Panda Steady State Tests (S1-S6) Non-Proprietary Apparent Test Results
ML20095F552
Person / Time
Site: 05200004
Issue date: 10/26/1995
From: Wungate G
GENERAL ELECTRIC CO.
To:
Shared Package
ML20095F556 List:
References
25A5779, 25A5779-R, 25A5779-R00, NUDOCS 9512190090
Download: ML20095F552 (11)


Text

'. 3 4

GENuclearEnergy

    • 'y 1

EISIDENT: Si1WR PANDA REVISION STATUS SiiEt2 DOCUMENTTITI.E PANDA Steady State Tests (SI S6) Non. Proprietary Apparent Test Results LEGF.NI) OR11ESCRIEnQtLOf_GROUfS 1YPE:

Test Report FMF:

MPl. WO:

Tl5-5010 Tills ITEh! IS OR CONTAINS A SAFfl1Y.REI ATED ITEh! YES @NO O EQUirClaSSCODE e REVISION l C 1

0 RM 02954 g

l

\\

PRINTS TO MADEDY APPROVAIS GENERAL, El.ECl RIC COMI'ANY C. A. WINGATP. 10/19/95 J.E. TORilECK 10/24/05 175 CURTNER AVENUP.

SAN]OSE cal.lFORNI A 95125 ISSUED CilKD llY:

R. AlIMANN OCT B 619%

A. FORTIN 10/24/95 CONT ON SI1EET 2 AIS WORD (S/28/94)

DISK 25A5779 gIS 9512190090 951213 PDR ADC,0K 05200004 A

PDR

25A5779 sa No 2.

GENnsch!nerEnergy TAllt.E OF CONTENTS

1. G EN ERAI. D ES C RI PTIO N..................................................................................................... 3 1.1Scol'r................................................................................................................................................S 1. 2 RE P O RT O aj E cTl VEs..................................................................................................................

2.TESTRESULTS.......................................................................................................................4 2.1 ST E A I lY STA T E TE ST S 1.......................................................................................................

2. 2 ST E A I lY STAT E TEST S 2......................................................................................................
2. 3 ST E A 11Y STA T ETEST S S......................................................................................................
2. 4 ST E A i>YSTAT E TEST S 4.......................................................................................................

2.5 ST E A 11Y STAT E TEST S 5................................................................................................

2. 6 ST E A I)Y STAT E TF ST S 6.......................................................................................................

I l

I l

i i

i 1

l r

l 1

f

l i

\\

25A5779 sH No. 3 h

GENuclearEnergy

1. GF.NERAI,DESCRilrTION 1.1 Scope This Apparent Test Result:(ATR) report provides a non proprietary version of testing conducied at the Paul Sherrer Institut(PSI). This report covers the PANI)A steadystate l'CC performance tests Sl through SG.

1.2 Report Objectives This ATR summari7cs the apparent results and includes: test number, test objective,'est date and time, data recording period, data analpis period, name of data file, list of failed or imavailabic instruments considered to be required for the test, deviations from test procedure atiu problems occurring during test. Statements are made as to whether or not the test objectives have been reached and the data were recorded correctly. A tabic of representative instruments and the variables measured are provided, 1.3 The tests described in this re ort were performed according-9411/A1. Pila-410to the PAN Tests PCC Performance Test P an & Procedure, PSI Doc.TM-4 i

i

25A5779 SH No. 4 h'

GENuclearEnergy 1 TEST RESULTS L

2.1 Steady State Test S t TEST OBJECTIVE:

Measure the PCC condenser heat removal capability at nominal inlet conditions of 0.195 kg/s steam flow rate and nominal PCC pool level of 4.5 m. The inlet pressure will be found by having the system float to the pressure for which the condenser performance matches the given steam flow.

TEST DATE/ TIME:

IG:, "),1995 / 20:41:55 to 20:59:55 l

DATA RECORDING PERIOD:

Start:0 sec Stop:1080 sec DATA ANAINSIS PERIOD:

Start:100 sec Stop:700 sec l

RAW DATA FDINAMFa panda _SI.dat IJST OF FAIII.D OR UNAVAII.ABIE INSTRUMENTS REQUIRED FOR TEST PER TABLE 5.5 OF ALPHA-410:

(An evaluai on determined that it was acceptabic for this flow measurement to not i

3 MV.GRT l

meet the accuracy requirenients for tests Si through SG, because it was redundant with flowmeter l

MV.PSC.)

l DEVIATIONS FROM TEST PRCCEDURE:

l liasically no deviations from the rat procedure with the exception of adding the steps No. 93.2 and No. 235A for rero check of flowmeters for MV.PSC and MV.GRT.

