ML20096E703
| ML20096E703 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 04/30/1992 |
| From: | Blosser J, Mccann R UNION ELECTRIC CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| ULNRC-2638, NUDOCS 9205190330 | |
| Download: ML20096E703 (7) | |
Text
--
ty:n av riet V?:0 ia Bc,520 s
IvPr Vuu 6951 May 11, 1992 UVION Eucenuc 53 Nuclear Regulatory Commission Document Control Desk I
~
Washington, DC 20555 1
i ULNRC.2638 1
j
Dear S!r:
i DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1
.{
FACILITY OPERATINC LICENSE NPF-30 MONTilLY OPERATINC REPORT APRIL 1992 I
The enclosed Monthly Operating Report for April, 1992 is submitted pursuant to section 6.9.1.8 of the Cellaway Unit 1 Technical Specifications.
i h24t'4
/
/J. D. blosse'.~
9_ m [ w e,
Manager,'Callaway Plant JDB/DEY/RDA/ TAM /RJM/clg Enclosure cc: Distribution attached e
i 1
200011 f
- gMBa!M183}b.
e
,\\
.R
ec distribution for ULNRv-2638
[
with enclosures Mr, Richard Hague, Chief Project Section lA U. S, Nuclear Regulatory Connaission
. Region III i-799 Roosevelt Road Glen Ellyn, IL 60137
- Mr.
R.,
J. Hall (2 copies)
Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission 1 White Flint, North,' Mail Stop 13E21
-11555 Rockville, MD 20852 NRC Resident Inspector Manager, Electric Department.
Missouri Public Service Commission P.O. Box 360 Jefferson City, MO 65102 1
}
4 at
-r-c-,
,---e r--e ve, w e- + -e ve h s w, e - w+ r-.* b e
-*---*+,e+-+N,~3-r* der
- r4
+ "* + ve ' i t -s m vp v v--
r
- -e*p r w wasvi**er--*+-res' W son m.e,e w e.- = + m
bec distribution for ULNRC 2638
-with enclosures Records Center L
' Institute of Nuclear Power Operations l
Suite 1500 1100 Circle 75 Parkway.
Atlanta, CA 303'9 American Nuclear Insurers Library c/o Dottie Sherman The Exchange Suite 245 2/0 Farmington Avenue Farmington, CT 06032 l
Mr. Dan Lipman Callaway Project Manager Westinghouse Electric Corp.
P.O. Box 355 Pittsburgh, PA 15230 Mr. Fred Yost Director of Research Utility D.ta Institute 1700-K Street Northwest Suite 400 Washington DC 20006 D. F. Schnell (400)
T. P. Sharkey J. V. Laux C. D. Naslund 1
A. C. Passwater/D. - E. Shafor/D. J. Walker (470)-
C. A. Hughes M. E. Taylor J. R. Polchow D. E. Young /J. F. Hogg/K. R. Evans l
J. R. Peevy/K.W. Kuechenmeister/M.S. Evans /J.E. McLaughlin/C.R. Pendergraff l
M. B. Cleary-S. L. Dale (NSRB)-(41.)
R. J. McCann (2)
R. J. Irwin/J..M. Moose (470)
JDB Chrono E210.0001 1A160.0761 (QA Record)
~
N Date
_ lm U---a r. -,,,,,m m, v e,,.e-r -m e,- e -, n am,-1.,
ULNRC 2638-DOCKET h0.
50-483
. UNIT NAME-CALLWAY UNIT 1-
-DATE 05-11-92 COMPLETED BY R, J. McCann TELEPHONE 314/676-8243 PART A' OPERATIONS
SUMMARY
The plant was in a refueling outage during the entire month.
Ik PART B PORV AND SAFETY VALVE SUEMARY None l
0 Page'1 of 4
-~.... _ -.
..~.
.i LULNRC-2638 j-
.4 l..
PART C l
AVERAGE DAILY UNIT POWER LEVEL-i.
DOCKET No 50-483 i
UNIT Callaway Unit 1.
l DATE.
05-11-92 COMPLETED BY R. J. McCann j
TELEPHONE 314/676 8243 g-
-1 I
MONTH: APRIL 1992 AVERAGE DAILY POWER LEVEL
~ AVERAGE DAILY POWER LEVEL j-DAY (MWe-Net)
DAX (MWe) i 1
-0 17-0
{
j 2
0 18 0
l-3 0
19.
