Drew 0. Fetters z t., ;
vic. Pn, ant J*'
Station Support 10CFR50.71(e)(4)
PECO' ENERGY gm t:w s u c
Wayne, PA 19087 5691 610 640 6650 December 27,1996 -
' Docket Nos. 50-277; 50-278 License Nos. DPR-44 DPR-56
.U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 c
SUBJECT:
Peach Bottom Atomic Power Station, Units 2 and 3 Submittal of Revision 13 of the Updated Final Safety Analysis Report j
Dear Sirs:
In accordance with 10CFR50.71(e)(4) and 10CFR50.4(b)(6), this letter submits one original and ten (10) copies of Revision 13 of the Updated Final Safety Analysis Report (UFSAR) for Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3. The enclosed copies are being provided g
~
to the NRC wkh a page revision listing that identifies the latest revision date of all current pages in accordance wkh 10CFR50.71(e)(1). We have also provided page replacement instructions for incorporating Revision 13 into the UFSAR. As required by 10CFR50.71(e)(5), each replacement page contains a bold vertical line in the margin adjacent to each area changed along wkh the -
4 date of the change. Revision 13 reflects changes made up to a maximum of six months prior to this submktal in accordance wkh the requirements of 10CFR50.71(e)(4). As a result, the UFSAR Revision 13 reflects changes made to PBAPS, Units 2 and 3, under the provision of '10CFR50.59, at least up to June 30,1995.
The enclosed UFSAR Revision 13 also contains the annual revision of the Quality Assurance (QA) Program Description which is being submitted in accordance with 10CFR50.54(a)(3). The revised QA Program Description (i.e., Appendix D of the UFSAR) reflects editorial and organizational changes and those changes described in Attachment 1 as required by 10CFR50.54(a)(3)(ii).
Based on the information provided in Attachment 1, we have concluded that the QA Program Description changes included in Revision 13 do not reduce the commitments in the QA Program
[
Description previously accepted by the NRC.
020014 lp
'9601020026' 9"227 PDR ADOCK O ~00277 K
PDR u
s.
=
Page 2 As required by 10CFR50.71(e)(2)(1), I certify that to the best of my knowledge, Revision 13 of the PBAPS UFSAR accurately reflects information and analyses submitted to the NRC, or prepared pursuant to NRC requirements as described above. In addition, as required by 10CFR50.71(e)(2)(li), Attachment 2 to this letter identifies changes made under the provision of 10CFR50.50 and included in the encioned Revision 13, but not previously submitted to the NRC.
if you have any questions or require further information, please contact us.
Sincerely,
(
L Attachments Enclosure i
cc:
T. T. Martin, Administrator, Region I, USNRC (w/ attachments & enclosure)
USNRC, Senior Resident inspector, PBAPS (w/ attachments & enclosure) l I