PROBIEM3:

None IIAS TIIE TEST OBJECTIVE BEEN r.is.a/ ?-

Yes IIAVE TIIE DATA BFIN CORRECTIN RECORDED :

l Yes I

4 i

1 i

I

. Y

I25A5779 sH No. 5 h~

GENuclearEneryy j

1 2.2 Steady State Test S2 j

1 TEST OBJECTIVE:

Measure the PCC condenser heat removal capability at nominal inlet conditions of 0.195 kg/s steam flow rate,0.003 kg/s air flow, and 300 kPa inlet pressure and nominal PCC pool level of 4.5 m.

TEST DATE/ TIME:

May 10,1995 /12:50:31 to 18:13:55 DATA RECORDING PERIOD:

Start:0 see Stop:1404 sec DATA ANAINSIS PERIOD:

Start:600 sec Stop:1200 sec RAW DATA FILE NAME:

panda _S2.dat IJST OF FATIED OR UNAVATI ABIE INSTRUMENTS REQUIRED FOR TEST PFR TABIE 5.5 OF AIPIIA 410:

MV.GRT (An evaluation determined that it was acceptabic for this flow measurement to not meet the accuracy requirements for tests S1 through SS, because it was redundant with flowmeter e

MV.PSC.)

DEVIATIONS FROM TEST PROCEDURE:

j Basically no deviations from the test procedure with the exception of adding the steps No. 93.2 and No. 235A for zero check of flowmeters MV.PSC and MV.GRT.

PROBIIMS:

None IIAS TIIE TEST OBJECTIVE BFEN RFACIIED:

Yes IIAVE TIIE DATA BEEN CORRECTIN RECORDED :

Yes l

e

a 25A5779 sit No. 6 h'

GENucsaarEneryy 2.3 Steady State Test S3 TEST OBJECTIVE:

Measure the PCC condenser heat removal capability at nominal inlet conditions of 0.195 kg/s steam flow rate,0.006 kg/s air flow, and 300 kPa inlet pressure and nominal PCC pool level of.

4.5 m.

TEST DATE/ TIME:

May 10,1995 /14:17:42 to 14:41:44 DATA FECORDING PERIOD:

Start:0 see Stop: 1442 see DATA ANAINSIS PERIOD:

Start: 400 sec Stop: 1000 sec RAW DATA FHE NAME:

panda _SS.dat IJST OF FAIIED OR UNAVATI ABIE INSTRUMENTS REQUIRFD FOR TEST PER TABIE 5.5 OF AlJ'HA 410:

MV.GRT (An evaluation determined that it was acceptabic for this flow measurement to not meet the accuracy requirements for tests S1 through S6, because it was redundant with flowmeter MV.P3C.)

DEVIATIONS FROM TEST PROCEDURE:

liasically no deviations from the test procedurc with the exception of adding the steps No. 03.2 and No. 235A for 7cro check of flowmeters MV.PSC and MV.GRT.

PROBIEMS:

None HAS THE TEST OBJECTIVEBEEN RFACHED:

Yes IIAVE 'IllE DATA BFEN CORRECTI.Y RECORDFB :

Yes A

,1 i

'\\

25A5779 su wo.?

O' GENucientEnergy 2.4 Steady State Test S4 TEST OBJECTIVE:

j Measure'the PCC condenser heat removal capability at nominal inlet conditions 010.195 kg/s steam Dow rate,0.016 kg/s air flow, and 300 kPa inlet pressure and nominal PCC poo! level of 4.5 m.

TEST DATE/ TIME:

May 10,1995 /15:32:26 to 15:54:08 DATA RECORDING PERIOD:

4 Start:0 see Stop: 1802 sec DATA ANAINSIS PERIOD:

Start: 100 see Stop: 700 sec RAW DATA FIIE NAME:

panda _S4.dat 1JST OF FARED OR UNAVAII ABIE INSTRUMENTS REQUIRED FOR TFST PER TABIE 5.5 OFALPIIA-410:

MV.GRT (An evaluation determined that it was acceptable for this flow measurement to not meet the accuracy requirements for tests Si through S6, because it was redundant with flowmeter MV.PSC.)

DEVIATIONS FROM TFST PROCEDURE:

PCC pool level MI US is 0.07m too higb(NCR P-006). The steps No. 93.2 and No. 235A for zero check of flowmeters MV.PSC and MV.GRT were added to the test procedure.

PROBLEMS:

Nonc 1

IIAS TIIE TE7F OBJECTIVE BEEN RFACIIED:

l Yes HAVE TIIE DATA BFEN CORRECTIN RECORDFJ) :

Yes

)

25A5779 sn No. 8 GENuclearEnergy 2.5 Steady State Test S5 TFST OBJECTIVE:

Mcasure the PCC condenser heat removal capability at nominal inlet conditions of 0.105 kg/s steam flow rate,0.034' kg/s air flow, and 300 kPa inlet pressure and nominal PCC pool level of 4.5 m.

