Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20095F401 + (ML20095F401)
- ML20095F404 + (ML20095F404)
- ML20095F405 + (ML20095F405)
- ML20095F411 + (ML20095F411)
- BSEP-95-0634, Monthly Operating Repts for Nov 1995 for Brunswick Steam Electric Plant + (ML20095F412)
- TXX-4277, Advises of Executed Contract DE-CR01-84RW00012 W/Doe for Disposal of Spent Nuclear Fuel from Facilities.Related Info Encl + (ML20095F420)
- ML20095F438 + (ML20095F438)
- ML20095F460 + (ML20095F460)
- NRC-95-4601, Forwards Rev 1 to WCAP-14254, AP600 SPES-2 Test Analysis Rept. Rept Withheld (Ref 10CFR2.790) + (ML20095F471)
- ML20095F473 + (ML20095F473)
- ML20095F476 + (ML20095F476)
- ML20095F492 + (ML20095F492)
- ML20095F494 + (ML20095F494)
- ML20095F501 + (ML20095F501)
- ML20095F511 + (ML20095F511)
- ML20095F520 + (ML20095F520)
- LIC-95-0233, Monthly Operating Rept for Nov 1995 for FCS Unit 1 + (ML20095F521)
- PY-CEI-NRR-2010, Monthly Operating Rept for Nov 1995 for Perry Nuclear Power Plant Unit 1 + (ML20095F526)
- BVY-95-139, Forwards Rev 3 of Cycle 18,COLR, for VT Yankee Power Station + (ML20095F530)
- L-84-173, Responds to NRC Re Violations Noted in Insp Repts 50-335/84-18 & 50-389/84-19.Corrective Actions: Installed Detectors Will Be Replaced & Two Spare Detectors Properly Calibr + (ML20095F534)
- ML20095F538 + (ML20095F538)
- ML20095F544 + (ML20095F544)
- ML20095F552 + (ML20095F552)
- ML20095F576 + (ML20095F576)
- ML20095F586 + (ML20095F586)
- ML20095F588 + (ML20095F588)
- ML20095F589 + (ML20095F589)
- L-84-178, Responds to NRC Re Violations Noted in Insp Repts 50-250/84-14 & 50-251/84-14.Corrective Actions:Tracking Sys Developed to Ensure That All License Amend Requirements Will Be Met During Implementation Process + (ML20095F590)
- ML20095F597 + (ML20095F597)
- ML20095F602 + (ML20095F602)
- PY-CEI-NRR-0135, Forwards Addl Clarifications to Rev 3 to Emergency Plan OM-15A Submitted on 840428.Clarifications Include Changes to Plan Per Sser 4 & Will Be Incorporated Into Rev 4 + (ML20095F606)
- ML20095F607 + (ML20095F607)
- AECM-84-0364, Responds to NRC Re Violations Noted in Insp Rept 50-416/84-16.Corrective Actions:Safety & Environ Evaluation Performed,Procedures for Work Control to Be Revised & Site QA Audit Rept Reviewed + (ML20095F608)
- ML20095F618 + (ML20095F618)
- ML20095F622 + (ML20095F622)
- ML20095F623 + (ML20095F623)
- ML20095F647 + (ML20095F647)
- 05000352/LER-1995-009-01, :on 951113,pressure Setpoint Drift of Ms Sys Safety Relief Valves Occurred.Caused by Corrosion Induced Bonding Between Pilot Disc Seating Surfaces.Several Modified SRV Pilot Discs Installed + (ML20095F654)
- ML20095F655 + (ML20095F655)
- ML20095F660 + (ML20095F660)
- ML20095F663 + (ML20095F663)
- 05000370/LER-1992-004-02, :on 920321,reactor Trip Occurred as Result of Hi Hi SG Level on SG 2C.Caused by Equipment Failure & Possible Installation Deficiency.Work Request 146995 Initiated to Investigate & Repair Problem + (ML20095F678)
- ML20095F690 + (ML20095F690)
- JPN-95-053, Forwards Application for Amend to License DPR-59,revising TSs to Incorporate IST Requirements of Section XI of ASME Boiler & Pressure Vessel Code + (ML20095F692)
- ML20095F705 + (ML20095F705)
- 3F1295-14, Conveys Acceptance of Results NRC Presented at 951031 Meeting of SALP Evaluation for Facility & Util Commitment to Address Issues Noted + (ML20095F707)
- ML20095F709 + (ML20095F709)
- ML20095F724 + (ML20095F724)
- ST-HL-AE-1115, Opposes Requirement Re Designing for Arbitrary Intermediate Breaks.Approval for Listed Alternative Pipe Break Criteria Requested,Excluding RCS Primary Loop.Addl Info Supporting Request Encl + (ML20095F728)
- ML20095F735 + (ML20095F735)
- ML20095F742 + (ML20095F742)