ML20095L083
| ML20095L083 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 05/01/1992 |
| From: | Gates W OMAHA PUBLIC POWER DISTRICT |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| GL-89-01, GL-89-1, GL-90-06, GL-90-6, LIC-92-171R, NUDOCS 9205060210 | |
| Download: ML20095L083 (1) | |
Text
r l
l Omaha Public Power District
_h.
444 South 16th Street Mall Omaha, Nebraska 68102-2247 402/636-2000 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station Pl-137 Washington, DC 20555
References:
1.
Docket 50-285 2.
Letter from 0 PPD (W. G. Gates) to NRC -(Document Control Desk) dated December 19, 1990. (LIC-90-0982) 3.
Letter from OPPD Desk) dated Febru(aryW. G. Gates) to NRC (Document Control 28, 1992.
(LIC42-058L)
Gentlemen:
SL'BJECT:
Revision to Proposed Technical Specification Change Submittal Dates The purpose of this letter is to document notificatian to the NRC of changes in submittal dates for Technical Specification Changes proposed in References 2 and 3.
The cLanges have been discussed with Messrs. P. H. Harrell and S. D. Bloom of your staff.
Omaha Public Power District (OPPD) committed in Refe ence 2 to submit a Technical Specification Change to implement the requirements of Generic Letter 90-06 (additional limitations on Power Operated Relief Valves)lete the processing of by the end of the 1992 refueling outage.
OPPD requires additional time to comp this change and is revising the submittal date to no later than June 1,1992.
OPPD committed in LER-92-028 Rev. 1 Reference 3) to submit a Technical Specification Change to implement the rec (ommendation of NRC Generic letter 89-01 (relocate the requirements for Radioactive Effluent Technical Specifications) by April 30, 1992.
In preparing this change, it was determined that a minor modification would be required to implement the proposed changes.
Additional planning time was required to ensure that this modification could be completed in o. der to su, art the amendment request.
Therefore, OPPD is revising the submittal date ior this Technical Specification Change to no later than June 1 1992.
If you should have any questions, please contact me.
Sincerely,
/4.-.5-W. G. Gates Division Manager Nuclear Operations WGG/sel c:
LeBoeuf, Lamb, Leiby & MacRae D. L. Wigginton, NRC Senior Project Manager S. D. Bloom, NRC Project ingineer R. D. Martin, NRC Regional Administrator, Region IV R. P. Mullikin, NRC Senior Resident Inspector 9205060210 920501 00 "DR ADOCK 05000285 P
paa (d
cs sm ens - g y m
--