Responds to NRC Re Violations Noted in Insp Rept 50-255/84-06.Corrective Actions:Detailed Radiological Work Plan Developed,Reliable Underwater Survey Equipment Procured & Personnel Failing to Document Surveys Counseled
ML20095F460
Person / Time
Site: Palisades 
Issue date: 08/15/1984
From: Vandewalle D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20095F427 List:
References
NUDOCS 8408270281
Download: ML20095F460 (6)


Text

.

c-o O',

Consumers Power company General offices: 1945 West Parnell Road, Jackson, MI 49201. (517) 788-C550 August 15, 1984 James G Keppler, Administrator Region III US Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137 DOCKET 50-255 - LICENSE DPR PALISADES PLANT - RESPONSE TO IE INSPECTION REPORT 84-06 IE inspection Report 50-255/84-06 dated July 11, 1984 identified four items of noncompliance. These items were discussed with your staff in an enforcement conference held on April 27, 1984. A telephone conversation between PCLovendale of your staff and TCBordine of Consumers Power Company on August 10, 1984 extended the response date for these items to August 17, 1984. The following is our response to the items:

Noncompliance (50-255/84-06-05) 10 CFR 20.101(b) states in part that during any calendar quarter total occupa-tional dose to the whole body of an individual shall not exceed 3 rems. " Dose to the whole body" is deemed to include any dose to the whole body, gonads, active blood-forming organs, head and trunk, or lens of eye.

Contrary to the above, an individual who worked as a diver in the refueling cavity during the first calendar quarter in 1984 received a dose of about 4.5 rems to the right leg above the knee, a portion of the body covered by the whole body dose limit of 3 rems per quarter.

Corrective Action Taken and Results Achieved During a routine check of the diver's dosimetry between work periods a high exposure was determined. At that time a radiological Stop Work Order was issued by the Duty Health Physicist. An investigation team, designated by the Plant Manager, conducted a thorough review of the incident and its precursors.

In a formal written report, the investigation team concluded:

1. Management controls for radiological work failed. Health Physica planning had been performed, particularly with respect to dosimetry; however, it was not comprehensive, and was not integrated into the maintenance planning, as would have been appropriate.

OC0884-0006A-NLO2 b5 Mbi7 $4 D

0 0

PDR

~.

D.

JCKeppl r, Ad:1:ictrat:r 2

Palisades Plant RESPONSE TO IEIR 84-06 August 15, 1984

2. A failure occurred at the technician level to properly communicate several pieces of critical survey information, both between shifts and to their supervision. These survey results, significantly at odds with the prejob survey, failed to trigger either a halt to the work or a review of the Radiation Work Permit controls as required by procedures.
3. Insufficient time was applied to analyzing the risks associated with the unexpected repair work to the fuel transfer equipment. The presence of highly mobile, high specific activity crud from fuel handling was not recognized. Other high radiation area work (eg, entry under the reactor vessel for cleaning) going on during the same period diluted the ALARA planning resources. The need for Radiation Protection Management to carefully monitor and, if necessary, limit the quantity of high risk radiation work proceeding simultaneously is a principal lesson reinforc-ed by this incident.

The investigation report developed extensive remedial and permanent corrective actions. The diving work was permitted to proceed only after a detailed Radiological Work Plan was developed, which included partial decontamination of the work area and coverage by a dedicated health physics technician team under an experienced senior technician and closely supervised by the Duty Health Physicist. The work was completed under this plan, with an additional dose commitment of less than 100 mrem.

As discussed in the NRC inspection report, a technical evaluation of the extensive dosimetry information available, including consideration of the age of the individual involved, led to a conservatively estimated whole body dose assignment to the diver of 1630 mrem. As a result of the NRC determination expressed in this item of noncompliance, a revised Termination Report has been forwarded to the individual.

In that report, we have explained the circum-stances of the change and indicated what actions he should take to notify any subsequent employers. We have expressed our willingness to meet with him and assist him, if needed.

Corrective Action to be Taken to Avoid Further Noncompliance An discussed at the enforcement conference held on April 27, 1984, actions taken to prevent recurrence of unwarranted exposures of this nature are as follows:

1. A formal Radiation Work Plan, incorporating the generic precautions for any radiological diving work, han been promulgated.
2. A policy has been established whereby work in high radiation areas 21R/hr requires the presence of an experienced Health Physics management person on site. Exceptionn to this policy must be approved by the Radiation Protection Manager.
3. Nes, more reliable underwater survey equipment has been procured.

In future diving work, a minimum of two underwater survey instruments will be used, one always in immediate proximity to the diver.

OC0884-0006A NLO2

f??

0 y-t 4:

'*?

.JGKepplOr,'Ad;inistr tor 3

Palisades Plant RESPONSE TO'IEIR 84-06 August. 15, 1984

4. Detailed reviews of the incident were conducted by the Radiation Protec-tion Manager for all health physics technicians and, independently, with l

their supervisors,-on all aspects of the inve'stigation and the noncompli-ances identified in the NRC inspection report. Particular emphasis was given to procedural compliance and awareness to changing radiological

' conditions including initiating or altering actions based on the chang-h

. ing conditions and resisting the momentum of any job if time is needed to properly resolve problems.

5. The lessons learned from this event have been promulgated to other plant departments and, as appropriate, throughout the company. Particularly, these lessons are being incorporated in both the ALARA and Chemistry /

Health Physics Technician training courses.

6. A formal Radiation Work Plan has been developed for decontamination of the fuel handling upender tilt pits.
7. As part of the Refueling Outage Health Physics Report, a post-job review j

of all work on fuel handling equipment has been performed. Action items j.

to incorporate ALARA precautions in future planning have been identi-fied.