TEST DATE/ TIME:

May 10,1995 /16:44:22 to 17:03:40 DATA RECORDING PERIOD:

Start:0 see Stop: 1158 sec DNTA ANAI,YSIS PERIOD:

Start: 300 see Stop: 900 sec RAW DATA FIIE.NAME:

panda _S5.dat IJST OF FAllE.D OR UNAVAII ABIE, INSTRUMENTS REQUIRED FOR TFST PER TABI.E 5.5 OF A1.PIIA-410:

MV.GRT (An evaluation determined that it was acceptable for this flow measurement to not meet the accuracy requirements for tests S1 through SG, because it was redundant with flowmeter MV.PSC.)

i DEVIATIONS FROM TEST PROCEDURE:

l liasically no deviations from the test procedure with the exception of adding the steps No. 93.2 l

and No. 235A for rero check of flowmeters MV.PSC and MV.GRT.

1 l

PROlllE.MS:

Nonc j

IIAS TIIE TFST OBJECTIVE BFE.N REACIIED:

l Yes l

HAVE TIIE DATA IIEEN CORRECT!.Y RECORDED :

Yes

  • The test was actually performed at 0.027 kg/s, which was acceptable per Al, Pila 410.

I l

l l

\\

25A5779 sH No. 9 h

GENuclearEneryy 2.6 Steady State Test SG TEST OBJECTIVE:

Measure the PCC condenser heat removal capability at nominal inlet conditions of 0.260 kg/s steam flow rate and nominal PCC pool level of 4.5 m. The inlet pressure will be found by having the sptem float to the pressure for which the condenser performance matches the given steam flow.

TFST DATE/ TIME:

hiay 10,1995 /19:12:29 to 19:30:39 DATA RECORDING PFRIOD:

Start:0 see Stop:1090 sec DATA ANAINSIS PERIOD:

Start:300 sec Stop:900 sec RAW DATA FIIE NAME:

panda S6.dat i

I.IST OF FAIIED OR UNAVAIIABIE INSTRUMENTS REQ'UIRED FOR TEST PER TABIE 5.5 OF AI.PIIA 410:

MV.GRT (An evaluation determined that it was acceptable for this flow measurement to not meet the accuracy requirements for tests Si through S6, because it us redundant with flowmeter MV.PSC.)

DEVIATIONS FROM TEST PROCEDURE:

Basically no deviations from the test procedure with the exception of adding the steps No. 93.2 and No. 235A for rcro check of flowmeters for MV.P3C and MV.GRT.

PROBIEMS:

None IIAS THE TFST OBJECTIVE BEEN RIMCITED:

Yes IIAVE TIIE DATA BFIN CORRECTLY RECORDED :

Yes u

25A5779 sn No.10 h

GENuclearEneryy PANDA STFADY STATE PCC PERFORMANCE TEST (S series tests)

VARIAlli.E PROCESS ID UNIT Steam flow to PCC3 MV llF g/s Air flow to PCC3 MM.110G g/s PCCS upper header pressure MP.llF bar PCCS poollevel MI..US m

Condensate flow (PCCS to GDCS)

MV.P3C g/s Condensate temperaturc at GDCS MTI..P3C.1

'O inlet Condensate temperature at PCCS MTI..PSC.2

  • C outlet Gas temperature in PCC3 vent line MTG.PSV.1

'C PCC3 vent line pressure MP.P3V bar RPV level MI..RP.1 m

RPV presn.rc MI'.RP.1 bar Air / steam temp. in steady state supply MTG.P2F.1

'C line Steam temperature in steady state MTG.P3F.1

  • C supply line PCC3 condensate temp, in GDOS MTI GRT.1

'O drain PCCS condensate temp. at RPV inlet MTI..GRT.2

'O l'CCS vent line outict temperature MTG.P3V.2

  • C PCCS gas temp,in upper drum MTG.P3.1
  • C i

i

g, 1

s O

25A5779 SH NO. I I h

GENuclearEnergy

" N ^'

  • PANDA STEADY STATE PCC PERFORMANCE TEST (S series tests)

VARI Alli.E PROCESS ID UNIT PCCS gas temp. in lower drum MTG.P3.2

'O PCC3 condensate temp. in lower MTI..P3

  • C drum PCC3 center line gas temperatures in MTG.P3.3

'C center tube MTG.P3.4 eC MTG.P3.5 MTG.P3.6

'O MTG.P3.7

'O MTG.P3.9

'O

'C PCC3 pool fluid temperatures in MTI US.2

'O condenser vertical center axis MTi US.13 eC MTI..U3.19

'O PCC3 pool fluid temperatores outside MTI..U3.1

'C condenser MTI..U3.11

'O MTI..US.18 eC 1

-.