0 1
4 0
20 0
5-0 21 0
i 6
0 22 0
l' 7
0 23 0
1
{
8
'0 24-0 9
0-25 0
i 10 0
26-0 I
11 0
-27 0
[
12 0
28 0
13 0
29
'O '
14 0
30 0
.15 0-31 J
16 0-I l
Page 2 of 4
_,, _ a.
....c.-,
-. -....~._....;.._._-._._,,...,. -. _ _. _, _ _..,... -.., -.. -... - _ _. -, -.
ULNRC-2638 Part D OPERATING DATA REPORT' i
DOCKET NO, 50-483 UNIT N/.ME CALI.AWAY UN U 1 1
DATE- 05 11-92 COMPLETED BY R, J. McCANN TELEP110NE 314/676-8243 OPERATING STATUS (YTO CUM) 1 REPORTING PERIOD: April 1992 GROSS HOURS IN REPORT]NG PERIOD: 719 2903 64,524.5 2.
CURRENTLY AUTHORIZED POVER LEVEL (MVt): 3565 MAX. DEPEND. CAPACITY (MVe-Net): 1125 DESIGN ELECTRICAL RATING (MWe-Net): 1171 3.
POVER LEVEL 10 VHICH RESTRICTED (!F ANY)(MVe-Nut):
4 REASONS FOR RESTRICTION (IF ANY):
THIS MONTH O O DATE CUMULATIVi 5 NUMBER OF HOURS REACTOR VAS Cx!TICAL.
0 1878.6 55,967.1 6.
REACTOR RESERVE SHUTDOWN HOURS.,..
0 0
0 7.
HOURS GENERATOR ON LINE.,
0 1852.0 54,701.4' 8.
UNIT RESERVE SHUT 00VN HOURS.,
0 0
0 9.
GROSS THERMAL ENFRGY GENERATED (MVH).
0 6.240,467 182,503,330 10 GROSS ELECTRICAL ENERGt GENERATED (NH).
0 2,172,9.5 62.23E,089
.11.
NET ELECTRICAL ENERGY GENERATED (MWHj 0
2,011,476 59.151,024
[
1.
j
- 12. REACTOR SERVICE FACTOR.
0 64.7 86.7.
I
- 13. RFACTOR AVAILABILITY FACTOR.
0 64.7 86.7
- 14. UNIT SERVICE FACT 0F.
0 63.8.
84.8
- 15. UNIT AVAILA81LITY FACTOR.
0 6 3. 51 84.8
- 16. UNIT CAPA",lTY FACTOR (Using MDC)..
0 63.4 81.5
- 17. UNIT CAPACITY FACTOR (Using Design MVe).
0 60.9 7P.3
- 30. UNIT FORCED OUTAGE RATE.
0.0 2.5 3.0 l
- 19. SMUTDOVNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH): Refueling; nate: 3/20/92; Duration: 63 Days
- 20. IF SHUT DOWN AT END OF REPORTING PERIOD, ESTIMATED CATE OF STARitd: 5/21/92 Page 3 of 4
._... _.. _. ~,-
}
.._ l!
(BLNRC-2638 1
PART F UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-483 UNIT.NAME CALLAWAY UNIT 1 DATE 05-11-92
. COMPLETED BY R. J. McCann TELEPHONE 314/676-8243
}
PEPORT MONTH: APRIL 1992 METHOD OF' TYPE SHUTTING D0VN F: FORCr0 DURATION THE REACTOR OR No.
DATE 5: SCHEDULED (HOURS)
REASON REDUCING POWER CORRECTIVE ACTIONS / COMMENTS OS 03/20/92 S'
719.0
.C 1
On 3/20h, the unit was removed from service'and the reactor. shutdown for a normal refueltrv ou to ge. -
SUMMARY
REASON METHOD A: EQUIP..
1E (EXFLAIN) 1: MANUAL B: MAINT. Dn 1 sT 2: MANUAL SCRAM C. REFUELING 3: AU 0MATIC SCRAM D: REGULATORY RESTRICTION-4: DTHER (EXPLAIN)
E: OPERATOR TRAINING AhD LICENSE EXAMINATION F: ADMINISTRTTIVE G:_ OP: RATIONAL. ERROR (EXPLAtN)
H: OTHER (EXPLAIN) l l
c l
m
--