Data When Full Compliance Will be Achieved Full compliance has been achieved. The above stated actions are complete.

Noncompliance (50-255/84-06-02)

Technical Specification 6.12 requires that any individual entering a high radiation area be provided with a dose rate monitoring device, or be provided with a dose rate integrating device which alarms at a preset dose (surveyed areas only), or be accompanied by an individual qualified in radiation protec-tion procedures who is equipped with a dose rate monitoring device, who provides positive control over activities, and who performs periodic surveys as specified by the radiation work permit.

Contrarf to the above, on March 18, 1984, a diver made three entries into the refueling cavity tilt machine area, a high radiation area, without being provided with a dose rate monitoring device or a dose rate integrating device or without being accompanied by an individual qualified in radiation protec-tion who was equipped with a dose rate monitoring device and who provided the required controls and monitoring.

Corrective Actions Taken and Reculta Achieved In the investigation of this incident, it was determined that, although no dives occurred without a workable survey instrument in the water, the techni-cians providing coverage for the job did not employ the instruments in direct proximity to the diver as required to meet the procedural and Technical Specifications requirements. This deficiency was corrected in the detailed t

DC0884-0006A-NLO2 l

p.

1 JGKapplOr, Ad inistr:t r 4

Palisades Plant RESPONSE TO IEIR 84-06 August 15, 1984 plan for the resumption of repair work. The work was completed in full compliance with survey requirements.

Corrective Actions Taken to Avoid Further Noncompliance In the review of this incident with the health physics staff, special emphasis was placed on the need for representative surveys under all circumstances where a high radiation area may exist. Techniques to deal with the additional complications posed by surveying underwater were discussed.

IE Information Notice 82-31 was again reviewed and the requirement for use of a minimum of two underwater survey instruments has been implemented.

Date When Full Compliance Will be Achieved Full compliance has been achieved, i

Noncompliance (50-255/84-06-04)

Technical Specification 6.11 states that procedures for personal radiation protection shall be prepared consistent with 10 CFR Part 20 and shall be approved, maintained, and adhered to for all operations involving personal radiation exposure.

I

1. Procedure No 7.02, "ALARA Program", requires that an ALARA review be conducted if, among other things, a potential exists for individual exposure to general area radiation levels greater than 1000 mroms/ hour; an individual is expected to exceed 1500 mrems whole body dose for a given task in a calendar year; or loose surface contamination exceeds 2

100,000 dpm/100cm,

Contrary to the above, no ALARA review was conducted of the refueling cavity tilt machine repair job even though surveys and dose estimates indicated that dose rates might exceed 1000 mrem / hour, that the diver's whole body dose was expected to exceed 1500 mrems for the job, and that contamination levels (dry) exceeded' 100,000 dpm/100 cm (SIC).

3

2. Procedure No 7.03, " Radiation Work Permit", requires that a job be secured (stopped) if unplanned changes in working conditions occur which might invalidate the basis for an applicable radiation work permit.

Contrary to the above, the refueling cavity tilt machine repair job was not stopped even though radiation levels in the work area as high as seven times greater than those identified on the radiation work permit were, identified.

3. Procedure No HP 2.14, " Radiological Survey Requirements", states that radiation work permits shall include applicabic requirements for contin-i uous, intermittent, and/or pre-job and post-job surveys.

1 Contrary to the above, the radiation work permit written for the refueling cavity tilt machine repair job did not contain any survey requirements.

1 OC0884-0006A-NLO2 I

~

g--

i c-JGKeppihr, Ad inistrater 5

Palisades Plant RESPONSE TO IEIR 84-06 tAugust 15, 1984 Surveys conducted during the diving operation were not sufficient to identify the existing radiological. conditions.

Corrective Action Taken and-Results Achieved.

A detailed ALARA review was performed prior to lifting the "Stop Work" order l

on repair of the fuel.bandling equipment. All requirements of Administrative Procedures"7.02, 7.03 and Health Physics Procedure HP 2.14 were complied with.

Corrective Action to be Taken to Avoid Future Noncompliance In the. reviews of the incident, health physics personnel were instructed in l

the appropriate procedural requirements. The Training Department has been

'provided with full details of the event to be used for future Technician and i

ALARA training with emphasis on underwater procedures and the importance of ALARA reviews.

Date When Full Compliance Will be Achieved L

l Fu11' Compliance has been achieved.

Noncompliance (50-255/84-06-01) 10 CFR 20.401 requires that records be maintained of surveys made by the l

licensee to determine compliance with NRC regulations.

l l

Contrary to the above, no records were maintained of radiation surveys conduc-ted on March 18, 1984, to assess the underwater radiation hazards present in the refueling cavity tilt machine area.

Corrective Action Taken and Results Achieved Individuals who failed to properly document surveys were counselled on the importance of this basic technician responsibility. The cause and effect relationship between undocumented surveys and the eventual diver overexposure was stressed to these personnel.

Corrective Action to be Taken to Avoid Future Noncompliance The significance of this noncompliance was addressed to health physics personnel in the reviews of the entire incident. The Training Department has been provided similar information to be included in future Technician and ALARA training courses.

l l

OC0884-0006A-NLO2

b

,, ci LJGKepplcr, Adminictretcr 6

Palisades Plant RESPollSE TO IEIR 84-06 August 15, 1984 Date When Full Compliance Will be Achieved I.

l-Full compliance has been achieved.

$d. auddl!

David andeWalle Director, Nuclear Licensing i

I CC Director, Office of Nuclear Reactor Regulation l

Director, Office of Inspection and Enforcement i

NRC Resident Inspector - Palisades I

l OC0884-0006A-NLO2

- ~