . . - . _ . ~_ _ . _ _ _
i F. . LICENSEE EVENT ItEPOP'1 LUHl.I_.11 i
The following is a tribular summary of all Licensee Event Reports for Byron Nuclear Power !ltation, Unit Onn, submitted during the reporting period, April 1 through April 30, 1992. This information is provided pursuant to the reportable occurrence reporting requirements as set forth in 10CFR 50.73. j Occurrence Licens.te IrenLReport Ntuher D. ate Iltle.. oI_Orcurie.nce 454 92-002 4-3-92 Loss of one of two EST Unit Crosstles 1
J s
s b
(3767M/VS/7)'
-..,..-e.- :, ,..-m.,-..m,,_ 3.,_.._--...m ., ,- im,. w w. r #. ,, - =m..wv. 1,,,w.#w_ _wwiew,,,y-.,-n,w,, w -y-w w, , , yy--~w.- y . . .m-, ,ug ,w w a
.-_.~. _ .~-. ~ - .-- . - - - - _ - = - ~ . - - .-.- . . . . -.-~... - - - - . - _ _ - - - . ~ . - ~ . , . - -- - - - . ---....-- -.--
II. MQRLhlylepart f or ByImt,1!1{IT 2 fcI_the_2onth of AprilE2 A. Smary of ODRIAt121g_ExpgLlence._fgr Unit 2 -
The Unit began this reporting period in refueling outage B2R03.
Went on line 4/30/92 f
=
7 h
I (3767M/VS/8)
'eyrg,-g7--
r y,*.v91, 9+vy - p -.eg.- ,ay+.y-,.-)se.g ,-...g.!-a- 7_. -, i 7 y,9., ,a 9 p,.,p ,, ., 9_.Ag .=g9ye wg -re-w.wr y m y-by-p rp 7y*-W3de .w' g 94 w'#--'77t'NmF9m 'em'T-"'se'-='TWD 9T -'r g M *M*#h'TW W V'*T'WWE' *'
B t...DPERATING_DATh_MEORT DOCKET 140. 050-455 l
UNIT: Byron Two DATE: 05/08/92 COMPILED BY: D. Ehle TELEPHONE: (815)234-5441 x2263 OPERATING STATUS
- 1. Reporting Period: April, 1992. Gross Hours: 719
- 2. Currently Authorized Power Lovel 3411 (MWt)
Design Electrical Rating: 1175 (MWe-gross)
Design Electrical Rating: 1120 (MWe-net)
Max Dependable Capacity: 1105 (MWe-net)
- 3. Power Level to Which Restricted (If Any) N/A
- 4. Reasons for Restriction (If Any):
THIS MONTH YR TO DATE CUMULATIVE *
- 5. Report Period Hrs. 719 2903 41,160
- 6. Rx Critical Hours 65.1 1460.2 34,694.3
- 7. Rx Reserve Shutdown Hours 0 0 0
- 8. Hours Generator on Line 19.6 1414.4 34,189.5 9 Unit Reserve Shutdown Hours 0 0 0
- 10. Gross Thermal Energy (MWH) 17,935 4,002,734 95,521,454
- 11. Gross Elec. Energy (MWH) 3004 1,357,111 32,313,880
- 12. Het Elec. Energy (MWH) -6,858 1,267,572 30,444,580
- 13. Reactor Service Factor 9.05 50.30 84.29
- 14. Reactor Availability Factor 9.05 50.30 84.29
- 15. Unit Service Factor 2.73 48.72 83.06
- 16. Unit Availability Factor 2.73 48.72- 83.06
- 17. Unit Capacity Factor (MDC net) -0.86 39.52 66.94
- 18. Unit Capacity Factor (DER not) -0.85 38.99 66.94
- 19. Unit Forced Outage Hrs. 0 0 1155.9
- 20. Unit Forced Outage Rate 0 0 3.27 ,
- 21. Shutdowns Scheduled Over Next - 6 Months: Unit 2 third refuel outage. NONE
- 22. If Shutdown at End of Report Period, Estimated Date of Startup NONE
- 23. Units in Test Status (Prior to Commercial Operation): None
- Note - The cumulative numbers do not reflect powet generated prior to commercial service.
