Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20095K998 + (ML20095K998)
- ML20095L000 + (ML20095L000)
- ML20095L005 + (ML20095L005)
- ML20095L007 + (ML20095L007)
- ML20095L008 + (ML20095L008)
- ML20095L012 + (ML20095L012)
- ML20095L014 + (ML20095L014)
- ML20095L016 + (ML20095L016)
- ML20095L022 + (ML20095L022)
- ML20095L023 + (ML20095L023)
- ML20095L028 + (ML20095L028)
- JAFP-92-0358, 1991 Radiological Environ Operating Rept + (ML20095L031)
- 05000423/LER-1992-010-01, :on 920401,discovered That Surveillance Requirements Not Met Re Testing of Atmosphere Cleanup Filter Units.Caused by Failure to Identify Proper Surveillance Test Requirements.Procedures Revised + (ML20095L035)
- 05000325/LER-1992-011, :on 920406,coil of Control Relay in Containment Atmospheric Control Sys Failed,Resulting in Loss of Power to Containment Isolation Valves.Caused by Relay Aging.Relay Coil Replaced & Action Plan Developed + (ML20095L036)
- ML20095L037 + (ML20095L037)
- SNRC-1070, Forwards Updates on Operating Shift Staffing Submittals & 840322,per 840531 Request.Updates Include Qualification Matrices for Onsite Mgt,Operating Shift Personnel & Shift Technical Advisors + (ML20095L040)
- ML20095L041 + (ML20095L041)
- ML20095L047 + (ML20095L047)
- 3F0592-01, Forwards Annual Financial Rept for 1991 & Annual Financial Repts for Participating Owners of Crystal River Unit 3. Sebring Utils Commission Rept Will Be Submitted Upon Receipt by FPC + (ML20095L050)
- ML20095L059 + (ML20095L059)
- ML20095L064 + (ML20095L064)
- ML20095L067 + (ML20095L067)
- ML20095L068 + (ML20095L068)
- ML20095L074 + (ML20095L074)
- ML20095L077 + (ML20095L077)
- ML20095L080 + (ML20095L080)
- ML20095L083 + (ML20095L083)
- ML20095L086 + (ML20095L086)
- ML20095L096 + (ML20095L096)
- ML20095L098 + (ML20095L098)
- ML20095L102 + (ML20095L102)
- ML20095L105 + (ML20095L105)
- ML20095L108 + (ML20095L108)
- 0CAN088415, Requests Withdrawal of 840725 Notice of Violation & Proposed Imposition of Civil Penalty.Corrective Actions Initiated Prior to Enforcement Action,Including Augmenting QA Staff,Retraining QC Staff & Increasing Vendor Surveys + (ML20095L111)
- 05000455/LER-1992-002-10, :on 920410,containment Ventilation Isolation Occurred Due to Voltage Transient.Caused by Lightning Strike.All ESF Actuations Reset + (ML20095L117)
- 05000271/LER-1992-013, :on 920410,maint of Filled Discharge Piping for CS Surveillance Test Missed.Caused by Personnel Error. No Immediate Corrective Action Necessary + (ML20095L118)
- ML20095L119 + (ML20095L119)
- 05000334/LER-1992-005, :on 920402,surveillance of River Water for Component Cooling Water HX Was Missed.Caused by Personnel error.RW-645 Was Verified in Correct Position + (ML20095L126)
- ML20095L132 + (ML20095L132)
- ML20095L134 + (ML20095L134)
- 3F1295-18, Forwards Crystal River Unit 3 Seismic Evaluation Rept for USI A-46, Rev 0 + (ML20095L141)
- ML20095L146 + (ML20095L146)
- 05000454/LER-1992-002-11, :on 920403,loss of One of Two ESF Unit Crossties Noted.Caused by Personnel Error.Review of Electrical non-technical Surveillances Performed & Procedures Revised + (ML20095L149)
- NRC-95-4616, Submits Responses to RAI on AP600 Design Certificate Program + (ML20095L164)
- ML20095L165 + (ML20095L165)
- ML20095L169 + (ML20095L169)
- ML20095L173 + (ML20095L173)
- ML20095L176 + (ML20095L176)
- ML20095L182 + (ML20095L182)
- ML20095L184 + (ML20095L184)
- ML20095L190 + (ML20095L190)