1 l
l l
i 1
__ m _. _ - - - ._ _ __ . _ _ _ . _ . _ - _ . _ _. - = _ . _ _ _ . _ . . _ . . . _ _ _ . ~ . _ _ _ . _ _ . _ _ _
Cu _AYIRAGI_ DAILLillu_LF_QHER . LEVEL DOCKET NO. 050-455 UNIT: Byron Two DATE: 05/08/92 COMPILED DY: D. Ehle TELEPHONE: (815)234-5441 x2263 MONTH: April, 1992 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
- 1. -13 MW 16. _. -13 MW
- 2. -13 MW 17. -14 MW
- 3. -13 MW 18. -14 MW
- 4. -13 MW 19. . -14 MW
- 5. -13_JfW 20. -14 MW
- 6. -11_11W , 21. -14 MW
- 7. -13 MW 22. -14 MW
- 8. -13 MW 23. -14 MW
- 9. -13 MW 24. -13 MW
- 10. -13 MW 25. _MW
- 11. -13 MW 76. -13 MW
- 12. -13 MW 27. -14 MW
- 13. -13 MW 28. -14 MW
- 14. _-lLMW 29. -la MW
- 15. J . MW 30. 1.01 MW INSTRUCTIONS On this form list _ "* average daily unit power level in MWe-Net for each day in-the reporting month. Compute to the nearest whole megawatt. These figures.
will be used to plot a graph for each reporting month. Note that when' maximum dependable capacity is used for the net electrical rating of the unit there may be occasions when the daily average power-level exceeds the 100% line (or the restricted power. level line.) In such cases the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
(3767M/VS/10)
_ _ _ - . _-._,_.. ~_._ -_ _ _ , _ . . _ . .._ _ . . _ . , _ . _ - . - ~ _ - . _ . ~ , . _ _ . - - . - -
i -
=
Report Period April, 1992 UNIT SHUTDOWNS / REDUCTIONS
(UNIT 2) **=***********************
i i
No. Date Iype Hours Reason Meth2d LER Number System Comoonent Cause & Corrective Action to Prevent Pecurrence .
1 04/30/92 S 699:23 C ------ ---- ------ B2R03 Ended i
a TYPE Reason Method Eystem & Compspent 4 F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Reoort
& License Examination 9-Other (LER) File (NUREG-0161) l 1
^
i k
_..._.._.___._____..____..______..____-_.._.m_.___ _ . . _ _ . _
i c .
~
EdllIQUE_.EEEQEIlljG REQUIFoiEli1SJ11111I.lLIor the._montitoLApril_19.92 4
- 1. Safety /Rellef valve operations for Unit Two.
i VALVES N0 f. TYPE PLANT DESCRIPTION DATE ACTUATID ACTUAI1Oli CQKd1110!i RL EYEliI I
None 1
- 2. Licensee genesated changes to ODCH.
NONE
- 3. Indications of failed fuel.
No. Fuel Pr21 ability Indicator: FRI = Unit 2 Shutdown
- 4. 10CFR50.46 Reporting Requirements: Peak Clad temperature (PCT) changes resulting from changes or errors to the ECCS evaluations model.
Current licensing basis PCT plus major allocations ('r)
Large_BreALLOCA EmnlL.DrenLLOCA 2064.1 1510.1 Explain differences from previous report:
None l
l l
1 (3767M/VS/12)
f*
fm 11CENSEE_IYEHLBIE01TS__Unt1L11 i The following is a tabuler summary of all Licensee Event Reports for Dyron Nuclear Power Station, Unit Two, submitted during the reporting period, April 1, 1992 through April 30, 1992. This information is provided purst. ant to the reportable occurrence reporting requirements as set forth in 10CTR $0.73.
Licentee Irent_Repprt Number QC.Currengf_Date Iltig_0L QCCu1Ifutt l
455: 92-002 4-10-92 Lightning Strike Containment '
VENTILATION Violation EST F
1 l
'l l
(3767M/VS/13):
1